THE PIPELINE Sample Clauses

THE PIPELINE. The Parties to this Agreement are relying on the change of service of the Longhorn Pipeline (“Pipeline”) located near Crane, Texas by Magellan Pipeline Company, LP (“Magellan”), which change shall be a condition precedent to this Agreement. The Pipeline is intended to be reversed and converted for crude shipments and will be owned and operated by Magellan. The completion date for the reversal is anticipated to be sometime during the first quarter of 2013. STUSCO has executed a contract (“Magellan Contract”) with Magellan to secure space on the Pipeline for transportation of Crude Oil from Crane, TX to the Houston area.
AutoNDA by SimpleDocs
THE PIPELINE. Transportation Facilities include a high-pressure gas transmission pipeline and one Regulating and Metering Station (RMS). The length of transmission pipeline shall be from the source (gas grid) to inlet of the RMS. Design of the transmission pipeline shall be as per ANSI B 31.8: Gas Transmission & Distribution Systems. The class rating shall be as per ANSI class 600. The pipeline must be constructed by the Company or through a Sub-Contractor having proven experience of constructing at least one ANSI class 600, 8” or above diameter pipeline. Welding of pipeline shall be as per API Standard 1104. The welding joints must be enveloped with Heat Shrink Sleeves and the Induction Bends with two-ply polyethylene tapes (Inner Wrap and Outer Wrap). The pipeline must have a minimum cover of 1.0 meter on top of it. Watercourse (if any) shall be crossed by open cut method or Horizontal Directional Drilling (HDD) method depending on the actual site condition. Insulating joints must be used at both ends of the pipeline section. The pipeline shall also be cathodically protected and the design of the cathodic protection system shall be on the basis of soil resistivity as measured in the field. Minimum corrosion allowance shall be 3 mm. • Steel line pipe will be required to use in the transmission pipeline, manufactured as per API Specification SL (latest edition). The line pipe manufacturer must have the authority to use API Official Monogram for minimum five (5) years. The grade of pipe shall be API 5LX60, PSL-2 LSAW. The coating of line pipe shall be 3LPE and factory coated. Minimum wall thickness required to be maintained to operate the pipeline at maximum pressure. • Steel Induction Bends must be fabricated from line pipe to be manufactured as per API Specification 5L (latest edition) by a manufacturer having the authority to use API Official Monogram for minimum five (5) years. The Induction Bend fabricator must have the authority to fabricate Induction Bends under applicable certification for minimum five (5) years. • Ball Valves shall be actuator operated (for main line valves) and gear operated (for other valves), full bore, forged body, fully welded, trunnion mounted combined with double block and bleed, metal-to-metal seal, sealant injection & drain, and must be manufactured as per API-6D by a manufacturer having the authority to use API Official Monogram for minimum five (5) years. • Dynamic/Pressure Balance Plug Valves shall be gear operated, full bore, forged...

Related to THE PIPELINE

  • Underground Storage Tanks In accordance with the requirements of Section 3(g) of the D.C. Underground Storage Tank Management Act of 1990, as amended by the District of Columbia Underground Storage Tank Management Act of 1990 Amendment Act of 1992 (D.C. Code § 8-113.01, et seq.) (collectively, the “UST Act”) and the applicable D.C. Underground Storage Tank Regulations, 20 DCMR Chapter 56 (the “UST Regulations”), District hereby informs the Developer that it has no knowledge of the existence or removal during its ownership of the Property of any “underground storage tanks” (as defined in the UST Act). Information pertaining to underground storage tanks and underground storage tank removals of which the D.C. Government has received notification is on file with the District Department of the Environment, Underground Storage Tank Branch, 00 X Xxxxxx, X.X., Xxxxx Xxxxx, Xxxxxxxxxx, X.X., 00000, telephone (000) 000-0000. District’s knowledge for purposes of this Section shall mean and be limited to the actual knowledge of Xxxxxx Xxxxx, Property Acquisition and Disposition Division of the Department of Housing and Community Development, telephone no. (000) 000-0000. The foregoing is set forth pursuant to requirements contained in the UST Act and UST Regulations and does not constitute a representation or warranty by District.

