TSPS Category 1B Boundary Survey (701 Sample Clauses

TSPS Category 1B Boundary Survey (701. Xxxxxx will perform boundary survey to show right-of-way lines, easements, and adjoiner ownership within the area shown (outlined in red) in Exhibit “A”. The survey will be performed in accordance with TSPS Standards for a Category 1B Condition II Boundary Survey and will be based on Texas Xxxxx Xxxxx, Xxxxx Xxxxxxx Xxxx, XXX 00 (2011) coordinates. A Texas Registered Professional Land Surveyor will direct all aspects of the survey.
AutoNDA by SimpleDocs

Related to TSPS Category 1B Boundary Survey (701

  • Dienste Und Materialien Von Drittanbietern (a) Die Apple-Software gewährt möglicherweise Zugang zu(m) iTunes Store, App Store, Apple Books, Game Center, iCloud, Karten von Apple und zu anderen Diensten und Websites von Apple und Drittanbietern (gemeinsam und einzeln als „Dienste“ bezeichnet). Solche Dienste sind möglicherweise nicht in xxxxx Sprachen oder in xxxxx Ländern verfügbar. Die Nutzung dieser Dienste erfordert Internetzugriff und die Nutzung bestimmter Dienste erfordert möglicherweise eine Apple-ID, setzt möglicherweise dein Einverständnis mit zusätzlichen Servicebedingungen voraus und unterliegt unter Umständen zusätzlichen Gebühren. Indem du diese Software zusammen mit einer Apple-ID oder einem anderen Apple-Dienst verwendest, erklärst du dein Einverständnis mit den anwendbaren Servicebedingungen für diesen Dienst, z. B. den neuesten Apple Media Services-Bedingungen für das Land, in dem du auf diese Services zugreifst, die du über die Webseite xxxxx://xxx.xxxxx.xxx/legal/ internet-services/itunes/ anzeigen und nachlesen kannst

  • Power Factor Design Criteria Developer shall design the Large Generating Facility to maintain an effective power delivery at demonstrated maximum net capability at the Point of Interconnection at a power factor within the range established by the Connecting Transmission Owner on a comparable basis, until NYISO has established different requirements that apply to all generators in the New York Control Area on a comparable basis. The Developer shall design and maintain the plant auxiliary systems to operate safely throughout the entire real and reactive power design range. The Connecting Transmission Owner shall not unreasonably restrict or condition the reactive power production or absorption of the Large Generating Facility in accordance with Good Utility Practice.

  • Loop Provisioning Involving IDLC 2.16.1 Where TWTC has requested an Unbundled Loop and AT&T uses IDLC systems to provide the local service to the customer and AT&T has a suitable alternate facility available, AT&T will make such alternative facilities available to TWTC. If a suitable alternative facility is not available, then to the extent it is technically feasible, AT&T will implement one of the following alternative arrangements for TWTC (e.g., hairpinning):

  • Loop Provisioning Involving Integrated Digital Loop Carriers 2.6.1 Where InterGlobe has requested an Unbundled Loop and BellSouth uses IDLC systems to provide the local service to the End User and BellSouth has a suitable alternate facility available, BellSouth will make such alternative facilities available to InterGlobe. If a suitable alternative facility is not available, then to the extent it is technically feasible, BellSouth will implement one of the following alternative arrangements for InterGlobe (e.g. hairpinning):

  • ROAD DIMENSIONS Purchaser shall perform road work in accordance with the dimensions shown on the TYPICAL SECTION SHEET and the specifications within this road plan.

  • Power Factor Design Criteria (Reactive Power A wind generating plant shall maintain a power factor within the range of 0.95 leading to 0.95 lagging, measured at the Point of Interconnection as defined in this LGIA, if the ISO’s System Reliability Impact Study shows that such a requirement is necessary to ensure safety or reliability. The power factor range standards can be met using, for example without limitation, power electronics designed to supply this level of reactive capability (taking into account any limitations due to voltage level, real power output, etc.) or fixed and switched capacitors if agreed to by the Connecting Transmission Owner for the Transmission District to which the wind generating plant will be interconnected, or a combination of the two. The Developer shall not disable power factor equipment while the wind plant is in operation. Wind plants shall also be able to provide sufficient dynamic voltage support in lieu of the power system stabilizer and automatic voltage regulation at the generator excitation system if the System Reliability Impact Study shows this to be required for system safety or reliability.

  • Teaching Staff Assigned to More Than One Building Each Educator who is assigned to more than one building will be evaluated by the appropriate administrator where the individual is assigned most of the time. The principal of each building in which the Educator serves must review and sign the evaluation, and may add written comments. In cases where there is no predominate assignment, the superintendent will determine who the primary evaluator will be.

  • Provisioning of High Frequency Spectrum and Splitter Space 3.2.1 BellSouth will provide <<customer_name>> with access to the High Frequency Spectrum as follows:

  • STRS PICK-UP A. The Board shall pick-up contributions to the State Teachers’ Retirement System paid on behalf of the employees in the bargaining unit utilizing the salary reduction method under the following terms and conditions:

  • MSAA Indicator Technical Specification Document This Agreement shall be interpreted with reference to the MSAA Indicator Technical Specifications document.

Time is Money Join Law Insider Premium to draft better contracts faster.