Performance Expectations The Charter School’s performance in relation to the indicators, measures, metrics and targets set forth in the CPF shall provide the basis upon which the SCSC will decide whether to renew the Charter School’s Charter Contract at the end of the charter term. This section shall not preclude the SCSC from considering other relevant factors in making renewal decisions.
Performance Targets Threshold, target and maximum performance levels for each performance measure of the performance period are contained in Appendix B.
PERFORMANCE OBJECTIVES 4.1 The Performance Plan (Annexure A) sets out-
Project Goals The schedule, budget, physical, technical and other objectives for the Project shall be defined.
Quality-based Selection Services for assignments which the Bank agrees meet the requirements set forth in paragraph 3.2 of the Consultant Guidelines may be procured under contracts awarded on the basis of Quality-based Selection in accordance with the provisions of paragraphs 3.1 through 3.4 of the Consultant Guidelines.
Goals Goals define availability, performance and other objectives of Service provisioning and delivery. Goals do not include remedies and failure to meet any Service Goal does not entitle Customer to a Service credit.
Power Factor Design Criteria Developer shall design the Large Generating Facility to maintain an effective power delivery at demonstrated maximum net capability at the Point of Interconnection at a power factor within the range established by the Connecting Transmission Owner on a comparable basis, until NYISO has established different requirements that apply to all generators in the New York Control Area on a comparable basis. The Developer shall design and maintain the plant auxiliary systems to operate safely throughout the entire real and reactive power design range. The Connecting Transmission Owner shall not unreasonably restrict or condition the reactive power production or absorption of the Large Generating Facility in accordance with Good Utility Practice.
Performance Indicators The HSP’s delivery of the Services will be measured by the following Indicators, Targets and where applicable Performance Standards. In the following table: n/a meanç ‘not-appIicabIe’, that there iç no defined Performance Standard for the indicator for the applicable year. tbd means a Target, and a Performance Standard, if applicable, will be determined during the applicable year. INDICATOR CATEGORY INDICATOR P = Performance Indicator E = Explanatory Indicator M = Monitoring Indicator 2019/20 PERFORMANCE TARGET STANDARD Organizational Health and Financial Indicators Debt Service Coverage Ratio (P) 1 c1 Total Margin (P) 0 cO Coordination and Access Indicators Percent Resident Days – Long Stay (E) n/a n/a Wait Time from LHIN Determination of Eligibility to LTC Home Response (M) n/a n/a Long-Term Care Home Refusal Rate (E) n/a n/a SCHEDULE D — PERFORMANCE 2/3 INDICATOR CATEGORY Quality and Resident Safety Indicators INDICATOR P = Performance Indicator E = Explanatory Indicator M = Monitoring Indicator Percentage of Residents Who Fell in the Last 30 days (M) 2019/20 PERFORMANCE TARGET STANDARD n/a n/a Percentage of Residents Whose Pressure Ulcer Worsened (M) n/a n/a Percentage of Residents on Antipsychotics Without a Diagnosis of Psychosis (M) n/a n/a Percentage of Residents in Daily Physical Restraints (M) n/a n/a SCHEDULE D — PERFORMANCE 2.0 LHIN-Specific Performance Obligations 3/3