Test case 3 Sample Clauses

Test case 3. Virtual Data Centre VM migration‌ This test case aims to further demonstrate that the requirements for Virtual Data Centres have been achieved. As well as orchestration and allocation, there must also be support for runtime service recovery of VDC instances. Furthermore, we aim to demonstrate that the addition of optical circuit cut-through increases the performance of a VDC host in terms of how quickly Virtual Network instances can be redeployed in the event of physical hardware failure.
AutoNDA by SimpleDocs

Related to Test case 3

  • Test conditions 6.1.1. The test shall be performed on a flat, dry concrete or asphalt surface affording good adhesion.

  • Drug Test Results 1. All records pertaining to department-required drug tests shall remain confidential, and shall not be provided to other employers or agencies without the written permission of the person whose records are sought. However, medical, administrative, and immediate supervisory personnel may have access to relevant portions of the records as necessary to insure the acceptable performance of the officer's job duties.

  • Mileage Measurement Where required, the mileage measurement for LIS rate elements is determined in the same manner as the mileage measurement for V&H methodology as outlined in NECA Tariff No. 4.

  • Test The outer surface of the lamp lenses shall be subjected once or more than once to the action of the sand jet produced as described above. The jet shall be sprayed almost perpendicular to the surface to be tested. The deterioration shall be checked by means of one or more samples of glass placed as a reference near the lenses to be tested. The mixture shall be sprayed until the variation in the diffusion of light on the sample or samples measured by the method described in Appendix 2, is such that: Δ d = (T5 - T4) / T2 ≤ 0.0250 ± 0.0025 Several reference samples may be used to check that the whole surface to be tested has deteriorated homogeneously. Annex 6 - Appendix 4

  • Test Results The employer, upon request from an employee or former employee, will provide the confidential written report issued pursuant to 4.9 of the Canadian Model in respect to that employee or former employee.

  • Usage Measurement Usage measurement for calls shall begin when answer supervision or equivalent Signaling System 7 (SS7) message is received from the terminating office and shall end at the time of call disconnect by the calling or called subscriber, whichever occurs first.

  • Non-Paid Status During Treatment After Positive Test The employee will be in a non-pay status during any absence for evaluation or treatment, while participating in a rehabilitation program.

  • Random Testing Notwithstanding any provisions of the Collective Agreement or any special agreements appended thereto, section 4.6 of the Canadian Model will not be applied by agreement. If applied to a worker dispatched by the Union, it will be applied or deemed to be applied unilaterally by the Employer. The Union retains the right to grieve the legality of any imposition of random testing in accordance with the Grievance Procedure set out in this Collective Agreement.

  • Acceptance/Performance Test 4.7.1 Prior to synchronization of the Power Project, the SPD shall be required to get the Project certified for the requisite acceptance/performance test as may be laid down by Central Electricity Authority or an agency identified by the central government to carry out testing and certification for the solar power projects.

  • CFR 200 328. Failure to submit such required Performance Reports may cause a delay or suspension of funding. 30 ILCS 705/1 et seq.

Time is Money Join Law Insider Premium to draft better contracts faster.