Vacating Home Sample Clauses

Vacating Home. Owner shall vacate the Home and remove all personal property, fixtures and appliances from Home on or before the date Owner gave NCORR at the closing or by the date Owner provided NCORR in compliance with the Post- Closing Instructions Owner received at closing.
AutoNDA by SimpleDocs
Vacating Home. Owner shall vacate the Home and remove all personal property, fixtures and appliances from the area of the Home that shall be under construction on or before the date Owner gave NCORR at the closing. The Rooms which must be clear of all personal property, fixtures and appliances are:
Vacating Home. Owner shall vacate the Home and remove all personal property, fixtures and appliances from Home on or before the date established during construction.
Vacating Home. Owner shall vacate the Home and remove all personal property, fixtures and appliances from Home on or before the date agreed upon with CM and NCORR.

Related to Vacating Home

  • Cemetery The Local Church agrees and insures that, after the Disaffiliation Date, its cemetery and/or columbarium, will continue to be maintained in substantially the same manner as presently maintained. In addition, Local Church will honor any and all contracts, deeds, and agreements for burial and/or internment in its cemetery or columbarium, as well as insuring and continued access for families and loved ones of United Methodists buried there and for burials in unfilled xxxxxx and columbarium slots (including granting an access easement to the Conference and members of the United Methodist Church for visitations, historical research, and related purposes).

  • Premises defective, dangerous or unsafe condition of the facilities; falls; collisions with objects, walls, equipment or persons; dangerous, unsafe, or irregular conditions on floors, ice, or other surfaces, extreme weather conditions; travel to and from premises.

  • Water Service The Purchase Price for the Property shall include all water rights/water shares, if any, that are the legal source for Seller’s current culinary water service and irrigation water service, if any, to the Property. The water rights/water shares will be conveyed or otherwise transferred to Buyer at Closing by applicable deed or legal instruments. The following water rights/water shares, if applicable, are specifically excluded from this sale:

  • SHOPPING CENTRES 1. The general terms and provisions of the VBIA shall apply to “Shopping Centres” (as defined) with the following variations:

  • Gardens Lawns, xxxxxx, flower beds, trees, shrubs, outside walls and fences.

  • Site Lands or areas indicated in the Contract Documents as being furnished by the Owner upon which the Work is to be performed, including rights-of-way and easements for access thereto, and such other lands furnished by the Owner that are designated for the use of the Contractor. Also referred to as Project Site, Job Site and Premises.

  • PAVING Provide a standard bubble map, as part of the plans, showing locations of numbered points, and a table with point number, northing and easting coordinates, description, and BL station for each point, for the following: ▪ all platted control irons (set or not), including plat boundary irons, for the entire sub-division, not just the current phase ▪ benchmarks, including TBM set with preliminary survey In addition to the required coordinate information, the following shall be included in all plans, at a minimum, as needed for construction staking on all City projects. ▪ Include copy of plat(s) on all plans, as relevant and approved by the Design Engineer ▪ Benchmarks – minimum of two City standards, four total desirable; as close to project as possible, even if TBM set with preliminary survey. ▪ Benchmark elevations must be in the same datum as the design (i.e. NAV 88 design needs NAV 88 benchmarks, not NAV 29) ▪ All control irons/identified property irons shall be shown on plans, with BL stationing and offset ▪ Show deflection angles in BL, and/or bearing/azimuth of BL sections ▪ Arterial project side streets – provide BL station at CL of intersection of the two streets, on the BL; BL station and offset to CL of side street at removal limits; include deflection angle from BL to CL of side street ▪ Existing FL/pavement grades shown at all match points ▪ Top of curb grades and stationing at all ends-of-return and horizontal/vertical P.I.’s, not just even stationing ▪ CL top of pavement grades for arterial ▪ CL elevation for streets on mass grading work @ 100’ Sta in tangent sections and 50’ on curves.

  • Pavement The combined surface course, base course, and subbase course, if any, considered as a single unit.

  • Drainage Systems (1) Clear culvert inlets, outlets, and sediment catching basins.

  • Landscape Develop and coordinate landscape design concepts entailing analysis of existing conditions, proposed components and how the occupants will use the facility. Include location and description of planting, ground improvements and visual barriers.

Time is Money Join Law Insider Premium to draft better contracts faster.