Testing specimens Sample Clauses

Testing specimens. The moulds for test cubes shall be of metal and true to shape to give a 150mm and shall be oiled before filling. The mould shall be filled with concrete taken from that actually placed in the works, the concrete being selected by the Engineer from a point as near as possible to the position of placing. The filling of the moulds shall be done immediately after the selection of the sample concrete and in such a way that the concrete in the moulds be truly representative of that in the works. The concrete shall be placed in the moulds in three layers of equal thickness, each layer being rammed with 25 strokes of a steel bar 40 mm diameter, (or equivalent), weighing 2 kg. If the concrete in the works be consolidated by mechanical vibration, the test cube moulds shall be likewise vibrated after filling. Each cube shall be inscribed with the date of manufacture and identification mark. A record shall be kept for each batch of cubes showing the position in the works which the concrete represents, the date of manufacture, the mixture and slump of the concrete, particulars of the cement and aggregate used, a statement of whether or not the cubes are vibrated and other information relating to the subsequent history of the cubes. The moulds containing the test cubes shall be stored for 24 hours on the site in a damp place free from vibration. At the end of this period the cubes shall be taken from the moulds and stored in damp sand for 20 days if they are to be tested at 28 days or for 4 days if they are to be tested at 7 days. The Contractor shall be instructed about the dispatch of the cubes to an approved laboratory and will pay all costs relating to the tests. A set of four cubes will be required for not more than every 60 cubic metres of concrete placed in the works.
AutoNDA by SimpleDocs

Related to Testing specimens

  • ODUF Packing Specifications 6.3.1 The data will be packed using ATIS EMI records. A pack will contain a minimum of one (1) message record or a maximum of ninety-nine thousand nine hundred and ninety-nine (99,999) message records plus a pack header record and a pack trailer record. One transmission can contain a maximum of ninety-nine (99) packs and a minimum of one (1) pack.

  • EODUF Packing Specifications 7.3.1 The data will be packed using ATIS EMI records. A pack will contain a minimum of one (1) message record or a maximum of ninety-nine thousand nine hundred and ninety-nine (99,999) message records plus a pack header record and a pack trailer record. One transmission can contain a maximum of ninety-nine (99) packs and a minimum of one (1) pack.

  • Billing Specifications 55.6.1 The Parties agree that billing requirements and outputs will be consistent with the Ordering & Billing Form (OBF) and also with Telcordia Technologies Billing Output Specifications (BOS).

  • Packing Specifications 7.3.1 A pack will contain a minimum of one message record or a maximum of 99,999 message records plus a pack header record and a pack trailer record. One transmission can contain a maximum of 99 packs and a minimum of one pack.

  • Laboratory Testing All laboratories selected by UPS Freight for analyzing Controlled Substances Testing will be HHS certified.

  • Health plan specification The Employer will require health plans participating in the Group Insurance Program to develop and implement health promotion and health education programs for State employees and their dependents.

  • SAMPLE (i) Unless agreed otherwise, wheeled or track lay- ing equipment shall not be operated in areas identified as needing special measures except on roads, landings, tractor roads, or skid trails approved under B5.1 or B6.422. Purchaser may be required to backblade skid trails and other ground disturbed by Purchaser’s Opera- tions within such areas in lieu of cross ditching required under B6.6. Additional special protection measures needed to protect such known areas are identified in C6.24.

  • Drug Testing (A) The state and the PBA agree to drug testing of employees in accordance with section 112.0455, F.S., the Drug-Free Workplace Act.

  • Loop Testing/Trouble Reporting 2.1.6.1 Think 12 will be responsible for testing and isolating troubles on the Loops. Think 12 must test and isolate trouble to the BellSouth portion of a designed/non- designed unbundled Loop (e.g., UVL-SL2, UCL-D, UVL-SL1, UCL-ND, etc.) before reporting repair to the UNE Customer Wholesale Interconnection Network Services (CWINS) Center. Upon request from BellSouth at the time of the trouble report, Think 12 will be required to provide the results of the Think 12 test which indicate a problem on the BellSouth provided Loop.

  • DAF Specifications Developer shall submit initial specifications for the DAF, including System Protection Facilities, to Connecting Transmission Owner and NYISO at least one hundred eighty (180) Calendar Days prior to the Initial Synchronization Date; and final specifications for review and comment at least ninety (90) Calendar Days prior to the Initial Synchronization Date. Connecting Transmission Owner and NYISO shall review such specifications to ensure that the DAF are compatible with the technical specifications, operational control, and safety requirements of the Connecting Transmission Owner and NYISO and comment on such specifications within thirty (30) Calendar Days of Developer’s submission. All specifications provided hereunder shall be deemed to be Confidential Information.

Time is Money Join Law Insider Premium to draft better contracts faster.