Underground Cabling Depth. A. Underground electrical cables located outside the perimeter of the (fence) of the solar panels shall be buried with:
AutoNDA by SimpleDocs
Underground Cabling Depth. A. Underground electrical cables shall be buried with:
Underground Cabling Depth. A. Underground electrical cables will be buried with: a minimum of 5 feet of top cover where it crosses Cropland. a minimum of 5 feet of top cover where it crosses pasture land or other Agricultural Land comprised of soils that are classified by the USDA as being prime soils. a minimum of 3 feet of top cover where it crosses pasture land and other Agricultural Land not comprised of prime soils.
Underground Cabling Depth. A. Underground electrical cables located outside the perimeter of the (fence) of the solar panels shall be buried with: a minimum of 5 feet of top cover where they cross Cropland. a minimum of 5 feet of top cover where they cross pastureland or other non-Cropland classified as Prime Farmland. a minimum of 3 feet of top cover where they cross pastureland and other Agricultural Land not classified as Prime Farmland.

Related to Underground Cabling Depth

  • Underground Facilities All underground pipelines, conduits, ducts, cables, wires, manholes, vaults, tanks, tunnels, or other such facilities or attachments, and any encasements containing such facilities, including without limitation those that convey electricity, gases, steam, liquid petroleum products, telephone or other communications, cable television, water, wastewater, storm water, other liquids or chemicals, or traffic or other control systems.

  • Underground Utilities Any required ground digging or subsurface work shall be done in accordance with Chapter 556, Florida Statutes. It shall be the responsibility of CONTRACTOR to have all underground utilities located before any work begins (Sunshine State One Call 0-000-000-0000). The repairs of any damaged underground utilities as a result of the work being performed by CONTRACTOR shall be the responsibility of CONTRACTOR. The proper utility company shall be contacted immediately to expedite the repairs, if damage has occurred. CONTRACTOR will notify the COUNTY and provide a written explanation of the incident within two (2) days of the damage to any underground utilities.

  • UNDERGROUND LOCATIONS Prior to the Company commencing any work the Customer must advise the Company of the precise location of all underground services on the site and clearly xxxx the location. The underground mains and services the Customer must identify include, but are not limited to, telephone cables, fibre optic cables, electrical services, gas services, sewer services, pumping services, sewer connections, sewer sludge mains, water mains, irrigations pipes, oil pumping mains and any other services that may be on site. Whilst the Company will take all care to avoid damage to any underground services the Customer agrees to indemnify the Company in respect of all any liability claims, loss, damage, cost and fines as a result of damage to services not precisely located and notified pursuant to this clause.

  • Built-up Area The built-up area for the Designated Apartment or any other Unit shall mean the Carpet Area of such Unit and Balcony area and 50% (fifty percent) of the area covered by those external walls which are common between such Unit/Balcony and any other Unit/Balcony and the area covered by all other external walls of the such Unit/Balcony.

  • Surface  Grade and shape the road surface, turnouts, and shoulders to the original shape on the TYPICAL SECTION SHEET. Inslope or outslope as directed to provide a smooth, rut-free traveled surface and maintain surface water runoff in an even, unconcentrated manner.  Blading shall not undercut the backslope or cut into geotextile fabric on the road.  If required by the Contract Administrator, water shall be applied as necessary to control dust and retain fine surface rock.  Surface material shall not be bladed off the roadway. Replace surface material when lost or worn away, or as directed by the Contract Administrator.  Remove shoulder berms, created by grading, to facilitate drainage, except as marked or directed by the Contract Administrator.  For roads with geotextile fabric: spread surface aggregate to fill in soft spots and wheel ruts (barrel spread) to prevent damage to the geotextile fabric.

  • Pipelines Developer shall have no interest in the pipeline gathering system, which gathering system shall remain the sole property of Operator or its Affiliates and shall be maintained at their sole cost and expense.

  • Groundwater The groundwater shall not be degraded as a result of the waste maintained at the facility.

  • Road Surfaces (1) Grade, shape, crown, and/or outslope surface and shoulders.

  • Excavation If any excavation shall be made upon land adjacent to or under the Building, or shall be authorized to be made, Tenant shall afford to the person causing or authorized to cause such excavation, license to enter the Premises for the purpose of performing such work as said person shall deem necessary or desirable to preserve and protect the Building from injury or damage and to support the same by proper foundations, without any claim for damages or liability against Landlord and without reducing or otherwise affecting Tenant’s obligations under this Lease.

  • Exterior Drainage Does water stand on the property for more than 24 hours after a heavy rain? Yes No Unknown Comments Are gutters and downspouts in good repair? Yes No Unknown Comments: