Time Stamps Sample Clauses

Time Stamps. The Contractor shall provide time stamps for use in audit record generation. The time stamps shall include the date and time values generated by the internal system clocks in the audit records. The agency shall synchronize internal information system clocks on an annual basis.
AutoNDA by SimpleDocs
Time Stamps. The format of the time stamps provided with the Service and their time validity are indicated in the Certificate Practice Statement. OBLIGATIONS AND RESPONSIBILITIES OF THE PARTIES Art. 10. Obligations and responsibility of InfoCert
Time Stamps. Vendor shall provide a system capability that compares and synchronizes internal system clocks with an authoritative source to generate time stamps for audit records.
Time Stamps. All TS Information shall be associated with a time stamp to show when it was posted to the OASIS Node. h.

Related to Time Stamps

  • Preconstruction Phase Services Preconstruction Phase Services shall mean all services described in Article 3.1, and any similar services described in the Request for Proposals, including such similar services as are described in the Construction Manager at Risk’s Response to the Request for Proposals to the extent they are accepted by Owner, but excluding any Early Work. Early Work shall be considered part of Construction Phase Services.

  • Design Phase Services § 3.2.1 The Architect shall review the program and other information furnished by the Owner, and shall review laws, codes, and regulations applicable to the Architect’s services.

  • Construction Phase Services 3.1.1 – Basic Construction Services

  • Pre-Commencement Phase Services The services required to be provided by the Contractor for the Pre- Commencement Phase of the Project in accordance with the Contract Documents.

  • Handover ‌ Unless otherwise agreed, a handover in order to ensure that the Delivery is in accordance with the Agreement shall be conducted immediately after assembly. Both Parties must be represented when the handover is carried out. Any shortcomings/deficiencies will be registered in the shortage list in a handover form and the shortcomings/deficiencies must be rectified without undue delay by the Supplier. The Supplier is aware that there will be limited time for rectifications, as the place of delivery, cf. clause 5, may have limited space and rehearsals may start immediately after assembly. The Supplier must adjust to the circumstances. The Supplier shall be liable for any deficiencies in accordance with clause 22.3 and 22.4, irrespective of whether or not the deficiencies have been stated in the shortage list.

  • Commissioning Commissioning tests of the Interconnection Customer's installed equipment shall be performed pursuant to applicable codes and standards. If the Interconnection Customer is not proceeding under Section 2.3.2, the Utility must be given at least ten (10) Business Days written notice, or as otherwise mutually agreed to by the Parties, of the tests and may be present to witness the commissioning tests.

  • Installation, Inspection, and Maintenance The Contractor is responsible for installation and maintenance of the BMPs as a part of its Bid. The Design Professional shall obtain the services of a qualified testing laboratory to inspect the BMPs in accordance with the permits, the costs of such inspections to be borne by the Owner. In the event of Abnormal Weather Conditions or force majeure, the Contractor shall be compensated for re-installation of BMPs at established Unit Prices.

  • SS7 Network Interconnection 9.7.1 SS7 Network Interconnection is the interconnection of Global Connection local signaling transfer point switches or Global Connection local or tandem switching systems with BellSouth signaling transfer point switches. This interconnection provides connectivity that enables the exchange of SS7 messages among BellSouth switching systems and databases, Global Connection local or tandem switching systems, and other third-party switching systems directly connected to the XxxxXxxxx XX0 network.

  • PRE-CONSTRUCTION PHASE SERVICES The Pre-Construction Phase shall be deemed to commence upon the date specified in a written Notice to Proceed with Pre-Construction Phase Services issued by Owner and shall continue through completion of the Construction Documents and procurement of all major Subcontractor agreements. Contractor is not entitled to reimbursement for any costs incurred for Pre-Construction Phase Services performed before issuance of the written Notice to Proceed. Pre-Construction Phase Services may overlap Construction Phase Services. Contractor shall perform the following Pre-Construction Phase Services:

  • Joint Network Implementation and Grooming Process Upon request of either Party, the Parties shall jointly develop an implementation and grooming process (the “Joint Grooming Process” or “Joint Process”) which may define and detail, inter alia: