Timetable for Completion Sample Clauses

Timetable for Completion. The Parties shall use, and shall direct the Expert Committee to use, diligent efforts to resolve any Expert Committee Dispute within [***] after the selection of the third Expert, or if resolution within [***] days is not reasonably achievable, as determined by the Expert Committee, then as soon thereafter as is reasonably practicable.
AutoNDA by SimpleDocs
Timetable for Completion.  The final work product shall include 10 spiral bound copies of the manuscript delivered to the Trust and two (2) electronic digital copies in CD-ROM diskette format. Final Manuscript shall be formatted consisted with the Author and Editor Guidelines: Manuscript Preparation and Book Production as specified by Rutgers University Press, and can be found: xxxx://xxxxxxxxxxxx.xxxxxxx.xxx/acatalog/Author_Editor_Guidelines.html  Research File – one hard copy and (2) electronic digital copies in CD-ROM diskette format  Image file containing electronic images suitable for publication of 300 dpi or greater, with accurate accreditation as may be required; and list of potential images suitable for publication where owner permission must be obtained.
Timetable for Completion. Avecia shall use all Commercially Reasonable Efforts to successfully complete the initial process validation of the M1 Facility as soon as possible but no later than (*). If such initial process validation of the M1 Facility is not successfully completed by (*). Such successful completion shall include, without limitation, approval by the Genta quality assurance audit team of Avecia's technical reports submitted in connection with such process validation and three successful consecutive validation Batches of API. Avecia shall conduct validation activities as needed anytime thereafter during the term of this Agreement, in consultation with Genta. Avecia shall routinely prepare, assemble and retain any reports, documents and validation summary reports pertaining to the Manufacturing Facilities and manufacturing and processing activities hereunder in accordance with Section 10.2 and that are required for the validation and qualification process. Avecia shall provide copies of such required documents and reports to Genta for approval thereof as part of the validation and qualification process.
Timetable for Completion. The Parties will use, and will direct the Expert to use, commercially reasonable efforts to resolve a dispute within forty-five (45) days after the selection of the Expert or, if resolution within forty-five (45) days is not reasonably achievable, as determined by the Expert, then as soon thereafter as is reasonably practicable.
Timetable for Completion. The Parties will use, and will direct the Expert to use, commercially reasonable efforts to resolve a dispute no later than forty-five (45) days after the selection of the Expert, or if resolution no later than forty-five (45) days is not reasonably achievable, as determined by the Expert, then as soon thereafter as is reasonably practicable. EXHIBIT D Press Release CRISPR Therapeutics and ViaCyte Announce Strategic Collaboration to Develop Gene-Edited Stem Cell-Derived Therapy for Diabetes - Aims to develop an immune-evasive stem cell therapy as a potentially curative treatment for diabetes -- Parties will collaborate through commercialization and share costs and profits worldwide - ZUG, Switzerland and CAMBRIDGE, Mass., and SAN DIEGO, September 17, 2018 -- CRISPR Therapeutics (NASDAQ: CRSP), a biopharmaceutical company focused on developing transformative gene-based medicines for serious diseases, and ViaCyte, Inc., a privately held regenerative medicine company, today announced a collaboration focused on the discovery, development, and commercialization of gene-edited allogeneic stem cell therapies for the treatment of diabetes. Decades of clinical data with islet transplants indicate that beta-cell replacement approaches may offer curative benefit to patients with insulin-requiring diabetes. ViaCyte has pioneered the approach of generating pancreatic-lineage cells from stem cells and delivering them safely and efficiently to patients. PEC-Direct, ViaCyte’s lead product candidate currently being evaluated in the clinic, uses a non-immunoprotective delivery device that permits direct vascularization of the cell therapy. This approach has the potential to deliver durable benefit; however, because the patient’s immune system will identify these cells as foreign, PEC-Direct will require long-term immunosuppression to avoid rejection. As a result, PEC-Direct is being developed as a therapy for the subset of patients with type 1 diabetes at high risk for acute complications. CRISPR gene editing offers the potential to protect the transplanted cells from the patient’s immune system by ex-vivo editing immune-modulatory genes within the stem cell line used to produce the pancreatic-lineage cells. The speed, specificity, and multiplexing efficiency of the CRISPR system make it ideally suited to this task. CRISPR Therapeutics is pursuing a similar approach for its allogeneic CAR-T programs and has established significant expertise in immune-evasive gene editing. T...
Timetable for Completion. Unless otherwise agreed to by the Parties in writing, in any arbitration under this Section 13.9, the Parties and the arbitrator will use all reasonable efforts to resolve such Dispute within sixty (60) days following the selection of the arbitrator, or as soon thereafter as is reasonably practicable.
Timetable for Completion iXL will provide interactive services on the ------------------------ timetable established in the "Project Timetable and Deliverables Schedule" in the Statement of Work (the "Project Timetable"). Endeavor will provide to iXL the media elements, materials, timely approvals, and assistance necessary for iXL to complete the Custom Works and other services on the Project Timetable. Any delay by Endeavor in providing materials, approvals, and assistance to iXL shall extend the deadline for the subsequent tasks of iXL under the Project Timetable by a period at least equal to Endeavor's delay. In addition, for any Endeavor obligation described as time-sensitive or critical in the Statement of Work, failure of Endeavor to meet its deadline will entitle iXL to prepare a revised Project Timetable based on a realistic estimate of the effect of the delay on the completion of the project, taking into account other work scheduled by iXL. In addition to providing progress reports and arranging project planning meetings to the extent required under the Project Timetable, iXL agrees that the current prototype of the Custom Works shall be accessible to Endeavor throughout the development phase at the URL identified in the Statement of Work.
AutoNDA by SimpleDocs
Timetable for Completion iXL will provide the services and products to prepare and complete the Client Web Site on the timetable established in the "Project Timetable, Works Delivery and Payment Schedule" in the Statement (the "Project Timetable"). Client will provide to iXL the Client Materials including all media elements, materials, timely approvals, and assistance necessary for iXL to complete the Client Web Site on the Project Timetable. Any delay by the Client in providing materials, approvals, and assistance to iXL shall extend the deadline for the subsequent tasks of iXL under the Project Timetable by a period at least equal to Client's delay. In addition, for any Client obligation described as time-sensitive or critical in the Statement, failure of the Client to meet its deadline will entitle iXL to prepare a revised Project Timetable based on a realistic estimate of the effect of the delay on the completion of the project, taking into account other work scheduled by iXL.
Timetable for Completion. The Parties shall use, and shall direct the Expert to use, best efforts to resolve any Expert Dispute within [* * *] after the selection of the Expert, or if resolution within [* * *] is not reasonably achievable, as determined by the Expert, then as soon thereafter as is reasonably practicable.

