Updated Information Submission by Developer Sample Clauses

Updated Information Submission by Developer. The updated information submission by the Developer, including manufacturer information, shall occur no later than one hundred eighty (180) Calendar Days prior to the Trial Operation. Developer shall submit a completed copy of the Large Generating Facility data requirements contained in Appendix 1 to the Large Facility Interconnection Procedures. It shall also include any additional information provided to Connecting Transmission Owner for the Interconnection Feasibility Study and Interconnection Facilities Study. Information in this submission shall be the most current Large Generating Facility design or expected performance data. Information submitted for stability models shall be compatible with NYISO standard models. If there is no compatible model, the Developer will work with a consultant mutually agreed to by the Parties to develop and supply a standard model and associated information. If the Developer’s data is different from what was originally provided to Connecting Transmission Owner and NYISO pursuant to an Interconnection Study Agreement among Connecting Transmission Owner, NYISO and Developer and this difference may be reasonably expected to affect the other Parties’ facilities or the New York State Transmission System, but does not require the submission of a new Interconnection Request, then NYISO will conduct appropriate studies to determine the impact on the New York State Transmission System based on the actual data submitted pursuant to this Article 24.3. Such studies will provide an estimate of any additional modifications to the New York State Transmission System, Connecting Transmission Owner’s Attachment Facilities, or System Upgrade Facilities or System Deliverability Upgrades based on the actual data and a good faith estimate of the costs thereof. The Developer shall not begin Trial Operation until such studies are completed. The Developer shall be responsible for the cost of any modifications required by the actual data, including the cost of any required studies.
AutoNDA by SimpleDocs
Updated Information Submission by Developer. The updated information submission by the Developer, including manufacturer information, shall occur no later than one hundred eighty (180) Calendar Days prior to the Trial Operation. Developer shall submit a completed copy of the Large Generating Facility data requirements contained in Appendix 1 to the Large Facility Interconnection Procedures. It shall also include any additional information provided to Transmission Owner for the Interconnection Feasibility Study and Interconnection Facilities Study. Information in this submission shall be the most current Large Generating Facility design or expected performance data. Information submitted for stability models shall be compatible with NYISO standard models. If there is no compatible model, the Developer will work with a consultant mutually agreed to by the Parties to develop and supply a standard model and associated information. If the Developer's data is materially different from what was originally provided to Transmission Owner and NYISO pursuant to an Interconnection Study Agreement among Transmission Owner, NYISO and Developer, then NYISO will conduct appropriate studies to determine the impact on the New York State Transmission System based on the actual data submitted pursuant to this Article 24.3. The Developer shall not begin Trial Operation until such studies are completed.
Updated Information Submission by Developer. The updated information submission by the Developer, including manufacturer information, shall occur no later than one hundred eighty (180) Calendar Days prior to the Trial Operation. Information in this submission shall be the most current Transmission Project design or expected performance data. Information submitted for stability models shall be compatible with NYISO standard models. If there is no compatible model, the Developer will work with a consultant mutually agreed to by the Parties to develop and supply a standard model and associated information. If Developer’s data is different from what was originally provided to Connecting Transmission Owner and this difference may be reasonably expected to affect the other Party’s facilities or the New York State Transmission System, then Connecting Transmission Owner and Developer will conduct appropriate studies to determine the impact on the New York State Transmission System based on the actual data submitted pursuant to this Article 24.3. Such studies will provide an estimate of any additional modifications to the New York State Transmission System, Connecting Transmission Owner’s Attachment Facilities, or System Upgrade Facilities based on the actual data and a good faith estimate of the costs thereof. Developer shall not begin Trial Operation until such studies are completed. Developer shall be responsible for the cost of any modifications required by the actual data, including the cost of any required studies.
Updated Information Submission by Developer. The updated information submission by the Developer, including manufacturer information, shall occur no later than one hundred eighty (180) Calendar Days prior to the Trial Operation. Developer shall submit a completed copy of the Large Generating Facility data requirements contained in Appendix 1 to the Large Facility Interconnection Procedures. It shall also include any additional information provided to National Grid for the Interconnection Feasibility Study and Interconnection Facilities Study. Information in this submission shall be the most current Large Generating Facility design or expected performance data. Information submitted for stability models shall be compatible with NYISO standard models. If there is no compatible model, the Developer will work with a consultant mutually agreed to by the Parties to develop and supply a standard model and associated information. 63
