Traffic Control Plans Sample Clauses

Traffic Control Plans. The Engineer shall provide all planning, labor, and equipment to develop and to execute each Traffic Control Plan (TCP) needed by the Engineer to perform services under each Work Authorization. The Engineer shall comply with the requirements of the most recent edition of the TMUTCD. The Engineer shall submit a copy of each TCP to the State for approval prior commencing any work on any State roadway. The Engineer shall provide all signs, flags, and safety equipment needed to execute the approved TCP. The Engineer shall notify the State in writing twenty-four (24) hours in advance of executing each TCP requiring a lane closure, and shall have received written concurrence from the State prior to beginning the lane closure. The Engineer’s field crew shall possess a copy of the approved TCP on the job site at all times and shall make the TCP available to the State for inspection upon request. The Engineer shall assign charges for any required traffic control to the applicable function code.
AutoNDA by SimpleDocs
Traffic Control Plans. ‌ 26 Developer shall prepare Traffic Control Plans that provide for all construction stages and 27 phasing in accordance with the requirements of the Contract Documents. The Traffic Control 28 Plans must include any proposed changeable message board legends and proposed messages 29 on existing DMS. Developer shall coordinate with all appropriate Governmental Entities and 30 affected parties in the development of the Traffic Control Plans. Developer shall design Traffic 31 Control Plans without the use of DPS. Prior to work involving traffic, Developer shall submit
Traffic Control Plans. This may include providing professional and technical support staff under the direct supervision of LADWP's staff, or the Contractor's staff, to prepare design plans and drawings, which are then subject to the review and approval of LADWP staff, the Los Angeles Department of Transportation, and the California Department of Transportation.
Traffic Control Plans. The CONSULTANT shall prepare Pedestrian Accommodation Detour Plans as part of the WSDOT approval requirements for the project. These plans will be prepared in conjunction with the proposed construction phasing and temporary traffic control plans.
Traffic Control Plans. GCE shall evaluate the requirements for traffic control and develop Traffic Control Plans (TCP) for the project in general accordance with the latest edition of the TMUTCD. GCE shall interface and coordinate phases of work, including the TCP, with the Client and adjacent section engineers, as required.
Traffic Control Plans. The contractor is assumed to design and coordinate with City the approval of these plans.
Traffic Control Plans. ‌ On those occasions when the requested work requires a street, sidewalk, alley, or bikeway to be blocked, wholly or partially, the Contractor is to comply with the traffic control plans as prescribed in Chapter 5 of the Caltrans Traffic Manual Traffic Control for Construction and Maintenance Work Zones. Information and the required written notices shall be obtained from the City of San Diego Traffic Engineering Division, Plan Check Counter, 1222 Xxxxx Xxxxxx, Xxx Xxxxx, XX 00000, xxone (000) 000-0000. The required written notice must be filed prior to commencing work in the impacted area.
AutoNDA by SimpleDocs
Traffic Control Plans. 7) Water and/or sanitary sewer adjustment sheets (as needed).
Traffic Control Plans. The Engineer shall provide all planning, labor, and equipment to develop and execute each Traffic Control Plan (TCP) needed by the Engineer to perform services under the contract. The Engineer shall comply with the requirements of the most recent edition of the TMUTCD. The Engineer shall submit a copy of each TCP to the State for approval prior commencing any work on any State roadway. The Engineer shall provide all signs, flags, and safety equipment needed to execute the DocuSign Envelope ID: 3834C76D-F898-4EF5-A280-35D1D4DA0CBD approved TCP. The Engineer shall notify the State in writing twenty‐four (24) hours in advance of executing each TCP requiring a lane closure, and shall have received written concurrence from the State prior to beginning the lane closure. The Engineer’s field crew shall possess a copy of the approved TCP on the job site at all times and shall make the TCP available to the State for inspection upon request. The Engineer shall assign charges for any required traffic control to the applicable function code.
Traffic Control Plans. At the City’s written request, the Consultant shall: