TAXONOMY AND SPECIES DESCRIPTION Sample Clauses

TAXONOMY AND SPECIES DESCRIPTION. The island marble butterfly (Euchloe ausonides insulanus) is a subspecies of the large marble butterfly (E. ausonides) in the Pieridae family, subfamily Pierinae, which primarily consists of yellow and white butterflies. The island marble butterfly was formally described in 2001, by Xxxxx and Xxxxxxx based on 14 specimens collected between 1859 and 1908 on or near Vancouver Island, British Columbia, Canada, and is geographically isolated from all other E. ausonides subspecies. The taxonomic status of the island marble butterfly is not in dispute. Euchloe ausonides insulanus is recognized as a valid subspecies by the Integrated Taxonomic Information System (ITIS 2015a, entire) based on the phenotypic differences documented in Xxxxx and Xxxxxxx 2001.
AutoNDA by SimpleDocs

Related to TAXONOMY AND SPECIES DESCRIPTION

  • Project Description In two or three brief sentences, provide a concise description of your exhibition. Include the subject matter, type of objects to be included (paintings, sculpture, manuscripts, etc.), those responsible for organizing the exhibition, and catalogue author(s).

  • Site Description 2.5.1 If reasonably requested by the A/E as necessary for the Project, the Owner shall furnish a legal description and a certified land survey of the Site, giving, as applicable, grades and lines of streets, alleys, pavements and adjoining property; rights-of-way, restrictions, easements, encroachments, zoning, deed restrictions, boundaries and contours of the Site; locations, dimensions, and complete data pertaining to existing buildings, other improvements, and trees; and full information concerning available service and utility lines, both public and private, above and below grade, including inverts and depths.

  • System Description The DLCS is a network consisting of devices which are remotely controlled over RF transmission equipment by the PowerCAMPTM Software or equivalent. CL&P shall have access to the PowerCAMP™ LMS (as defined below) via the web interface. The PowerCAMPTM LMS shall include the software and hardware necessary to manage the Control Devices installed at the End-use Equipment at Participating Facilities. The PowerCAMPTM LMS includes AER’s PowerCAMPTM Server and PowerCAMPTM Suite, networking equipment, and third party software. PowerCAMPTM LMS Hardware

  • Overtime Description Overtime Wage paid at time and one half the regular rate For "A" rated Apprentices (work in excess of 7 hours per day) For "M" rated Apprentices (work in excess of 8 hours per day) (Local #3) ELEVATOR CONSTRUCTOR‌ (Ratio of Apprentice to Journeyperson: 1 to 1, 1 to 2) Elevator (Constructor) - First Year Effective Period: 7/1/2015 - 3/16/2016 Wage Rate Per Hour: 50% of Journeyperson's rate Supplemental Rate Per Hour: $26.94 Effective Period: 3/17/2016 - 6/30/2016 Wage Rate Per Hour: 50% of Journeyperson's rate Supplemental Rate Per Hour: $28.41 Elevator (Constructor) - Second Year Effective Period: 7/1/2015 - 3/16/2016 Wage Rate Per Hour: 55% of Journeyperson's rate Supplemental Rate Per Hour: $27.35 Effective Period: 3/17/2016 - 6/30/2016 Wage Rate Per Hour: 55% of Journeyperson's rate Supplemental Rate Per Hour: $28.84 Elevator (Constructor) - Third Year Effective Period: 7/1/2015 - 3/16/2016 Wage Rate Per Hour: 65% of Journeyperson's rate Supplemental Rate Per Hour: $28.17 Effective Period: 3/17/2016 - 6/30/2016 Wage Rate Per Hour: 65% of Journeyperson's rate Supplemental Rate Per Hour: $29.69 Elevator (Constructor) - Fourth Year Effective Period: 7/1/2015 - 3/16/2016 Wage Rate Per Hour: 75% of Journeyperson's rate Supplemental Rate Per Hour: $29.00 Effective Period: 3/17/2016 - 6/30/2016 Wage Rate Per Hour: 75% of Journeyperson's rate Supplemental Rate Per Hour: $30.54 (Local #1) ELEVATOR REPAIR & MAINTENANCE‌ (Ratio of Apprentice to Journeyperson: 1 to 1, 1 to 2) Elevator Service/Modernization Mechanic (First Year) Effective Period: 7/1/2015 - 3/16/2016 Wage Rate Per Hour: 50% of Journeyperson's rate Supplemental Benefit Per Hour: $26.87 Effective Period: 3/17/2016 - 6/30/2016 Wage Rate Per Hour: 50% of Journeyperson's rate Supplemental Benefit Per Hour: $28.34 Elevator Service/Modernization Mechanic (Second Year) Effective Period: 7/1/2015 - 3/16/2016 Wage Rate Per Hour: 55% of Journeyperson's rate Supplemental Benefit Per Hour: $27.27 Effective Period: 3/17/2016 - 6/30/2016 Wage Rate Per Hour: 55% of Journeyperson's rate Supplemental Benefit Per Hour: $28.76 Elevator Service/Modernization Mechanic (Third Year) Effective Period: 7/1/2015 - 3/16/2016 Wage Rate Per Hour: 65% of Journeyperson's rate Supplemental Benefit Per Hour: $28.08 Effective Period: 3/17/2016 - 6/30/2016 Wage Rate Per Hour: 65% of Journeyperson's rate Supplemental Benefit Per Hour: $29.60 Elevator Service/Modernization Mechanic (Fourth Year) Effective Period: 7/1/2015 - 3/16/2016 Wage Rate Per Hour: 75% of Journeyperson's rate Supplemental Benefit Per Hour: $28.89 Effective Period: 3/17/2016 - 6/30/2016 Wage Rate Per Hour: 75% of Journeyperson's rate Supplemental Benefit Per Hour: $30.43 (Local #1) ENGINEER‌ (Ratio of Apprentice to Journeyperson: 1 to 1, 1 to 5) Engineer - First Year Effective Period: 7/1/2015 - 6/30/2016 Wage Rate per Hour: $23.68 Supplemental Benefit Rate per Hour: $22.55 Engineer - Second Year Effective Period: 7/1/2015 - 6/30/2016 Wage Rate per Hour: $29.60 Supplemental Benefit Rate per Hour: $22.55 Engineer - Third Year Effective Period: 7/1/2015 - 6/30/2016 Wage Rate per Hour: $32.56 Supplemental Benefit Rate per Hour: $22.55 Engineer - Fourth Year Effective Period: 7/1/2015 - 6/30/2016 Wage Rate per Hour: $35.52 Supplemental Benefit Rate per Hour: $22.55 (Local #15) ENGINEER - OPERATING‌ (Ratio of Apprentice to Journeyperson: 1 to 1, 1 to 5) Operating Engineer - First Year Effective Period: 7/1/2015 - 6/30/2016 Wage Rate Per Hour 40% of Journeyperson's Rate Supplemental Benefit Per Hour: $20.15 Operating Engineer - Second Year Effective Period: 7/1/2015 - 6/30/2016 Wage Rate Per Hour: 50% of Journeyperson's Rate Supplemental Benefit Per Hour: $20.15 Operating Engineer - Third Year Effective Period: 7/1/2015 - 6/30/2016 Wage Rate Per Hour: 60% of Journeyperson's Rate Supplemental Benefit Per Hour: $20.15 (Local #14) FLOOR COVERER‌ (Ratio of Apprentice to Journeyperson: 1 to 1, 1 to 4) Floor Coverer (First Year) Effective Period: 7/1/2015 - 6/30/2016 Wage Rate Per Hour: 40% of Journeyperson's rate Supplemental Rate Per Hour: $31.14 Floor Coverer (Second Year) Effective Period: 7/1/2015 - 6/30/2016 Wage Rate Per Hour: 50% of Journeyperson's rate Supplemental Rate Per Hour: $31.14 Floor Coverer (Third Year) Effective Period: 7/1/2015 - 6/30/2016 Wage Rate Per Hour: 65% of Journeyperson's rate Supplemental Rate Per Hour: $31.14 Floor Coverer (Fourth Year) Effective Period: 7/1/2015 - 6/30/2016 Wage Rate Per Hour: 80% of Journeyperson's rate Supplemental Rate Per Hour: $31.14 (Carpenters District Council) XXXXXXX‌ (Ratio of Apprentice to Journeyperson: 1 to 1, 1 to 3) Xxxxxxx (First Year) Effective Period: 7/1/2015 - 6/30/2016 Wage Rate Per Hour: 40% of Journeyperson's rate Supplemental Rate Per Hour: $13.64 Effective 11/1/2015 - Supplemental Rate Per Hour: $13.79 Xxxxxxx (Second Year) Effective Period: 7/1/2015 - 6/30/2016 Wage Rate Per Hour: 50% of Journeyperson's rate Supplemental Rate Per Hour: $22.97 Effective 11/1/2015 - Supplemental Rate Per Hour: $23.13 Xxxxxxx (Third Year) Effective Period: 7/1/2015 - 6/30/2016 Wage Rate Per Hour: 60% of Journeyperson's rate Supplemental Rate Per Hour: $25.87 Effective 11/1/2015 - Supplemental Rate Per Hour: $26.03 Xxxxxxx (Fourth Year) Effective Period: 7/1/2015 - 6/30/2016 Wage Rate Per Hour: 80% of Journeyperson's rate Supplemental Rate Per Hour: $31.04 Effective 11/1/2015 - Supplemental Rate Per Hour: $31.29 (Local #1281) HEAT & FROST INSULATOR‌ (Ratio of Apprentice to Journeyperson: 1 to 1, 1 to 4) Heat & Frost Insulator (First Year) Effective Period: 7/1/2015 - 6/30/2016 Wage and Supplemental Rate Per Hour: 40% of Journeyperson's rate Heat & Frost Insulator (Second Year) Effective Period: 7/1/2015 - 6/30/2016 Wage and Supplemental Rate Per Hour: 60% of Journeyperson's rate Heat & Frost Insulator (Third Year) Effective Period: 7/1/2015 - 6/30/2016 Wage and Supplemental Rate Per Hour: 70% of Journeyperson's rate Heat & Frost Insulator (Fourth Year) Effective Period: 7/1/2015 - 6/30/2016 Wage and Supplemental Rate Per Hour: 80% of Journeyperson's rate (Local #12) HOUSE WRECKER‌ (TOTAL DEMOLITION) (Ratio of Apprentice to Journeyperson: 1 to 1, 1 to 3) House Wrecker - First Year Effective Period: 7/1/2015 - 6/30/2016 Wage Rate per Hour: $21.17 Supplemental Benefit Rate per Hour: $17.33 House Wrecker - Second Year Effective Period: 7/1/2015 - 6/30/2016 Wage Rate per Hour: $22.32 Supplemental Benefit Rate per Hour: $17.33 House Wrecker - Third Year Effective Period: 7/1/2015 - 6/30/2016 Wage Rate per Hour: $23.97 Supplemental Benefit Rate per Hour: $17.33 House Wrecker - Fourth Year Effective Period: 7/1/2015 - 6/30/2016 Wage Rate per Hour: $26.53 Supplemental Benefit Rate per Hour: $17.33 (Xxxxx Tenders District Council) IRON WORKER - ORNAMENTAL‌ (Ratio of Apprentice to Journeyperson: 1 to 1, 1 to 4) Iron Worker (Ornamental) - 1st Ten Months Effective Period: 7/1/2015 - 6/30/2016 Wage Rate Per Hour: 50% of Journeyperson's rate Supplemental Rate Per Hour: $36.50 Iron Worker (Ornamental) - 11 -16 Months Effective Period: 7/1/2015 - 6/30/2016 Wage Rate Per Hour: 55% of Journeyperson's rate Supplemental Rate Per Hour: $37.62 Iron Worker (Ornamental) - 17 - 22 Months Effective Period: 7/1/2015 - 6/30/2016 Wage Rate Per Hour: 60% of Journeyperson's rate Supplemental Rate Per Hour: $38.73 Iron Worker (Ornamental) - 23 - 28 Months Effective Period: 7/1/2015 - 6/30/2016 Wage Rate Per Hour: 70% of Journeyperson's rate Supplemental Rate Per Hour: $40.97 Iron Worker (Ornamental) - 29 - 36 Months Effective Period: 7/1/2015 - 6/30/2016 Wage Rate Per Hour: 80% of Journeyperson's rate Supplemental Rate Per Hour: $43.20 (Local #580) IRON WORKER - STRUCTURAL‌ (Ratio of