Common use of UNIVERSITY STANDARDS Clause in Contracts

UNIVERSITY STANDARDS. In addition to the documents referenced elsewhere in this contract and those noted below, Contractor shall comply with the requirements set forth in the most current version of the Georgia Tech Architectural and Engineering Design Standards for Building Technology (also known as the Georgia Tech “Yellow Book”). This document includes campus technical design standards for both renovation and new construction: xxxx://xxx.xxxxxxxxxx.xxxxxx.xxx/dc/standards/ Construction fencing shall be installed around work site where applicable, extent of which shall be coordinated with GT Construction Manager. Fencing shall be covered with ‘black’ colored fabric to prevent visibility into construction site. Ground support for fencing (feet, sandbags etc,) shall be on the construction side of the fencing leaving the pedestrian side clear of all walking hazards. All contractor signage shall be approved by GT Construction Manager prior to installation. Contractor shall provide construction staging plan to GT Construction Manager at pre-construction meeting. Contractor shall coordinate the following with the GT Fire Marshal’s office: Hot Works Permit, Pre-Construction Meeting, 50, 80 and 100% inspections and fire alarm and sprinkler system work. Access requests on Facilities Management website / Environmental, Health and Safety / Fire Life Safety. Contractor to have full time competent supervision onsite during construction or per the agreed upon general conditions established at the time of award. Dumpsters will be placed at a minimum of 25 feet away from the building. The contractor will be responsible to coordinate the dumpster location with GA Tech Fire Marshal at the FM pre-construction meeting. Temporary partitions which impact life safety shall be approved by GA Tech Fire Marshal prior to installation. For interior projects: Dust partitions and / or zip walls shall be installed if the construction area is exposed to the building occupants. Existing building finishes along the access points to the construction area shall be protected. Any damages shall be repaired at the expense of the contractor. It will be the contractor’s responsibility to document existing damages. Construction walk-off mats are required at all entrance and exit points of the construction area. Common areas utilized by the contractor shall be cleaned daily. The building freight and / or passenger elevator used by the contractor shall be protected for the duration of construction. LABOR AND SUPERVISION: The Contractor shall enforce strict discipline and good order among the Contractor(s)’s employees. The Contractor’s supervision must be the controlling authority on the job and this function cannot be subcontracted. The Contractor shall exercise the necessary supervision and control on each job and to prevent Contractor’s employees from violating any rules and regulations. The Contractor shall promptly remove from the work and the premises any supervisor or employee of the Contractor or subcontractor(s) whose work or conduct is not satisfactory to GIT’s Contract administrator or the Owner’s Representative.

Appears in 4 contracts

Samples: Construction Contract, Construction Contract, Construction Contract

AutoNDA by SimpleDocs
Time is Money Join Law Insider Premium to draft better contracts faster.