Time for Performance Scheduling and Progress Maintenance Sample Clauses

Time for Performance Scheduling and Progress Maintenance. 23.1. The CM shall be responsible for School Project scheduling and efficient and timely prosecution and completion of the Work. The obligations and duties of the CM with regard to scheduling and progress maintenance shall be as follows:
AutoNDA by SimpleDocs
Time for Performance Scheduling and Progress Maintenance 

Related to Time for Performance Scheduling and Progress Maintenance

  • Maintenance Scheduling The NTO shall schedule maintenance of its facilities designated as NTO Transmission Facilities Under ISO Operational Control and schedule any outages (other than forced transmission outages) of said transmission system facilities in accordance with outage schedules approved by the ISO. The NTO shall comply with maintenance schedules coordinated by the ISO, pursuant to this Agreement, for NTO Transmission Facilities Under ISO Operational Control. The NTO shall be responsible for providing notification of maintenance schedules to the ISO for NTO Transmission Facilities Requiring ISO Notification. The NTO shall provide notification of maintenance schedules to affected Transmission Owners for NTO Transmission Facilities Requiring ISO Notification and Local Area Transmission Facilities pursuant to Section 3.5.3 of the ISO Services Tariff.

  • Planned Maintenance (a) Sellers may designate up to twenty (20) Days of Planned Maintenance on Sellers’ Facilities during each Contract Year. Sellers shall be entitled to reduce (including down to zero (0)) its Gas scheduling under Clause 8 and Exhibit 3 for each Day of Planned Maintenance.

  • Operating and Maintenance Manuals 58.1 If “as built” Drawings and/or operating and maintenance manuals are required, the Contractor shall supply them by the dates stated in the Contract Data.

  • Preventive Maintenance The Contractor shall provide necessary preventive maintenance, required testing and inspection, calibration and/or other work necessary to maintain the equipment in complete operational condition during the warranty period.

  • Operation and Maintenance Manuals Receipts for transmittal of Operation and Maintenance Manuals, Brochures and Data to the Design Professional (or Commissioning Agent) as required by Section 6.1.1.5.

  • Ordering and Maintenance CBB shall use Verizon’s electronic Operations Support System access platforms to submit Orders and requests for maintenance and repair of Services, and to engage in other pre-ordering, ordering, provisioning, maintenance and repair transactions. If Verizon has not yet deployed an electronic capability for CBB to perform a pre-ordering, ordering, provisioning, maintenance or repair, transaction offered by Verizon, CBB shall use such other processes as Verizon has made available for performing such transaction (including, but not limited, to submission of Orders by telephonic facsimile transmission and placing trouble reports by voice telephone transmission).

  • System Maintenance The Trust understands that USBFS will perform periodic maintenance to the System(s), which may cause temporary service interruptions. To the extent possible, USBFS shall notify the Trust of all planned outages and will perform any necessary maintenance during non-business hours.

  • Corrective Maintenance ‌ Corrective Maintenance as referred to herein shall mean Repair and/or Replacement Services. For the purposes of evaluating whether Corrective Maintenance qualifies as either Minor or Major Corrective Maintenance, the Contractor shall calculate the total cost of the Corrective Maintenance in accordance with the following formulas, and the cost shall be calculated per Repair Item which shall be compared to the Major/Minor Corrective Maintenance Threshold listed in Table 2. Total Cost of Repair Item = (Labor Cost) + (Material Cost) Where: Labor Cost = (H) x [(1 + LMR/100) x (PWR + SB)] H = Number of labor hours needed to complete the Corrective Maintenance LMR = Labor Markup Rate (%) PWR = Prevailing Wage Rate SB = Supplemental Benefits Material Cost = (Cost of Materials) x (1 + MMR/100) Where: MMR = Materials Markup Rate (%) The Contractor’s Monthly Maintenance fee shall include, but is not necessarily limited to, all preventative maintenance service and all corrective maintenance service with a total cost (labor and materials) less than or equal to the thresholds listed in the following table, which shall be referred to as ‘Minor Corrective Maintenance: Table 2: Corrective Maintenance Thresholds Lot(s) Type of Equipment Major/Minor Corrective Maintenance Threshold 1 Gearless Traction Elevators $2500 1 Geared Traction Elevators $2500 2 Hydraulic Elevators $1000 3 Escalators $2500 4 Wheelchair Lifts $500 4 Stage Lifts $500 4 Dumbwaiters $500 Corrective maintenance work that has a Total Cost that exceeds these thresholds shall be considered Major Corrective Maintenance. The Contractor shall justify all costs for Major Corrective Maintenance to the Authorized User’s satisfaction, and for Repair Items that qualify as Major Corrective Maintenance the Contractor shall be compensated for the full cost of the work unless the corrective maintenance is determined to be the result of the Contractor’s negligence, in which case the Contract shall not be additionally compensated. Prior to performing any Major Corrective Maintenance, the Contractor shall submit a Cost Proposal to the Authorized User for approval. The Cost Proposal shall be a maximum, not to exceed price; shall include all labor and material costs associated with the Major Corrective Maintenance and shall be calculated on a per item basis (like items shall not be combined in the calculation). Upon approval, a letter authorizing the work will be issued by the Authorized User and a copy of such letter must accompany the invoice for the Major Corrective Maintenance services. Please note that if subcontractors are to be used, the requirements of Section 2.22 ‘Subcontracting of Work’ shall be met.

  • Cleaning and Maintenance 7.8.1 To keep all parts of the Leasehold Area clean and tidy;

  • Project Maintenance The Local Government shall be responsible for maintenance of locally owned roads and locally owned facilities after completion of the work. The State shall be responsible for maintenance of the state highway system after completion of the work if the work was on the state highway system, unless otherwise provided for in existing maintenance agreements with the Local Government.