Apprentice to Journeyperson: 1 to 1, 1 to 6) Iron Worker (Structural) - 1st Six Months Effective Period: 7/1/2015 - 6/30/2016 Wage Rate per Hour: $25.48 Supplemental Benefit Rate per Hour: $46.83 Iron Worker (Structural) - 7- 18 Months Effective Period: 7/1/2015 - 6/30/2016 Wage Rate per Hour: $26.08 Supplemental Benefit Rate per Hour: $46.83 Iron Worker (Structural) - 19 - 36 months Effective Period: 7/1/2015 - 6/30/2016 Wage Rate per Hour: $26.68 Supplemental Benefit Rate per Hour: $46.83 (Local #40 and #361) LABORER (FOUNDATION, CONCRETE, EXCAVATING, STREET PIPE LAYER & COMMON)‌ (Ratio Apprentice to Journeyperson: 1 to 1, 1 to 3) Laborer (Foundation, Concrete, Excavating, Street Pipe Layer & Common) - First 1000 hours Effective Period: 7/1/2015 - 6/30/2016 Wage Rate Per Hour: 50% of Journeyperson's rate Supplemental Rate Per Hour: $36.53 Laborer (Foundation, Concrete, Excavating, Street Pipe Layer & Common) - Second 1000 hours Effective Period: 7/1/2015 - 6/30/2016 Wage Rate Per Hour: 60% of Journeyperson's rate Supplemental Rate Per Hour: $36.53 Laborer (Foundation, Concrete, Excavating, Street Pipe Layer & Common) - Third 1000 hours Effective Period: 7/1/2015 - 6/30/2016 Wage Rate Per Hour: 75% of Journeyperson's rate Supplemental Rate Per Hour: $36.53 Laborer (Foundation, Concrete, Excavating, Street Pipe Layer & Common) - Fourth 1000 hours Effective Period: 7/1/2015 - 6/30/2016 Wage Rate Per Hour: 90% of Journeyperson's rate Supplemental Rate Per Hour: $36.53 (Local #731) MARBLE MECHANICS‌ (Ratio of Apprentice to Journeyperson: 1 to 1, 1 to 4) Cutters & Setters - First 750 Hours Effective Period: 7/1/2015 - 6/30/2016 Wage and Supplemental Rate Per Hour: 50% of Journeyperson's rate NO BENEFITS PAID DURING THE FIRST TWO MONTHS (PROBATIONARY PERIOD) Cutters & Setters - Second 750 Hours Effective Period: 7/1/2015 - 6/30/2016 Wage and Supplemental Rate Per Hour: 55% of Journeyperson's rate Cutters & Setters - Third 750 Hours Effective Period: 7/1/2015 - 6/30/2016 Wage and Supplemental Rate Per Hour: 65% of Journeyperson's rate Cutters & Setters - Fourth 750 Hours Effective Period: 7/1/2015 - 6/30/2016 Wage and Supplemental Rate Per Hour: 75% of Journeyperson's rate Cutters & Setters - Fifth 750 Hours Effective Period: 7/1/2015 - 6/30/2016 Wage and Supplemental Rate Per Hour: 85% of Journeyperson's rate Cutters & Setters - Sixth 750 Hours Effective Period: 7/1/2015 - 6/30/2016 Wage and Supplemental Rate Per Hour: 95% of Journeyperson's rate Polishers & Finishers - First 750 Hours Effective Period: 7/1/2015 - 6/30/2016 Wage and Supplemental Rate Per Hour: 50% of Journeyperson's rate NO BENEFITS PAID DURING THE FIRST TWO MONTHS (PROBATIONARY PERIOD) Polishers & Finishers - Second 750 Hours Effective Period: 7/1/2015 - 6/30/2016 Wage and Supplemental Rate Per Hour: 60% of Journeyperson's rate Polishers & Finishers - Third 750 Hours Effective Period: 7/1/2015 - 6/30/2016 Wage and Supplemental Rate Per Hour: 75% of Journeyperson's rate Polishers & Finishers - Fourth 750 Hours Effective Period: 7/1/2015 - 6/30/2016 Wage and Supplemental Rate Per Hour: 90% of Journeyperson's rate (Local #7) XXXXX TENDER‌ (Ratio of Apprentice to Journeyperson: 1 to 1, 1 to 3) Xxxxx Xxxxxx - First Year Effective Period: 7/1/2015 - 6/30/2016 Wage Rate per Hour: $21.39 Supplemental Benefit Rate per Hour: $18.44 Xxxxx Xxxxxx - Second Year Effective Period: 7/1/2015 - 6/30/2016 Wage Rate per Hour: $22.54 Supplemental Benefit Rate per Hour: $18.44 Xxxxx Xxxxxx - Third Year Effective Period: 7/1/2015 - 6/30/2016 Wage Rate per Hour: $24.29 Supplemental Benefit Rate per Hour: $18.49 Xxxxx Xxxxxx - Fourth Year Effective Period: 7/1/2015 - 6/30/2016 Wage Rate per Hour: $26.95 Supplemental Benefit Rate per Hour: $18.49 (Local #79) METALLIC LATHER‌ (Ratio of Apprentice to Journeyperson: 1 to 1, 1 to 3) Metallic Lather (First Year -Called Prior to 