Updated Information Submission by Developer. The updated information submission by the Developer, including manufacturer information, shall occur no later than one hundred eighty (180) Calendar Days prior to the Trial Operation. Developer shall submit a completed copy of the Large Generating Facility data requirements contained in Appendix 1 to the Large Facility Interconnection Procedures. It shall also include any additional information provided to Transmission Owner for the Interconnection Feasibility Study and Interconnection Facilities Study. Information in this submission shall be the most current Large Generating Facility design or expected performance data. Information submitted for stability models shall be compatible with NYISO standard models. If there is no compatible model, the Developer will work with a consultant mutually agreed to by the Parties to develop and supply a standard model and associated information. If the Developer’s data is materially different from what was originally provided to Transmission Owner and NYISO pursuant to an Interconnection Study Agreement among Transmission Owner, NYISO and Developer, then NYISO will conduct appropriate studies to determine the impact on the New York State Transmission System based on the actual data submitted pursuant to this Article 24.3. The Developer shall not begin Trial Operation until such studies are completed. Information Supplementation. Prior to the Commercial Operation Date, the Developer and Transmission Owner shall supplement their information submissions described above in this Article 24 with any and all “as-built” Large Generating Facility information or “as-tested” performance information that differs from the initial submissions or, alternatively, written confirmation that no such differences exist. The Developer shall conduct tests on the Large Generating Facility as required by Good Utility Practice such as an open circuit “step voltage” test on the Large Generating Facility to verify proper operation of the Large Generating Facility’s automatic voltage regulator. Unless otherwise agreed, the test conditions shall include: (1) Large Generating Facility at synchronous speed; (2) automatic voltage regulator on and in voltage control mode; and (3) a five percent change in Large Generating Facility terminal voltage initiated by a change in the voltage regulators reference voltage. Developer shall provide validated test recordings showing the responses of Large Generating Facility terminal and field voltages. In the event...
Updated Information Submission by Developer. The updated information submission by Developer, including manufacturer information, shall occur no later than 180 Calendar Days prior to the Trial Operation Information in this submission shall be the most current Transmission Project design or expected performance data. Information submitted for stability models shall be compatible with NYISO standard models. If there is no compatible model, Developer will work with a consultant mutually agreed to by the Parties to develop and supply a standard model and associated information. If Developer’s data is different from what was originally provided to Connecting Transmission Owner and this difference may be reasonably expected to affect the other Connecting Transmission Owner’s facilities or the New York State Transmission System, then Connecting Transmission Owner and the Developer will conduct appropriate studies to determine the impact on the New York State Transmission System based on the actual data submitted pursuant to this Article 24.3. Such studies will provide an estimate of any additional modifications to the New York State Transmission System, or System Upgrade Facilities based on the actual data and a good faith estimate of the costs thereof. Developer shall not begin Trial Operation until such studies are completed. Developer shall be responsible for the cost of any modifications required by the actual data, including the cost of any required studies.
Updated Information Submission by Developer. The updated information submission by the Developer, including manufacturer information, shall occur no later than one hundred eighty (180) Calendar Days prior to the Trial Operation. Developer shall submit a completed copy of the Large Generating Facility data requirements contained in Appendix 1 to the Large Facility Interconnection Procedures. It shall also include any additional information provided to Transmission Owner for the Interconnection Feasibility Study and Interconnection Facilities Study. Information in this submission shall be the most current Large Generating Facility design or expected performance data. Information submitted for stability models shall be compatible with NYISO standard models. If there is no compatible model, the Developer will work with a consultant mutually agreed to by the Parties to develop and supply a standard model and associated information. Issued by: Xxxxxx X. Xxxxxxxx, Dir. Reg. Affairs Effective: April 2, 2008 Issued on: April 23, 2008 New York Independent System Operator, Inc. FERC Electric Tariff, Original Volume Xx. 0 Xxxxxxxx Xxxxx Xx. 00 Service Agreement No. 1311 If the Developer’s data is materially different from what was originally provided to Transmission Owner and NYISO pursuant to an Interconnection Study Agreement among Transmission Owner, NYISO and Developer, then NYISO will conduct appropriate studies to determine the impact on the New York State Transmission System based on the actual data submitted pursuant to this Article 24.3. The Developer shall not begin Trial Operation until such studies are completed.
AutoNDA by SimpleDocs