Related to Timetable for Completion

  • Timetable In order to set a timetable and procedural framework within which the subcommittees will accomplish their tasks, the parties have further agreed to the following: The subcommittees referenced in Section 1 above will be appointed and have their first organizational meeting within six (6) weeks of the date of the MOU ratification. Each subcommittee shall provide to the Head of the affected Department a final report no later than thirty (30) weeks after the date of the MOU ratification. The Department Head who receives a final report will meet with the LMC to provide feedback on the report, indicating areas of acceptance and explaining the reasons for rejecting any of the recommendations in the report.

  • Project Completion Part 1 – Material Completion

  • Timeline Contractor must perform the Services and deliver the Deliverables according to the following timeline: • •

  • Tests and Preclinical and Clinical Trials The studies, tests and preclinical and clinical trials conducted by or, to the Company’s knowledge, on behalf of the Company were and, if still ongoing, are being conducted in all material respects in accordance with experimental protocols, procedures and controls pursuant to accepted professional scientific standards and all Authorizations and Applicable Laws, including, without limitation, the Federal Food, Drug and Cosmetic Act and the rules and regulations promulgated thereunder (collectively, “FFDCA”); the descriptions of the results of such studies, tests and trials contained in the Registration Statement, the General Disclosure Package and the Prospectus are, to the Company’s knowledge, accurate in all material respects and fairly present the data derived from such studies, tests and trials; except to the extent disclosed in the Registration Statement, the General Disclosure Package and the Prospectus, the Company is not aware of any studies, tests or trials, the results of which the Company believes reasonably call into question the study, test, or trial results described or referred to in the Registration Statement, the General Disclosure Package and the Prospectus when viewed in the context in which such results are described and the clinical state of development; and, except to the extent disclosed in the Registration Statement, the General Disclosure Package or the Prospectus, neither the Company nor any Subsidiary has received any notices or correspondence from the FDA or any Governmental Entity requiring the termination or suspension of any studies, tests or preclinical or clinical trials conducted by or on behalf of the Company, other than ordinary course communications with respect to modifications in connection with the design and implementation of such trials, copies of which communications have been made available to you.