  • Storage Tanks If storage tanks storing Hazardous Materials located on the Premises or the Project are used by Tenant or are hereafter placed on the Premises or the Project by Tenant, Tenant shall install, use, monitor, operate, maintain, upgrade and manage such storage tanks, maintain appropriate records, obtain and maintain appropriate insurance, implement reporting procedures, properly close any storage tanks, and take or cause to be taken all other actions necessary or required under applicable state and federal Legal Requirements, as such now exists or may hereafter be adopted or amended in connection with the installation, use, maintenance, management, operation, upgrading and closure of such storage tanks. Notwithstanding anything to the contrary contained herein, Tenant shall have no right to use or install any underground storage tanks at the Project.

  • Interconnection 2.1.10 Startup Testing and Commissioning

  • STORAGE TANKS AND SUMPS 3.1 Is any above or below ground storage of gasoline, diesel, petroleum, or other Hazardous Materials in tanks or sumps proposed in, on or about the Premises? Existing Tenants should describe any such actual or proposed activities. Yes [ ] No [ ] If yes, please explain:

  • Delivery Point (a) All Energy shall be Delivered hereunder by Seller to Buyer at the Delivery Point. Seller shall be responsible for the costs of delivering its Energy to the Delivery Point consistent with all standards and requirements set forth by the FERC, ISO-NE, the Interconnecting Utility and any other applicable Governmental Entity and any applicable tariff.

  • Delivery Points ‌ Project water made available to the Agency pursuant to Article 6 shall be delivered to the Agency by the State at the delivery structures established in accordance with Article 10.

  • Underground Tanks If underground or other storage tanks storing Hazardous Materials located on the Premises or the Project are used by Tenant or are hereafter placed on the Premises or the Project by Tenant, Tenant shall install, use, monitor, operate, maintain, upgrade and manage such storage tanks, maintain appropriate records, obtain and maintain appropriate insurance, implement reporting procedures, properly close any underground storage tanks, and take or cause to be taken all other actions necessary or required under applicable state and federal Legal Requirements, as such now exists or may hereafter be adopted or amended in connection with the installation, use, maintenance, management, operation, upgrading and closure of such storage tanks.

  • Regulated Entities None of the Company, any Person controlling the Company, or any Subsidiary, is an "Investment Company" within the meaning of the Investment Company Act of 1940. The Company is not subject to regulation under the Public Utility Holding Company Act of 1935, the Federal Power Act, the Interstate Commerce Act, any state public utilities code, or any other Federal or state statute or regulation limiting its ability to incur Indebtedness.

  • HEATING, VENTILATING AND AIR CONDITIONING General Office Area: The building shall be equipped with a combination heating, ventilation and air conditioning system. The system shall have ducted supply and return air. The space above the ceiling shall not be used as a supply or return plenum. The systems shall be sized in accordance with the weather conditions identified in Chapter 13, “Energy Conservation” of the 1996 BOCA Building Code and supplemented by the “Building Code Rules”. All HVAC equipment shall be commercial or light industrial grade. If new construction it shall be installed at grade or within mechanical rooms for easy access and maintenance. If existing construction, roof mounted equipment will be considered after all other options have been exhausted, including the elimination of noise and vibration transfer to the structural members. The HVAC systems shall be zoned, with units sized and placed as required by heating and cooling loads on the building. Zoning of systems is dependent on the size, shape and orientation of the building. The HVAC system shall be divided into a minimum of 4 exterior and 1 interior temperature control zones. Return air shall be taken from the area supplied or adjacent to the area in the same temperature control zone. The ventilation and exhaust system shall be sized to maintain a positive pressure throughout the building envelope to limit air and dust infiltration. No HVAC ductwork shall be installed under the floor slab or underground.

Time is Money Join Law Insider Premium to draft better contracts faster.