6/29/11) Effective Period: 7/1/2015 - 6/30/2016 Wage Rate per Hour: $29.41 Supplemental Benefit Rate per Hour: $22.89 Metallic Lather (Second Year - Called Prior to 6/29/11) Effective Period: 7/1/2015 - 6/30/2016 Wage Rate per Hour: $34.01 Supplemental Benefit Rate per Hour: $24.54 Metallic Lather (Third Year - Called Prior to 6/29/11) Effective Period: 7/1/2015 - 6/30/2016 Wage Rate per Hour: $39.07 Supplemental Benefit Rate per Hour: $25.69 Metallic Lather (First Year -Called On Or After 6/29/11) Effective Period: 7/1/2015 - 6/30/2016 Wage Rate per Hour: $23.01 Supplemental Benefit Rate per Hour: $17.95 Metallic Lather (Second Year - Called On Or After 6/29/11) Effective Period: 7/1/2015 - 6/30/2016 Wage Rate per Hour: $28.11 Supplemental Benefit Rate per Hour: $17.95 Metallic Lather (Third Year - Called On Or After 6/29/11) Effective Period: 7/1/2015 - 6/30/2016 Wage Rate per Hour: $33.21 Supplemental Benefit Rate per Hour: $17.95 (Local #46) MILLWRIGHT‌ (Ratio of Apprentice to Journeyperson: 1 to 1, 1 to 4) Xxxxxxxxxx (First Year) Effective Period: 7/1/2015 - 6/30/2016 Wage Rate per Hour: $27.23 Supplemental Benefit Rate per Hour: $34.06 Xxxxxxxxxx (Second Year) Effective Period: 7/1/2015 - 6/30/2016 Wage Rate per Hour: $32.18 Supplemental Benefit Rate per Hour: $37.62 Xxxxxxxxxx (Third Year) Effective Period: 7/1/2015 - 6/30/2016 Wage Rate per Hour: $37.13 Supplemental Benefit Rate per Hour: $41.83 Xxxxxxxxxx (Fourth Year) Effective Period: 7/1/2015 - 6/30/2016 Wage Rate per Hour: $47.03 Supplemental Benefit Rate per Hour: $48.31 (Local #740) PAVER AND ROADBUILDER‌ (Ratio of Apprentice to Journeyperson: 1 to 1, 1 to 3) Paver and Roadbuilder - First Year (Minimum 1000 hours) Effective Period: 7/1/2015 - 6/30/2016 Wage Rate per Hour: $27.05 Supplemental Benefit Rate per Hour: $17.12 Paver and Roadbuilder - Second Year (Minimum 1000 hours) Effective Period: 7/1/2015 - 6/30/2016 Wage Rate per Hour: $28.69 Supplemental Benefit Rate per Hour: $17.12 (Local #1010) PAINTER‌ (Ratio of Apprentice to Journeyperson: 1 to 1, 1 to 3) Painter - Brush & Roller - First Year Effective Period: 7/1/2015 - 10/31/2015 Wage Rate per Hour: $15.80 Supplemental Benefit Rate per Hour: $11.88 Effective Period: 11/1/2015 - 6/30/2016 Wage Rate per Hour: $16.40 Supplemental Benefit Rate per Hour: $12.13 Painter - Brush & Roller - Second Year Effective Period: 7/1/2015 - 10/31/2015 Wage Rate per Hour: $19.75 Supplemental Benefit Rate per Hour: $15.73 Effective Period: 11/1/2015 - 6/30/2016 Wage Rate per Hour: $20.50 Supplemental Benefit Rate per Hour: $15.98 Painter - Brush & Roller - Third Year Effective Period: 7/1/2015 - 10/31/2015 Wage Rate per Hour: $23.70 Supplemental Benefit Rate per Hour: $18.64 Effective Period: 11/1/2015 - 6/30/2016 Wage Rate per Hour: $24.60 Supplemental Benefit Rate per Hour: $18.89 Painter - Brush & Roller - Fourth Year Effective Period: 7/1/2015 - 10/31/2015 Wage Rate per Hour: $31.60 Supplemental Benefit Rate per Hour: $24.02 Effective Period: 11/1/2015 - 6/30/2016 Wage Rate per Hour: $32.80 Supplemental Benefit Rate per Hour: $24.27 (District Council of Painters) PAINTER - STRUCTURAL STEEL‌ (Ratio of Apprentice to Journeyperson: 1 to 1, 1 to 3) Painters - Structural Steel (First Year) Effective Period: 7/1/2015 - 6/30/2016 Wage and Supplemental Rate Per Hour: 40% of Journeyperson's rate Painters - Structural Steel (Second Year) Effective Period: 7/1/2015 - 6/30/2016 Wage and Supplemental Rate Per Hour: 60% of Journeyperson's rate Painters - Structural Steel (Third Year) Effective Period: 7/1/2015 - 6/30/2016 Wage and Supplemental Rate Per Hour: 80% of Journeyperson's rate (Local #806) PLASTERER‌ (Ratio of Apprentice to Journeyperson: 1 to 1, 1 to 3) Plasterer - First Year: 1st Six Months Effective Period: 7/1/2015 - 6/30/2016 Wage Rate Per Hour: 40% of Journeyperson's rate Supplemental Rate Per Hour: $15.76

