Supply Characteristics At The Connection Point Sample Clauses

Supply Characteristics At The Connection Point. Energisation Date [Prompt: insert planned energisation date] Voltage 230 / 400 volts Frequency 50 Hertz Number of Phases 3 Maximum Capacity Maximum Import Capacity (kVA) [Prompt: insert kVA capacity value in kVA] Maximum Export Capacity (kVA) [Prompt: insert kVA capacity value in kVA or “Not applicable”]
AutoNDA by SimpleDocs

Related to Supply Characteristics At The Connection Point

  • Interconnection Points 8.5.1 The IP of a Party (“Receiving Party”) for Measured Internet Traffic delivered to the Receiving Party by the other Party shall be the same as the IP of the Receiving Party for Reciprocal Compensation Traffic under Section 7.1 above.

  • Interconnection Point The Service Provider is responsible for connecting to the LFC Network at the Interconnection Point. The LFC may only change an Interconnection Point if a change is necessary to protect the security or integrity of that Interconnection Point in order to maintain the continuity of supply of the Wholesale Services. In the event of any such change:

  • Additional Service Characteristics 3.12 The technical specification of the Bitstream 2a Service is set out in Appendix B.

  • Technical Characteristics The Participating Generator has provided to the CAISO in Schedule 1 the required information regarding the capacity and operating characteristics of each of the Generating Units listed in that schedule. Pursuant to Sections 8.9 and 8.10 of the CAISO Tariff, the CAISO may verify, inspect and test the capacity and operating characteristics provided in Schedule 1.

  • DELIVERY, STORAGE, AND HANDLING The Contractor shall be responsible to inspect all components on delivery to ensure that no damage occurred during shipping or handling for furnish and installation projects. For equipment only purchases, the ordering entity shall be responsible to inspect all components on delivery. Materials must be stored in original undamaged packaging in such a manner to ensure proper ventilation and drainage, and to protect against damage, weather, vandalism, and theft until ready for installation.

  • Demarcation Point 98.1 CenturyLink will designate the point of demarcation between CenturyLink’s equipment and CLEC’s collocated equipment, which point of demarcation shall be in or adjacent to its Collocation Space unless otherwise mutually agreed to by the Parties. At CLEC's request, CenturyLink will identify the location(s) of other possible demarcation points available to CLEC, and CLEC will designate from these location(s) the point(s) of demarcation between its collocated equipment and CenturyLink's equipment. CenturyLink will use its best efforts to identify the closest demarcation point to CLEC's equipment that is available.

  • Under-Frequency and Over Frequency Conditions The New York State Transmission System is designed to automatically activate a load- shed program as required by the NPCC in the event of an under-frequency system disturbance. Developer shall implement under-frequency and over-frequency relay set points for the Large Generating Facility as required by the NPCC to ensure “ride through” capability of the New York State Transmission System. Large Generating Facility response to frequency deviations of predetermined magnitudes, both under-frequency and over-frequency deviations, shall be studied and coordinated with the NYISO and Connecting Transmission Owner in accordance with Good Utility Practice. The term “ride through” as used herein shall mean the ability of a Generating Facility to stay connected to and synchronized with the New York State Transmission System during system disturbances within a range of under-frequency and over-frequency conditions, in accordance with Good Utility Practice and with NPCC Regional Reliability Reference Directory # 12, or its successor.

  • Minimum Customer Support Requirements for TIPS Sales Vendor shall provide timely and commercially reasonable support for TIPS Sales or as agreed to in the applicable Supplemental Agreement.

  • Reactive Power and Primary Frequency Response 9.6.1 Power Factor Design Criteria

  • Delivery Points ‌ Project water made available to the Agency pursuant to Article 6 shall be delivered to the Agency by the State at the delivery structures established in accordance with Article 10.