Train unloading Sample Clauses

Train unloading. If a train carrying the User's Coal arrives at the Terminal as scheduled (or within a reasonable time before or after it is scheduled, where it can reasonably be unloaded at that time), DBCT Management must ensure that the train is unloaded at a rate (consistent with the type and condition of the Coal) consistent with achieving Handling of the Annual Contract Tonnage of Coal for the User.
AutoNDA by SimpleDocs
Train unloading. Train unloading will be performed under the direction of the Shift Fuel/Lime Operator. He/she will receive train pay in the amount of $1.50 per hour for overseeing this operation. Train unloading supplemental labor shall be determined by the following sequence of options:
Train unloading. If a train carrying an Access Holder’s coal arrives at the Terminal within its designated cargo build window, DBCT Management must ensure that the train is unloaded at a rate (consistent with the type and condition of the coal) consistent with achieving Handling of the Annual Contract Tonnage of coal for an Access Holder. Reclaiming and vessel loading DBCT Management must: make the Terminal available for berthing by vessels (which are satisfactory in all respects to receive Coal) nominated by the User, such that not less than the Annual Contract Tonnage can be Handled by DBCT Management in each Financial Year (as long as the vessel and/or cargo mix required by the User or its customer does not unreasonably impact on the efficiency of the Terminal). It is agreed that historical vessel or cargo mixes prior to 30 June 2005 will be taken generally not to have unreasonably impacted on efficiency; and load the User's Coal into a vessel which is nominated by the User and is available for loading so as to achieve the objective in section 3(x).

Related to Train unloading

  • Loading RPMG shall schedule the loading and shipping of all outbound corn oil purchased hereunder, but all labor and equipment necessary to load trucks and rail cars and other associated costs shall be supplied and borne by Producer without charge to RPMG. Producer shall handle the corn oil in a good and workmanlike manner in accordance with RPMG’s written requirements and normal industry practice. Producer shall maintain the truck and rail loading facilities in safe operating condition in accordance with normal industry standards and shall visually inspect all trucks and rail cars to assure (i) cleanliness so as to avoid contamination, and (ii) that such trucks and railcars are in a condition suitable for transporting the corn oil. RPMG and RPMG’s agents shall have adequate access to the Ethanol Facility to load Producer’s corn oil on an industry standard basis that allows RPMG to economically market Producer’s corn oil. RPMG’s employees shall follow all reasonable safety rules and procedures promulgated by Producer and provided to RPMG reasonably in advance and in writing. Producer shall supply product description tags, certificates of analysis, bills of lading and/or material safety data sheets that are applicable to all shipments. In the event that Producer fails to provide the labor, equipment and facilities necessary to meet RPMG’s loading schedule, Producer shall be responsible for all costs and expenses, including without limitation actual demurrage and wait time, incurred by RPMG resulting from or arising in connection with Producer’s failure to do so.

  • Loading and Unloading The Hiree is responsible for the loading and unloading of the store hired.

  • Pipelines Developer shall have no interest in the pipeline gathering system, which gathering system shall remain the sole property of Operator or its Affiliates and shall be maintained at their sole cost and expense.

  • Casual Loading (e) Superannuation contributions are to be made for periods when Employees are on:

  • Staging In addition to the staging categories listed in paragraph 1 of Annex 2-A, this Schedule contains staging categories 20-A, 20-B, PR-1 and PR-130:

  • Delivery Point (a) All Energy shall be Delivered hereunder by Seller to Buyer at the Delivery Point. Seller shall be responsible for the costs of delivering its Energy to the Delivery Point consistent with all standards and requirements set forth by the FERC, ISO-NE, the Interconnecting Utility and any other applicable Governmental Entity and any applicable tariff.

  • Terminals Hartford Terminal. Hartford Terminal is located at or near Hartford, Illinois. The facility consists of a two-bay truck rack with 17,000 barrels of active terminaling capacity, 13 above-ground storage tanks with approximately 1.1 million barrels of total storage capacity. The Hartford barge dock consists of a single-berth barge loading facility, approximately 0.8 miles of 8-inch pipeline and approximately 0.8 miles of 14-inch pipeline from the Hartford terminal to the Hartford barge dock for delivery.

  • Storage The ordering agency is responsible for storage if the contractor delivers within the time required and the agency cannot accept delivery.

  • Delivery Points ‌ Project water made available to the Agency pursuant to Article 6 shall be delivered to the Agency by the State at the delivery structures established in accordance with Article 10.

  • Metering The Interconnection Customer shall be responsible for the Connecting Transmission Owner’s reasonable and necessary cost for the purchase, installation, operation, maintenance, testing, repair, and replacement of metering and data acquisition equipment specified in Attachments 2 and 3 of this Agreement. The Interconnection Customer’s metering (and data acquisition, as required) equipment shall conform to applicable industry rules and Operating Requirements.

Time is Money Join Law Insider Premium to draft better contracts faster.