Touchup Painting Sample Clauses

Touchup Painting. 1. Immediately after erection, clean exposed areas where primer is damaged or missing, and paint with the same material as used for shop painting to comply with SSPC-PA 1 for touching up shop-painted surfaces.
AutoNDA by SimpleDocs
Touchup Painting. A. Immediately following erection, remove unused deck edge trimmings, screws, fasteners, welding washers, butt ends of welding rods, and debris from completed installation.
Touchup Painting. Immediately after erection, clean field welds, bolted connections, and abraded areas of shop paint, and paint exposed areas with the same material as used for shop painting to comply with SSPC-PA 1 for touching up shop-painted surfaces.

Related to Touchup Painting

  • Painting All exterior surfaces and materials requiring paint shall be prime coated plus 2 coats of Xxxxxxx Xxxxxxxx Pro-Mar alkyd flat exterior finish, or Xxxxxxx-Xxxxxxxx SWP exterior gloss paint. All porous exterior surfaces (e.g. unpainted wood) shall be sealed with 2 coats of Xxxxxxxx’x Water Seal following the manufacturers application instructions. Interior surfaces requiring paint shall be prime coated plus 2 coats of Xxxxxxx Xxxxxxxx Pro-Mar Latex Eg-Shel enamel. Concrete block walls shall receive 1 coat of Xxxxxxx Xxxxxxxx Pro-Mar Block Filler and 2 coats of Xxxxxxx Xxxxxxxx Pro-Mar latex Eg-Shel enamel. Interior finishes and color selections shall be approved by the State. A schedule of colors and finishes shall be prepared by the Owner/Lessor and approved by the State.

  • Road Surfaces (1) Grade, shape, crown, and/or outslope surface and shoulders.

  • Graffiti Franchisee shall require in all contracts (entered into after the Effective Date) with each of its customers of their Solid Waste Collection Services to maintain the Container, as defined in Chapter 9.04 of the City Code or as amended from time to time, free from graffiti. Franchisee’s Containers may display the name, address and/or phone number of the Franchisee, identification numbering or lettering assigned by the Franchisee, and any warnings, notices or instructions posted by Franchisee. If Franchisee’s customers do not remove graffiti from the Franchisee’s Containers, then Franchisee shall remove the graffiti and may bill its customer for the cost or replace the Container at the customer’s expense. If, after five days notice from the Director, the Franchisee or its customer has not removed the graffiti or replaced the Containers, then the City may cover or remove the graffiti or the Container.

  • PAVING Provide a standard bubble map, as part of the plans, showing locations of numbered points, and a table with point number, northing and easting coordinates, description, and BL station for each point, for the following: ▪ all platted control irons (set or not), including plat boundary irons, for the entire sub-division, not just the current phase ▪ benchmarks, including TBM set with preliminary survey In addition to the required coordinate information, the following shall be included in all plans, at a minimum, as needed for construction staking on all City projects. ▪ Include copy of plat(s) on all plans, as relevant and approved by the Design Engineer ▪ Benchmarks – minimum of two City standards, four total desirable; as close to project as possible, even if TBM set with preliminary survey. ▪ Benchmark elevations must be in the same datum as the design (i.e. NAV 88 design needs NAV 88 benchmarks, not NAV 29) ▪ All control irons/identified property irons shall be shown on plans, with BL stationing and offset ▪ Show deflection angles in BL, and/or bearing/azimuth of BL sections ▪ Arterial project side streets – provide BL station at CL of intersection of the two streets, on the BL; BL station and offset to CL of side street at removal limits; include deflection angle from BL to CL of side street ▪ Existing FL/pavement grades shown at all match points ▪ Top of curb grades and stationing at all ends-of-return and horizontal/vertical P.I.’s, not just even stationing ▪ CL top of pavement grades for arterial ▪ CL elevation for streets on mass grading work @ 100’ Sta in tangent sections and 50’ on curves.

  • Interior (a) Ceilings, sidewalls and bulkhead panels shall be clean and free of cracks and stains;

  • Pavement The combined surface course, base course, and subbase course, if any, considered as a single unit.

  • Moonlighting 24.01 The Company and the Union agree in principle to eliminate the practice commonly referred to as moonlighting.

  • Windows a. Front and rear windshield per California Vehicle Code § 26710.

  • Carpet Cleaning Shampooing carpets with the deep dirt extraction (steam cleaning) method per manufactures recommendations.

  • ROAD DIMENSIONS Purchaser shall perform road work in accordance with the dimensions shown on the TYPICAL SECTION SHEET and the specifications within this road plan.

Time is Money Join Law Insider Premium to draft better contracts faster.