Vapor Recovery Units Sample Clauses

Vapor Recovery Units. All Vessels loading the Cargo which has or possesses a vapor pressure greater than or equal to 1.5 psi must be fitted with vapor recovery equipment and have aboard a valid "Vapor Tightness Certificate.. Vessels scheduled to load this material that are not fitted with vapor recovery equipment and/or fail to have aboard a valid "Vapor Tightness Certificate'' will not be accepted at the designated Shore Facilities. Notwithstanding anything to the contrary set forth in this subsection III.I.3, all vapor recovery system operations shall be conducted pursuant to Part 39, Title 48 of the Code of Federal Regulations, as such may be amended from time to time.
AutoNDA by SimpleDocs

Related to Vapor Recovery Units

  • Unbundled Sub-Loop Distribution Intrabuilding Network Cable (USLD-INC) is the distribution facility owned or controlled by BellSouth inside a building or between buildings on the same property that is not separated by a public street or road. USLD-INC includes the facility from the cross connect device in the building equipment room up to and including the point of demarcation at the End User’s premises.

  • Disaster Recovery PFPC shall enter into and shall maintain in effect with appropriate parties one or more agreements making reasonable provisions for emergency use of electronic data processing equipment to the extent appropriate equipment is available. In the event of equipment failures, PFPC shall, at no additional expense to the Fund, take reasonable steps to minimize service interruptions. PFPC shall have no liability with respect to the loss of data or service interruptions caused by equipment failure, provided such loss or interruption is not caused by PFPC's own willful misfeasance, bad faith, gross negligence or reckless disregard of its duties or obligations under this Agreement.

  • REMANUFACTURED, RECYCLED, RECYCLABLE OR RECOVERED MATERIALS Upon the conditions specified in the Bid Specifications and in accordance with the laws of the State of New York, Contractors are encouraged to use recycled, recyclable or recovered materials in the manufacture of Products and packaging to the maximum extent practicable without jeopardizing the performance or intended end use of the Product or packaging unless such use is precluded due to health, welfare, safety requirements or in the Bid Specifications. Contractors are further encouraged to offer remanufactured Products to the maximum extent practicable without jeopardizing the performance or intended end use of the Product and unless such use is precluded due to health, welfare, safety requirements or by the Bid Specifications. Where such use is not practical, suitable, or permitted by the Bid Specifications, Contractor shall deliver new materials in accordance with the “Warranties" set forth below. Items with recycled, recyclable, recovered, refurbished or remanufactured content must be identified in the Bid or Bidder will be deemed to be offering new Product.

  • Unbundled Subloop Distribution (USLD) 2.8.2.1 The USLD facility is a dedicated transmission facility that BellSouth provides from an End User’s point of demarcation to a BellSouth cross-connect device. The BellSouth cross-connect device may be located within a remote terminal (RT) or a stand-alone cross-box in the field or in the equipment room of a building. The USLD media is a copper twisted pair that can be provisioned as a 2-wire or 4-wire facility. BellSouth will make available the following subloop distribution offerings where facilities exist: USLD – Voice Grade (USLD-VG) Unbundled Copper Subloop (UCSL) USLD – Intrabuilding Network Cable (USLD-INC (aka riser cable))

  • Cost Recovery for RSTEP Requests by Registry Operator for the approval of Additional Services pursuant to Section 2.1 may be referred by ICANN to the Registry Services Technical Evaluation Panel (“RSTEP”) pursuant to that process at xxxx://xxx.xxxxx.xxx/en/registries/rsep/. In the event that such requests are referred to RSTEP, Registry Operator shall remit to ICANN the invoiced cost of the RSTEP review within fourteen (14) calendar days of receipt of a copy of the RSTEP invoice from ICANN, unless ICANN determines, in its sole and absolute discretion, to pay all or any portion of the invoiced cost of such RSTEP review.

  • Sub-loop Elements 2.8.1 Where facilities permit, BellSouth shall offer access to its Unbundled Sub-Loop (USL) elements as specified herein.

  • Historical Transaction Amounts For each of the two years ended 31 December 2021 and 2022 and the six months ended 30 June 2023, the historical transaction amounts paid by Poly Developments and Holdings Group to the Group in respect of property management services under the 2021-2023 Property Management Services Framework Agreements were RMB197.9 million, RMB202.5 million and RMB80.3 million, respectively.

  • Commingling of Resold Services with Unbundled Network Elements and Combinations of Unbundled Network Elements 6.7.1 To the extent it is Technically Feasible and pursuant to the terms of Section 9.1, CLEC may Commingle Telecommunications Services purchased on a resale basis with an Unbundled Network Element or combination of Unbundled Network Elements.

  • Clearcutting Units All trees that meet Utilization Standards within “Clearcutting Units” are designated for cutting.

  • Unbundled Copper Sub-Loop (UCSL) is a copper facility of any length provided from the cross-box in the field up to and including the End User’s point of demarcation. If available, this facility will not have any intervening equipment such as load coils between the End User and the cross-box.

Time is Money Join Law Insider Premium to draft better contracts faster.