Related to Updated Information Submission by Developer

  • Updated Information Submission by Interconnection Customer The updated information submission by the Interconnection Customer, including manufacturer information, shall occur no later than one hundred eighty (180) Calendar Days prior to the Trial Operation. The Interconnection Customer shall submit a completed copy of the Electric Generating Unit data requirements contained in Appendix 1 to the LGIP. It shall also include any additional information provided to the Participating TO and the CAISO for the Interconnection Studies. Information in this submission shall be the most current Electric Generating Unit design or expected performance data. Information submitted for stability models shall be compatible with the Participating TO and CAISO standard models. If there is no compatible model, the Interconnection Customer will work with a consultant mutually agreed to by the Parties to develop and supply a standard model and associated information. If the Interconnection Customer's data is materially different from what was originally provided to the Participating TO and the CAISO for the Interconnection Studies, then the Participating TO and the CAISO will conduct appropriate studies pursuant to the LGIP to determine the impact on the Participating TO’s Transmission System and affected portions of the CAISO Controlled Grid based on the actual data submitted pursuant to this Article 24.3. The Interconnection Customer shall not begin Trial Operation until such studies are completed and all other requirements of this LGIA are satisfied.

  • Information Submission by Participating TO The initial information submission by the Participating TO shall occur no later than one hundred eighty (180) Calendar Days prior to Trial Operation and shall include the Participating TO’s Transmission System information necessary to allow the Interconnection Customer to select equipment and meet any system protection and stability requirements, unless otherwise agreed to by the Participating TO and the Interconnection Customer. On a monthly basis the Participating TO shall provide the Interconnection Customer and the CAISO a status report on the construction and installation of the Participating TO’s Interconnection Facilities and Network Upgrades, including, but not limited to, the following information: (1) progress to date; (2) a description of the activities since the last report; (3) a description of the action items for the next period; and (4) the delivery status of equipment ordered.

  • Application and Submission Information In addition to the application and submission language discussed in PART II: Section I, you must include the following in your application:

  • Confidentiality and Safeguarding of University Records; Press Releases; Public Information Under this Agreement, Contractor may (1) create, (2) receive from or on behalf of University, or (3) have access to, records or record systems (collectively, University Records). Among other things, University Records may contain social security numbers, credit card numbers, or data protected or made confidential or sensitive by Applicable Laws. [Option (Include if University Records are subject to FERPA.): Additional mandatory confidentiality and security compliance requirements with respect to University Records subject to the Family Educational Rights and Privacy Act, 20 United States Code (USC) §1232g (FERPA) are addressed in Section 12.41.] [Option (Include if University is a HIPAA Covered Entity and University Records are subject to HIPAA.): Additional mandatory confidentiality and security compliance requirements with respect to University Records subject to the Health Insurance Portability and Accountability Act and 45 Code of Federal Regulations (CFR) Part 160 and subparts A and E of Part 164 (collectively, HIPAA) are addressed in Section 12.26.] Contractor represents, warrants, and agrees that it will: (1) hold University Records in strict confidence and will not use or disclose University Records except as (a) permitted or required by this Agreement, (b) required by Applicable Laws, or (c) otherwise authorized by University in writing; (2) safeguard University Records according to reasonable administrative, physical and technical standards (such as standards established by the National Institute of Standards and Technology and the Center for Internet Security [Option (Include if Section 12.39 related to Payment Card Industry Data Security Standards is not include in this Agreement.):, as well as the Payment Card Industry Data Security Standards]) that are no less rigorous than the standards by which Contractor protects its own confidential information; (3) continually monitor its operations and take any action necessary to assure that University Records are safeguarded and the confidentiality of University Records is maintained in accordance with all Applicable Laws and the terms of this Agreement; and (4) comply with University Rules regarding access to and use of University’s computer systems, including UTS165 at xxxx://xxx.xxxxxxxx.xxx/board-of-regents/policy-library/policies/uts165-information-resources-use-and-security-policy. At the request of University, Contractor agrees to provide University with a written summary of the procedures Contractor uses to safeguard and maintain the confidentiality of University Records.

