TRAFFIC CONTROL PLAN, DETOURS AND SEQUENCE OF CONSTRUCTION Sample Clauses

TRAFFIC CONTROL PLAN, DETOURS AND SEQUENCE OF CONSTRUCTION. The ENGINEER shall prepare Traffic Control Plans (TCP) for the project. A detailed TCP shall be developed in accordance with the latest edition of the Texas Manual on Uniform Traffic Control Devices. The ENGINEER is to implement the current Barricade and Construction (BC) Standards. The ENGINEER shall use Austin District Standards.
AutoNDA by SimpleDocs
TRAFFIC CONTROL PLAN, DETOURS AND SEQUENCE OF CONSTRUCTION. The Engineer shall prepare Traffic Control Plans (TCP) for the project. The Engineer shall complete Form 2229-Significant Project Procedures along with Page 4 of Form 1002, specifically titled Accelerated Construction Procedures. A detailed TCP must be developed in accordance with the latest edition of the TMUTCD. The Engineer shall implement the current Barricade and Construction (BC) standards and TCP standards as applicable. The Engineer shall:
TRAFFIC CONTROL PLAN, DETOURS AND SEQUENCE OF CONSTRUCTION. The Engineer shall update the Traffic Control Plans (TCP) including TCP typical sections and cross sections for the different phases, for the project. The Engineer shall review and update Form 2229- Significant Project Procedures along with Page 4 of Form 1002, specifically titled Accelerated Construction Procedures. A detailed TCP must be developed in accordance with the latest edition of the TMUTCD. The Engineer shall implement the current Barricade and Construction (BC) standards and TCP standards as applicable. The Engineer shall interface and coordinate phases of work, including the TCP, with adjacent Engineers. The Engineer shall:
TRAFFIC CONTROL PLAN, DETOURS AND SEQUENCE OF CONSTRUCTION. Prepare the Traffic Control plan and incorporate this work in to the PS&E plan set. The Engineer shall prepare Traffic Control Plans (TCP) including TCP typical sections and cross sections for the different phases, for the project. A detailed TCP must be developed in accordance with the latest edition of the TMUTCD. The Engineer shall implement the current Barricade and Construction (BC) standards and TCP standards as applicable. The Engineer shall interface and coordinate phases of work, including the TCP, with adjacent Engineers. The Engineer shall: DocuSign Envelope ID: 798F7E2C-0AE6-40EE-BFB4-3AB848988972

Related to TRAFFIC CONTROL PLAN, DETOURS AND SEQUENCE OF CONSTRUCTION

  • Definitions Rules of Construction In addition to terms otherwise defined herein, the following terms are used herein as defined below:

  • MONITORING OF CONSTRUCTION 13.1 Monthly progress reports During the Construction Period, the Concessionaire shall, no later than 7 (seven) days after the close of each month, furnish to the Authority and the Independent Engineer a monthly report on progress of the Construction Works and shall promptly give such other relevant information as may be required by the Independent Engineer.

  • Definitions and Rules of Construction 1.1 Unless otherwise defined herein, the following capitalized terms shall have the following meanings:

  • Definitions and Construction 1 1.1 Definitions.....................................................................................1 1.2

  • ICIF Construction The ICIF shall be designed and constructed in accordance with Good Utility Practice. Within one hundred twenty (120) Calendar Days after the Commercial Operation Date, unless the Parties agree on another mutually acceptable deadline, Interconnection Customer shall deliver to Transmission Provider and Transmission Owner “as-built” drawings, information and documents for the ICIF, such as: a one-line diagram, a site plan showing the Generating Facility and the ICIF, plan and elevation drawings showing the layout of the ICIF, a relay functional diagram, relaying AC and DC schematic wiring diagrams and relay settings for all facilities associated with the Interconnection Customer’s step-up transformers, the facilities connecting the Generating Facility to the step-up transformers and the ICIF, and the impedances (determined by factory tests) for the associated step-up transformers and the Generating Facility. Interconnection Customer shall provide Transmission Provider and Transmission Owner with Interconnection Customer’s specifications for the excitation system, automatic voltage regulator, Generating Facility control and protection settings, transformer tap settings, and communications, if applicable.

  • Construction Phase - Administration of the Construction Contract 1.6.1 The Construction Phase shall commence with the acceptance of the Construction Manager’s Guaranteed Maximum Price (or acceptance of a partial Guaranteed Maximum Price for a stage or phase) and issuance of a Notice to Proceed with Construction Services and terminate sixty (60) days after Final Payment to the Contractor is made, or when all of Architect/Engineer’s services have been satisfactorily performed, whichever occurs later.

  • No Rule of Strict Construction Regardless of which party may have drafted this Agreement, no rule of strict construction shall be applied against either party. If any provision of this Agreement is determined by a court to be unenforceable, the parties shall deem the provision to be modified to the extent necessary to allow it to be enforced to the extent permitted by law, or if it cannot be modified, the provision will be severed and deleted from this Agreement, and the remainder of this Agreement will continue in effect.

  • DAF Construction The DAF shall be designed and constructed in accordance with Good Utility Practice. Within one hundred twenty (120) Calendar Days after the Commercial Operation Date, unless the Developer and Connecting Transmission Owner agree on another mutually acceptable deadline, the Developer shall deliver to the Connecting Transmission Owner and NYISO “as- built” drawings, information and documents for the DAF, such as: a one-line diagram, a site plan showing the Large Generating Facility and the DAF, plan and elevation drawings showing the layout of the DAF, a relay functional diagram, relaying AC and DC schematic wiring diagrams and relay settings for all facilities associated with the Developer’s step-up transformers, the facilities connecting the Large Generating Facility to the step-up transformers and the DAF, and the impedances (determined by factory tests) for the associated step-up transformers and the Large Generating Facility. The Developer shall provide to, and coordinate with, Connecting Transmission Owner and NYISO with respect to proposed specifications for the excitation system, automatic voltage regulator, Large Generating Facility control and protection settings, transformer tap settings, and communications, if applicable.

  • Supervision of Construction The Recipient agrees to maintain competent and adequate engineering supervision at the construction site of any Project to ensure that the completed work conforms to the approved plans and specifications.

  • SUPERVISION AND CONSTRUCTION PROCEDURES 4.3.1 The Contractor shall supervise and direct the Work, using his / her best skill and attention. The Contractor shall be solely responsible for all construction means, methods, techniques, sequences and procedures and for coordinating all portions of the Work under the Contract. All aspects of the Project shall be subject to the inspection and approval of the State. Contractor guarantees to repair, replace, re-execute or otherwise correct any defect in workmanship, materials, or the like that fails to conform to the requirements of this Contract or that appears during the progress of the Work or within one year of final acceptance by the State.