Survey Mapping Sample Clauses

Survey Mapping. Survey mapping shall be provided in the form of hard copies to a scale of 1:500 as well as a magnetic medium in a format assessable by Microstation and AutoCAD (.dwg and/or .dxf format) on a CD.
AutoNDA by SimpleDocs
Survey Mapping. Consultant shall: • Provide Supplemental Topographic Survey Data to locate existing utilities, curb, gutter, sidewalks, ramps, driveways, walls, grade breaks and match points. 3D coordinates will be generated for all topographic data. • Perform Boundary Survey. • Research and obtain documentation of existing easements and right-of-way required to determine ownership along with use to author additional legal descriptions for right-of-way acquisition and securing temporary and permanent easements. • Survey the othole areas performed in Task 1.6.
Survey Mapping. Survey Mapping shall include: • Topographic Survey. The consultant, using organic staff or sub-consultants shall prepare a topographic survey base map of the entire project area. Base map is to include at a minimum ROW’s, property lines, easements and ownerships as well as all salient and underground physical features, topography, drainage and storm features, utility features (including invert information), all 2” plus caliber trees with both location and type of tree, among other items. The survey shall be of such accuracy to support engineering design work. The topographic survey shall generally include 11 acres from the rights-of-way opposite the park along 7th St, 9th Ave, 9th St, and 10th Ave. While Survey Mapping shall be included as a task within the proposed cost, no formal deliverables are associated with this task. The final electronic survey shall be supplied to the City for reference purposes only.

Related to Survey Mapping

  • Survey Buyer may obtain a survey of the Property before the Closing to assure that there are no defects, encroachments, overlaps, boundary line or acreage disputes, or other such matters, that would be disclosed by a survey ("Survey Problems"). The cost of the survey shall be paid by the Buyer. Not later than business days prior to the Closing, Buyer shall notify Seller of any Survey Problems which shall be deemed to be a defect in the title to the Property. Seller shall be required to remedy such defects within business days and prior to the Closing. If Seller does not or cannot remedy any such defect(s), Buyer shall have the option of canceling this Agreement, in which case the Xxxxxxx Money shall be returned to Buyer.

  • Surveys Each Borrower shall submit the Ship owned by it regularly to all periodical or other surveys which may be required for classification purposes and, if so required by the Security Trustee provide the Security Trustee, with copies of all survey reports.

  • Surveying Survey services including surveys indicating topography, cross sections, spot elevations, aerials, research of legal descriptions, easements and other right of way documents.

  • Title Examination Within thirty (30) days after Purchaser’s exercise of the Option, Purchaser shall have the right to obtain, at Purchaser’s expense, a current survey of the Property (the “Updated Survey”) and an ALTA Title Commitment for the Property from a title company acceptable to Purchaser (the “Title Company”), setting forth the status of title to the Property, and showing all liens, claims, encumbrances, reservations, restrictions and other matters, if any, relating to the Property (the “Title Commitment”), including legible copies of all encumbrances, restrictive covenants and other documents evidencing exceptions to said Title Commitment (the “Exception Documents”). If the Title Commitment and/or Updated Survey reveals any exception(s) to title to which Purchaser objects (a “Title Objection”) and is(are) not either (i) listed as title exceptions in the title insurance policy and/or survey obtained by Seller in connection with the closing of the Mezzanine Loan and/or (ii) permitted by this Agreement (collectively, the “Permitted Encumbrances”), Purchaser may notify Seller in writing that it would like Seller to cure or remove such Title Objections. Seller shall have the right, but not the obligation (except as set forth below), to remedy or cure any such Title Objection(s) during the twenty (20) day period following Seller’s receipt thereof (the “Cure Period”). Purchaser shall have the continuing right to have such title examination and Title Commitments updated from time to time, and to obtain updates to the Survey, and to give Seller written notice of any Title Objections appearing of record, or otherwise created, after the effective date of the initial Title Commitment and being revealed by any title examination, Survey or investigation of the Property, and Purchaser shall be entitled to object (in the same manner as set forth hereinabove) to matters shown by the updated Title Commitments or updated Survey or investigations. Seller shall have the right, but not the obligation (except as set forth below), to remedy those Title Objections identified by Purchaser to the satisfaction of Purchaser within twenty (20) days after Purchaser’s notice. If any of the Title Objections are not so cured or remedied, or provision satisfactory to Purchaser made therefor, prior to any closing date selected by Purchaser, then Purchaser, at its election, shall have the right and option to either: (a) accept title to the Property subject to said uncured Title Objections that Purchaser elects to accept, and any Title Objection accepted by Purchaser in writing shall become part of the Permitted Encumbrances; or (b) terminate this Agreement by written notice to Seller, in which event, immediately upon receipt of said notice, this Agreement shall terminate, be null and void and of no further force or effect. Notwithstanding the foregoing, Seller, at Seller’s sole cost and expense, shall be obligated to cure or remove at or before Closing all mortgages, deeds of trust, deeds to secure debt, judgments liens, mechanics and materialman’s liens, and other monetary liens against the Property, whether or not Purchaser objects thereto, and Purchaser shall credit the cost to cure, satisfy, release and remove such matters against the Purchase Price provided the same is actually paid by Purchaser or Title Company on Seller’s behalf. In addition, Seller shall not allow any easements, liens, leases, licenses, permits or other encumbrances to be placed on or granted with respect to the Property, nor shall Seller convey any rights in the Property, without the prior written consent of Purchaser, except to the extent expressly permitted, or consented to in writing by Purchaser under the Mezzanine Loan Documents. If any such prohibited easements, liens, leases, licenses, permits or other encumbrances arise after the Effective Date, notwithstanding any other term or provision of this Agreement to the contrary, Seller shall, at its sole cost and expense, cure, satisfy, release and remove such matters prior to Closing; provided, however, that any easements or encumbrances that are taken by eminent domain shall be governed by the terms of Section 5 immediately below.

  • Title Report If no Additional Mortgage Policy is required with respect to such Additional Mortgaged Property, a title report issued by the Title Company with respect thereto, dated not more than 30 days prior to the date such Additional Mortgage is to be recorded and satisfactory in form and substance to Administrative Agent;

  • Mapping Mapping by joint DHB/PSA teams at each DHB to match the work of the clerical and administration workforce at the DHB to national role profiles5.

  • Topographic Survey 3.1 Notify affected property owners of pending survey.

  • Geotechnical Engineer « »« » « » « » « » « »

  • Geotechnical 19 The A/E as required shall review past pavement, soil 20 and geology investigations, discuss past findings as 21 impacting the subject roadway project, and independently 22 perform design-needed geotechnical services including 23 development and implementation of a field investigation plan 24 involving any field data collection as deemed necessary, 25 development of a laboratory testing program to conduct soils 26 surface and subsurface characterization tests as applicable 1 to the needs of the project, development of seismic analysis 2 and design criteria in accordance with code requirements, 3 development of pavement condition studies to provide 4 recommendations concerning life cycle costs and 5 rehabilitation/reconstruction methods, and recommendations 6 for the design of foundations, embankment and excavation 7 procedures, settlement analysis, lateral, active, and passive 8 earth pressures, de-watering, landslide mapping, slope 9 stabilization, soil corrosion, erosion, sedimentation control 10 and other applicable design criteria as deemed necessary.

  • EU SURVEY 5.1. The participant shall complete and submit the online EU Survey after the mobility abroad within 30 calendar days upon receipt of the invitation to complete it.

Time is Money Join Law Insider Premium to draft better contracts faster.