  • Background Information (A) The Adviser has entered into an Investment Adviser's Agreement with the Fund ("Investment Adviser's Agreement"). Pursuant to the Investment Adviser's Agreement, the Adviser has agreed to render investment advisory and certain other management services to all of the funds of the Fund, and the Fund has agreed to employ the Adviser to render such services and to pay to the Adviser certain fees therefore. The Investment Adviser's Agreement recognizes that the Adviser may enter into agreements with other investment advisers who will serve as fund managers to the funds.

  • Confidentiality of Contractor Information The Contractor acknowledges and agrees that this Contract and any and all Contractor information obtained by the State in connection with this Contract are subject to the State of Vermont Access to Public Records Act, 1 V.S.A. § 315 et seq. The State will not disclose information for which a reasonable claim of exemption can be made pursuant to 1 V.S.A. § 317(c), including, but not limited to, trade secrets, proprietary information or financial information, including any formulae, plan, pattern, process, tool, mechanism, compound, procedure, production data, or compilation of information which is not patented, which is known only to the Contractor, and which gives the Contractor an opportunity to obtain business advantage over competitors who do not know it or use it. The State shall immediately notify Contractor of any request made under the Access to Public Records Act, or any request or demand by any court, governmental agency or other person asserting a demand or request for Contractor information. Contractor may, in its discretion, seek an appropriate protective order, or otherwise defend any right it may have to maintain the confidentiality of such information under applicable State law within three business days of the State’s receipt of any such request. Contractor agrees that it will not make any claim against the State if the State makes available to the public any information in accordance with the Access to Public Records Act or in response to a binding order from a court or governmental body or agency compelling its production. Contractor shall indemnify the State for any costs or expenses incurred by the State, including, but not limited to, attorneys’ fees awarded in accordance with 1 V.S.A. § 320, in connection with any action brought in connection with Contractor’s attempts to prevent or unreasonably delay public disclosure of Contractor’s information if a final decision of a court of competent jurisdiction determines that the State improperly withheld such information and that the improper withholding was based on Contractor’s attempts to prevent public disclosure of Contractor’s information. The State agrees that (a) it will use the Contractor information only as may be necessary in the course of performing duties, receiving services or exercising rights under this Contract; (b) it will provide at a minimum the same care to avoid disclosure or unauthorized use of Contractor information as it provides to protect its own similar confidential and proprietary information; (c) except as required by the Access to Records Act, it will not disclose such information orally or in writing to any third party unless that third party is subject to a written confidentiality agreement that contains restrictions and safeguards at least as restrictive as those contained in this Contract; (d) it will take all reasonable precautions to protect the Contractor’s information; and (e) it will not otherwise appropriate such information to its own use or to the use of any other person or entity. Contractor may affix an appropriate legend to Contractor information that is provided under this Contract to reflect the Contractor’s determination that any such information is a trade secret, proprietary information or financial information at time of delivery or disclosure.

  • Required Confidential Information Status Form CONFIDENTIAL INFORMATION SUBMITTED IN RESPONSE TO COMPETITIVE PROCUREMENT REQUESTS OF EDUCATION SERVICE CENTER REGION 8 AND TIPS (ESC8) IS GOVERNED BY TEXAS GOVERNMENT CODE, CHAPTER 552 If you consider any portion of your proposal to be confidential information and not subject to public disclosure pursuant to Chapter 552 Texas Gov’t Code or other law(s), you must attach a copy of all claimed confidential materials within your proposal and put this COMPLETED form as a cover sheet to said materials then scan, name “CONFIDENTIAL” and upload with your proposal submission. (You must include all the confidential information in the submitted proposal. The copy uploaded is to indicate which material in your proposal, if any, you deem confidential in the event the receives a Public Information Request.) ESC8 and TIPS will follow procedures of controlling statute(s) regarding any claim of confidentiality and shall not be liable for any release of information required by law. Upon your claim and your defense to the Office of Texas Attorney General is required to make the final determination whether the information submitted by you and held by ESC8 and TIPS is confidential and exempt from public disclosure. Tobii Dynavox LLC Name of company Xxxx Xxxxxxxx, President, North American Market Printed Name and Title of authorized company officer declaring below the confidential status of material 0000 Xxxxxxx Xx., Suite 400 Pittsburgh PA 15203 800-344-1778 Address City State ZIP Phone ALL VENDORS MUST COMPLETE THE ABOVE SECTION. I DO CLAIM parts of my proposal to be confidential and DO NOT desire to expressly waive a claim of confidentiality of all information contained within our response to the solicitation. The attached contains material from our proposal that I classify and deem confidential under Texas Gov't Code Sec. 552 or other law(s) and I invoke my statutory rights to confidential treatment of the enclosed materials. ATTACHED ARE COPIES OF PAGES OF CLAIMED CONFIDENTIAL MATERIAL FROM OUR PROPOSAL THAT WE DEEM TO BE NOT PUBLIC INFORMATION AND WILL DEFEND THAT CLAIM TO THE TEXAS ATTORNEY GENERAL IF REQUESTED WHEN A PUBLIC INFORMATION REQUEST IS MADE FOR OUR PROPOSAL. Signature Date 2/3/2020 OR I DO NOT CLAIM any of my proposal to be confidential, complete the section below.