  • PHASE is a distinct portion of the Work to be provided under this Agreement, as specified in the Statement Of Work.

  • Final Completion The full and final completion of all Work in accordance with the Contract Documents.

  • Project Schedule Construction must begin within 30 days of the date set forth in Appendix A, Page 2, for the start of construction, or this Agreement may become null and void, at the sole discretion of the Director. However, the Recipient may apply to the Director in writing for an extension of the date to initiate construction. The Recipient shall specify the reasons for the delay in the start of construction and provide the Director with a new start of construction date. The Director will review such requests for extensions and may extend the start date, providing that the Project can be completed within a reasonable time frame.

  • After Completion the Seller shall at its cost execute and deliver all such further documents and/or take such other action as the Purchaser may reasonably request in order to effect (i) the release and discharge in full of the relevant member of the Purchaser’s Group from any and all Retained Liabilities and any Liabilities related to the Retained Assets and (ii) the assumption by the Seller or any member of the Seller’s Group as the primary obligor in respect of any and all Retained Liabilities or Liabilities related to the Retained Assets in substitution for the relevant member of the Purchaser’s Group (in each case on a non-recourse basis to any member of the Purchaser’s Group).

  • Approval and Completion If any dispute regarding the design of the Tenant Improvements is not settled within 10 business days after notice of such dispute is delivered by one party to the other, Tenant may make the final decision regarding the design of the Tenant Improvements, provided (i) Tenant acts reasonably and such final decision is either consistent with or a compromise between Landlord’s and Tenant’s positions with respect to such dispute, (ii) that all costs and expenses resulting from any such decision by Tenant shall be payable out of the TI Fund (as defined in Section 5(d) below), and (iii) Tenant’s decision will not affect the base Building, structural components of the Building or any Building systems (in which case Landlord shall make the final decision). Any changes to the TI Construction Drawings following Landlord’s and Tenant’s approval of same requested by Tenant shall be processed as provided in Section 4 hereof.

  • Phase II A small portion of the work for the Phase II modifications to the Plattsburgh Substation will be performed by Transmission Owner, and the remainder will be performed by Clinton and Xxxxxxxxx. A detailed definition of the specific scope for Transmission Owner and Clinton and Xxxxxxxxx including interface points shall be defined during the design phase and, as such documents become available, copies will be delivered to the NYISO, Transmission Owner, Noble Altona Windpark, LLC and Marble River, LLC. The full scope includes the installation of wave traps, CCVT’s and modifications and/or additions to relaying on the MWP-1 and MWP- 2 lines. These lines will be reconfigured at the completion of Phase II to connect to Xxxxx and Xxxxxxx Substations on MWP-1 and the Xxxx Substation on MWP-2. Clinton and Xxxxxxxxx will design the upgrades and purchase the materials based on the outline specification that was prepared and issued by Transmission Owner. The work to be performed by Clinton and Xxxxxxxxx will include both the materials for the exterior and interior installations and items for Transmission Owner installation inside the control building in existing relay panels and communication racks. In addition, Clinton and Xxxxxxxxx will be responsible for the exterior and interior construction work and will provide construction management services in coordination with Transmission Owner. The civil design for the foundations and the electrical design for the cable runs to the control room will be designed by, as approved by Transmission Owner, and installed under the supervision and control of Clinton and Xxxxxxxxx. The equipment will be selected and procured in accordance with the specifications developed during the detailed engineering phase, copies of which shall be furnished to the NYISO, Transmission Owner, Noble Altona Windpark, LLC and Marble River, LLC. The construction of the foundations, structures, wave traps, CCTV and cable runs into the control building to the termination cabinets will be completed by Clinton and Xxxxxxxxx. The work at the Plattsburgh Substation will be installed under Transmission Owner’s CPP-1. Transmission Owner will provide Protection and Controls Engineering, install and terminate wiring from the termination cabinets to the control panels and relays, install relays and equipment in the existing panels, and will commission such work inside the 230kV control building. Transmission Owner will develop the communications protocols and data flow over the circuits.

Time is Money Join Law Insider Premium to draft better contracts faster.