SURVEY WORK Sample Clauses

SURVEY WORK. (1) The Owner will cause all lots to be marked in accordance with good surveying practice and keep all stakes and monuments shown on the plan in place and replace all missing stakes and monuments before the roads and services in the subdivision are assumed by the Town.
AutoNDA by SimpleDocs
SURVEY WORK. The required survey work is the responsibility of the Contractor.
SURVEY WORK a) CGM will provide the proposed borehole location plan of all the areas to be covered under exploration and location (on plan & Field) of minimum two bench marks with RL and co-ordinates within close proximity of area of Exploration.
SURVEY WORK. (1) The Owner will keep all stakes and monuments shown on the plan in place and replace all missing stakes and monuments before the roads and services in the plan are assumed by the Town.

Related to SURVEY WORK

  • Day Work (a) The normal work week shall be thirty-seven and one-half (37½) hours and the normal work day shall be seven and one-half (7½) consecutive hours, exclusive of a meal period, between the hours of 6:00 a.m. and 6:00 p.m. The normal work week shall be Monday to Friday inclusive.

  • Dirty Work Where an employee and their supervisor agree that work (other than ship repair work) is of an unusually dirty or offensive nature, the employee shall be entitled to 43 cents per hour extra. Where an employee and their supervisor agree that certain ship repair work is of an unusually dirty or offensive nature, the employee shall be entitled to 58 cents per hour extra.

  • Drawings and Specifications at the Project Site The Contractor shall keep at the Site at least one copy of the Contract Documents and Change Orders, all in good order and available to the Design Professional and to his representatives.

  • Project Work PURCHASER shall complete the following projects in accordance with the specifications provided in Exhibits B, C, D, E, and F and written instructions from STATE. Project locations are shown on Exhibit A unless otherwise described. PURCHASER shall furnish all material unless otherwise specified.

  • THE WORK The Work comprises the completed construction required by the Contract Documents and includes all labor necessary to produce such construction, and all materials and equipment incorporated or to be incorporated in such construction.

  • Construction Work The regulation at 41 C.F.R. § 60-1.3 defines “construction work” as the construction, rehabilitation, alteration, conversion, extension, demolition or repair of buildings, highways, or other changes or improvements to real property, including facilities providing utility services. The term also includes the supervision, inspection, and other onsite functions incidental to the actual construction.

  • Site Work An expansion of the Connecting Transmission Owner’s Boonville Station is required to accommodate the CTOIFs. The southern corner of the fence line will be expanded out by approximately 3,200 square feet. The Connecting Transmission Owner already owns the property required for the expansion. Approximately 120 feet of the existing fencing will need to be removed and approximately 150 feet of new fencing added.

  • Drawings and Specifications 9.1 A complete list of all Drawings that form a part of the Contract Documents are to be found as an index on the Drawings themselves, and/or may be provided to Developer and/or in the Table of Contents.

  • Warranty Work Failure by the Contractor to take corrective action within twenty four (24) hours after personal or telephonic notice by the County's OC Public Works on items affecting essential use of the facility, safety or the preservation of property, and within ten (10) calendar days following written notice on other deficiencies, will result in the County taking whatever corrective action it deems necessary. All costs resulting from such action by the County will be claimed against Contractor or, if necessary, the Contractor's Performance Bond.

  • Demolition work (a) As of 1 October 2020 where Employees are directly performing demolition works that would require a demolition permit that allows the performance of such work, they will receive the amount of $8.35 per hour or the site allowance, whichever is the greater. This allowance will be adjusted annually in accordance with CPI (All Groups, Melbourne) movements measured in the twelve month period ending the previous December quarter effective as of 1 March 2021, rounded to the nearest 5 cents.