  • Access to Protected Information If BA maintains a designated record set on behalf of CE, BA shall make Protected Information maintained by BA or its agents or subcontractors in Designated Record Sets available to CE for inspection and copying within five (5) days of a request by CE to enable CE to fulfill its obligations under state law [Health and Safety Code Section 123110] and the Privacy Rule, including, but not limited to, 45 C.F.R. Section 164.524 [45 C.F.R. Section 164.504(e)(2)(ii)(E)]. If BA maintains Protected Information in electronic format, BA shall provide such information in electronic format as necessary to enable CE to fulfill its obligations under the HITECH Act and HIPAA Regulations, including, but not limited to, 42 U.S.C. Section 17935(e) and 45 C.F.R. Section 164.524.

  • Confidentiality and Disclosure of Offering Materials by Potential Investor Potential Investor acknowledges on behalf of itself and any and all Related Parties that the Offering Materials are considered confidential and proprietary information of Owner and/or HFF, and Potential Investor will not make (or cause or permit any Related Party to make) any Offering Materials available, or disclose any of the contents thereof, to any person without Owner’s or HFF’s prior written consent; provided, however, that the Offering Materials may be disclosed to the Potential Investor’s Representative (if any), the Potential Investor's partners, employees, legal counsel, advisors, institutional lenders and other capital sources (collectively the "Related Parties") as reasonably required for an evaluation of the Property. Such Related Parties shall be informed by Potential Investor of the confidential nature of the Offering Materials and the terms of this Agreement and shall be directed by Potential Investor to keep the Offering Materials and related information strictly confidential in accordance with this Agreement and to otherwise abide by the terms of this Agreement as if such party was the Potential Investor hereunder. In the event any Related Party shall take or omit to take any action which if taken or omitted to be taken by Potential Investor would constitute a breach of or a default under the terms hereof, the such act or omission by such Related Party shall be deemed to be a breach of the terms hereof by Potential Investor.

  • NOTIFICATIONS AND SUBMISSION OF REPORTS Unless otherwise stated in writing after the Effective Date, all notifications and reports required under this IA shall be submitted to the following entities: OIG: Administrative and Civil Remedies Branch Office of Counsel to the Inspector General Office of Inspector General U.S. Department of Health and Human Services Xxxxx Building, Room 5527 000 Xxxxxxxxxxxx Xxxxxx, XX Xxxxxxxxxx, XX 00000 Telephone: (000) 000-0000 Facsimile: (000) 000-0000 LFAC: Xxxxxxx X. Xxxxx, DPM 0000 Xxxxxxxxxxx Xx. X-000 Xxxxxxxxx, XX 00000 Telephone: (000) 000-0000 Email: xx.xxxxx@xxxxx.xxx Unless otherwise specified, all notifications and reports required by this IA may be made by electronic mail, overnight mail, hand delivery, or other means, provided that there is proof that such notification was received. Upon request by OIG, LFAC may be required to provide OIG with an additional copy of each notification or report required by this IA in OIG’s requested format (electronic or paper).

Time is Money Join Law Insider Premium to draft better contracts faster.