Test run Sample Clauses

Test run. Testing of aircraft engines after overhaul, control or repair in open skies, in which the engines are mounted on the aircraft.
AutoNDA by SimpleDocs
Test run. (1) With Contractor providing production technology or architectural design as agreed under article 5.1.1, Contractor shall ensure to achieve the assured index in test run or the function during commissioning inspection cycle under article 5.1.1.
Test run. Testing of aeroplane engines after overhaul, control or repair in open skies, in which the engines are mounted on the aircraft. Airport Tariff Agreement 2022 Maastricht Aachen Airport 5
Test run. An individual emission test which encompasses the time required to consume the mass of the test fuel charge.
Test run. Within 60 days of receipt of contract award the contractor must schedule and conduct a 2 hour test-run of the propane-air plant. This test operation is to establish current operating condition of the system. This test will be conducted using the on-site flare as a load, no propane-air product will be injected into the Camp Xxxxxx natural gas distribution system. Any operational deficiencies will be reported to the owner's representative along with an appropriate course of corrective action.
Test run. The evaluation of the capacity guarantee will be established from the operation at a minimum average load of 90% of the Licensed Plant over a continuous five day period with any two test run periods of 24 hours duration having to be run at l00Mwth. Evaluation of cold gas efficiency and oxygen consumption guarantee figures will be based on one of the above two test run periods. Ramp up and ramp down operating periods at the start and at the end of the five day test run are excluded. Operating time prior to any down time not attributable to BGL is credited for aggregation with further operating time thereafter.
Test run. If installed equipment meets single-unit no-load test run requirements, Party B shall arrange for the test run and notify Party A's Representative 48 hours prior to the test run. The notice shall include the scope, time, and place of the test run. Party B shall prepare the test run record forms. Party A shall provide support needed for the test run. After the test run is successfully performed, Party A's Representative shall sign the test run record forms. If installed equipment meets linked-unit no-load test run requirements, Party A shall arrange for the test run and notify Party B 48 hours prior to the test run. The notice shall include the scope, time, and place of the test run as well as requirements for the preparation work to be performed by Party B. Party B shall complete the required preparation work and prepare the test run forms. After the test run is successfully performed, both Parties shall sign the test run forms before proceeding to project completion and acceptance. If design defects result in failure of the test run to meet acceptance requirements, Party A shall modify the design and Party B shall re-install the equipment pursuant to the modified design. Party A shall be responsible for the expenses of modifying the design as well as of removing and reinstalling the equipment. The term of construction shall be extended accordingly. If manufacturing defects in the equipment result in failure of the test run to meet acceptance requirements, the party that purchased the equipment shall be responsible for the repurchase or repair of the equipment. Party B shall be responsible for removing and reinstalling the equipment. If the equipment was purchased by Party B, Party B shall be responsible for the expenses of repairing or repurchasing as well as of removing and reinstalling the equipment, and the term of construction shall not be extended. If the equipment was purchased by Party A, Party A shall be responsible for all the expenses listed above and the term of construction shall be extended accordingly. If the test run fails to meet acceptance requirements due to problems in Party B's construction work, Party A's Representative shall present opinions on modification within 24 hours after the test run. Party B shall complete the modification and conduct the test run again. Party B shall be responsible for the expenses of the modification and the re-run, and the term of construction shall not be extended. Party A shall bear the cost of the test...
AutoNDA by SimpleDocs
Test run. At least two hours before the test each filter for measurement of the emission of particulate pollutants shall be placed in a closed but unsealed petri dish and placed in the weighing chamber for stabilization. At the end of the stabilization period each filter is weighed and the tare weight recorded. The filter is then stored in the petri dish which must remain in the weighing chamber, or a sealed filter holder until needed for testing. If the filter is not used within one hour of its removal from the weighing chamber, it must be re-weighed before use. During each mode of the test cycle the specified speed must be held to within ± 2 per cent of the maximum torque at the engine test speed. In the case of C.I. engines the fuel at the injection pump inlet must be 306-316 K (33°C - 43°C). The governor and fuel system must be adjusted as established by the manufacturer's sale and service literature. E/ECE/324 Rev.1/Add.48/Rev.3 Regulation No. 49 page 33 Annex 4 In the case of NG engines the fuel temperature and the pressure at pressure regulator final stage shall be within the range specified by the manufacturer; the speed limiting device and fuel system must be adjusted as established by the manufacturer's sales and service literature. The following steps are taken for each test:

Related to Test run

  • Acceptance Testing At the time of installation of a LIS trunk group, and at no additional charge, acceptance tests will be performed to ensure that the service is operational and meets the applicable technical parameters.

  • Test Procedures For an Asset Review, the Asset Representations Reviewer will perform for each Asset Review Receivable the procedures listed under “Procedures to be Performed” in Schedule A for each representation and warranty (each, a “Test”), using the Asset Review Materials listed for each such Test in Schedule A. For each Test and Asset Review Receivable, the Asset Representations Reviewer will determine if the Test has been satisfied (a “Test Pass”) or if the Test has not been satisfied (a “Test Fail”).

  • Project Completion Part 1 – Material Completion

  • Commissioning Commissioning tests of the Interconnection Customer's installed equipment shall be performed pursuant to applicable codes and standards. If the Interconnection Customer is not proceeding under Section 2.3.2, the Utility must be given at least ten (10) Business Days written notice, or as otherwise mutually agreed to by the Parties, of the tests and may be present to witness the commissioning tests.

  • Stability Testing Patheon may be requested to conduct stability testing on the Products in accordance with the protocols set out in the Specifications for the separate fees and during the time periods set out in Schedule C to a Product Agreement. Patheon will not make any changes to these testing protocols without prior written approval from Client. If a confirmed stability test failure occurs, Patheon will notify Client within one Business Day, after which Patheon and Client will jointly determine the proceedings and methods to be undertaken to investigate the cause of the failure, including which party will bear the cost of the investigation. Patheon will not be liable for these costs unless it has failed to perform the Manufacturing Services in accordance with the Specifications, cGMPs, and Applicable Laws. Patheon will give Client ail stability test data and results at Client’s request.

  • Performance Tests Contractor shall perform Performance Tests in accordance with Section 11.2 of the Agreement and Attachment S.

  • Project Scope The physical scope of the Project shall be limited to only those capital improvements as described in Appendix A of this Agreement. In the event that circumstances require a change in such physical scope, the change must be approved by the District Committee, recorded in the District Committee's official meeting minutes, and provided to the OPWC Director for the execution of an amendment to this Agreement.

  • Project Schedule Construction must begin within 30 days of the date set forth in Appendix A, Page 2, for the start of construction, or this Agreement may become null and void, at the sole discretion of the Director. However, the Recipient may apply to the Director in writing for an extension of the date to initiate construction. The Recipient shall specify the reasons for the delay in the start of construction and provide the Director with a new start of construction date. The Director will review such requests for extensions and may extend the start date, providing that the Project can be completed within a reasonable time frame.

  • Contract Price 5.01 Owner shall pay Contractor for completion of the Work in accordance with the Contract Documents the amounts that follow, subject to adjustment under the Contract:

Time is Money Join Law Insider Premium to draft better contracts faster.