Technical Report Sample Clauses

Technical Report. 64 23.3 Return Location...............................................64 23.4
AutoNDA by SimpleDocs
Technical Report. Six (6) months prior to the Expiration Date (and in an updated form at return of the Aircraft), LESSEE will provide LESSOR with a Technical Evaluation Report in the form and substance of Exhibit L, as revised, and, in addition upon LESSOR's request, will make copies available of (a) drawings of the interior configuration of the Aircraft both as it presently exists and as it will exist at return, (b) an Airworthiness Directive status list, (c) a service bulletin incorporation list, (d) rotable tracked, hard-time and life-limited component listings, (e) a list of LESSEE-initiated modifications and alterations, (f) interior material burn certificates, (g) the Aircraft Maintenance Program, (h) the complete workscope for the checks, inspections and other work to be performed prior to return, (i) a list of all no-charge service bulletin kits with respect to the Aircraft which were ordered by LESSEE from Manufacturer or Engine manufacturer, (j) current Engine disk sheets and a description of the last shop visit for each Engine and (k) any other data which is reasonably requested by LESSOR.
Technical Report. Schedule III sets out the current technical report relating to the Mining Claims (the “Report”). The Report was at the time of filing compliant, in all material respects, with the requirements of the Modernization of Property Disclosures for Mining Registrants as promulgated and adopted by the Commission, and was true, complete and accurate in all material respects at the time of filing. The Company made available to the respective authors thereof prior to the issuance of the Report, for the purpose of preparing the Report, as applicable, all information requested, and no such information contained any material misrepresentation as at the time the relevant information was made available. The Report, as of its date, accurately and completely set forth all material facts relating to the Mining Claims, and as of the date hereof and the date of the Prospectus, there is no new material scientific or technical information concerning any of the Mining Claims required to be included in the Report.
Technical Report. No later than six (6) months prior to the Expiration Date (and in an updated form at return of the Aircraft), LESSEE will provide LESSOR with a Technical Evaluation Report in the form and substance of Exhibit O, as revised, and, in addition upon LESSOR’s request, will make copies available of (a) drawings of the interior configuration of the Aircraft both as it presently exists and as it will exist at return, (b) an Airworthiness Directive status list, (c) a service bulletin incorporation list, (d) rotable tracked, hard-time and life-limited component listings, (e) a list of modifications, alterations and repairs, (f) interior material burn certificates, (g) the Maintenance Program, (h) the complete workscopes for the checks, inspections and other work to be performed prior to return, (i) a forecast of the checks, inspections and other work to be performed within eighteen (18) months after return of the Aircraft, (j) a list of all no-charge service bulletin kits with respect to the Aircraft which were ordered by LESSEE from Manufacturer or the Engine Manufacturer, (k) current Engine disk sheets, (l) last Engine shop visit reports, (m) takeoff and cruise trend reports for the last nine (9) months and (n) any other data which is reasonably requested by LESSOR.
Technical Report. (i) The Material Property is the only material property of the Company for the purposes of NI 43-101.
Technical Report. Production information which provides the detailing, performance definition, specification, sizing and positioning of all systems and components enabling either construction (where the contractor is able to build directly from the information prepared) or the production of manufacturing and installation information for construction. Stage 4 is complete when the Design Documentation Report is approved.
Technical Report. The Contractor will contribute to the study-wide technical report that documents all the technical aspects of the study. Contributions by the Contractor will include psychometric procedures and decisions for the test and the survey data and the preparation of the public report. The technical report will be critical to ensure that contractors conducting and equating future rounds of national CC assessments can replicate the analyses and statistics. Additionally, decisions with regard to the construction of the scale for 2019 that may have implications for scaling and equating in 2022 are to be documented. Sections contributed by the Contractor include: quality assurance procedures used to check all data data coding rules, including the treatment of missing data and rules for counting and categorising student groups scaling procedures and results equating procedures and decisions and equating errors plausible value methodology reporting of results The current ABS remoteness classification system has five categories (Major Cities of Australia, Inner Regional Australia, Outer Regional Australia, Remote Australia and Very Remote Australia). Previous NAP–CC Public and Technical Reports are located on the Results and Reports page. On endorsement of the content and format of the report by ACARA, the Contractor will provide the final report for ACARA’s graphic designer.
AutoNDA by SimpleDocs
Technical Report. (i) The Escobal Mine is the only material property of Tahoe for the purposes of NI 43-101;
Technical Report. The technical report must contain the following elements:
Technical Report. GW agrees to provide to Sponsor a final technical report, which shall summarize the research program accomplishments and significant research findings. No other reports or deliverables are required to be submitted. The final technical report shall be submitted to Sponsor within ninety (90) days of the termination or expiration of this Agreement.
Time is Money Join Law Insider Premium to draft better contracts faster.