  • General Project Description 2. Substation location.

  • Contract Description The Description and Location of the Contract and related project(s) are as follows.

  • General specifications 6.1.1. A vehicle and its electrical/electronic system(s) or ESA(s) shall be so designed, constructed and fitted as to enable the vehicle, in normal conditions of use, to comply with the requirements of this Regulation.

  • Property Description A document prepared as an exhibit for the conveyance of a property interest, reflecting a boundary survey, signed and sealed by a Registered Professional Land Surveyor (RPLS), attached to an acquisition deed as Exhibit A, and consists of the following two (2) parts:

  • Construction Progress Schedule A schedule indicating proposed activity sequences and durations, milestone dates for receipt and approval of pertinent information, preparation, submittal, and processing of Shop Drawings and Samples, delivery of materials or equipment requiring long-lead time procurement, and proposed date(s) of Material Completion and Occupancy and Final Completion. The schedule will be developed to represent the sixteen or seventeen CSI Specification Divisions. It shall have a minimum number of activities as required to adequately represent to Owner the complete scope of work and define the Project’s critical path and associated activities. If the Project is to be phased, then each individual Phase should be identified from start through completion of the overall Project and should be individually scheduled and described, including any Owner’s occupancy requirements and showing portions of the Project having occupancy priority. The format of the schedule will have dependencies indicated on a monthly grid identifying milestone dates such as construction start, phase construction, structural top out, dry-in, rough-in completion, metal stud and drywall completion, equipment installation, systems operational, Material Completion and Occupancy Date, final inspection dates, Punchlist, and Final Completion date.

  • Work Description T-804 Opening Roads - Removal of closure devices, cleaning ditches, removing berms, and blading the traveled-way T-811 Closing Roads - Entrance treatment for 150' cross-rip; debris block (slash, earth, berm, rocks, etc.) + seed + water bar T-811 Closing Roads - Water bar frequency per BMPs for remainder of road T-811 Closing Roads - Engineering Rep. or Construction Inspector must be notified prior to performing closeout NFSR Road No. Lane Width & Maintenance Level Mile Marker Begin End 76L Single Lane / Level 2 76 0.00 Ending 0.48

Time is Money Join Law Insider Premium to draft better contracts faster.