Summary of the Extraction and Collection System. Fifteen (15) extraction xxxxx and well vaults. Xxxxx may be added/abandoned in the future as the need arises - One (1) booster pump - Two (2) air compressors, one (1) receiving tank, and appurtenances - One (1) collection tank and appurtenances - Water discharge manifolds, compressed air lines, and appurtenances - Seep line, totalizer, and appurtenances - Air lines, piping
AutoNDA by SimpleDocs

Related to Summary of the Extraction and Collection System

  • Unbundled Sub-Loop Concentration System (USLC 2.9.1 Where facilities permit and where necessary to comply with an effective Commission order, BellSouth will provide <<customer_name>> with the ability to concentrate its sub-loops onto multiple DS1s back to the BellSouth Central Office. The DS1s will then be terminated into <<customer_name>>’s collocation space. TR-008 and TR303 interface standards are available.

  • Distribution System The Transmission Provider's facilities and equipment used to transmit electricity to ultimate usage points such as homes and industries directly from nearby generators or from interchanges with higher voltage transmission networks which transport bulk power over longer distances. The voltage levels at which Distribution Systems operate differ among areas. Distribution Upgrades – The additions, modifications, and upgrades to the Transmission Provider's Distribution System at or beyond the Point of Interconnection to facilitate interconnection of the Small Generating Facility and render the transmission service necessary to effect the Interconnection Customer's wholesale sale of electricity in interstate commerce. Distribution Upgrades do not include Interconnection Facilities.

  • Supervisory Control and Data Acquisition (SCADA) Capability The wind plant shall provide SCADA capability to transmit data and receive instructions from the ISO and/or the Connecting Transmission Owner for the Transmission District to which the wind generating plant will be interconnected, as applicable, to protect system reliability. The Connecting Transmission Owner for the Transmission District to which the wind generating plant will be interconnected and the wind plant Developer shall determine what SCADA information is essential for the proposed wind plant, taking into account the size of the plant and its characteristics, location, and importance in maintaining generation resource adequacy and transmission system reliability in its area.

  • Irrigation Systems The Project Area either has no irrigation system or a low-volume drip irrigation system. If a watering system is used, it is a drip irrigation system equipped with a filter, pressure regulator and emitters rated at twenty (20) gallons per hour (gph) or less. The system is maintained free of leaks and malfunctions. No spray irrigation is applied to the Project Area, including spray from irrigation systems adjacent to the Project Area.

  • Disaster Recovery PFPC shall enter into and shall maintain in effect with appropriate parties one or more agreements making reasonable provisions for emergency use of electronic data processing equipment to the extent appropriate equipment is available. In the event of equipment failures, PFPC shall, at no additional expense to the Fund, take reasonable steps to minimize service interruptions. PFPC shall have no liability with respect to the loss of data or service interruptions caused by equipment failure, provided such loss or interruption is not caused by PFPC's own willful misfeasance, bad faith, gross negligence or reckless disregard of its duties or obligations under this Agreement.

  • Network Interconnection Architecture Each Party will plan, design, construct and maintain the facilities within their respective systems as are necessary and proper for the provision of traffic covered by this Agreement. These facilities include but are not limited to, a sufficient number of trunks to the point of interconnection with the tandem company, and sufficient interoffice and interexchange facilities and trunks between its own central offices to adequately handle traffic between all central offices within the service areas at P.01 grade of service or better. The provisioning and engineering of such services and facilities will comply with generally accepted industry methods and practices, and will observe the rules and regulations of the lawfully established tariffs applicable to the services provided.

  • Disaster Services In the event of a local, state, or federal emergency, including natural, man- made, criminal, terrorist, and/or bioterrorism events, declared as a state disaster by the Governor, or a federal disaster by the appropriate federal official, Grantee may be called upon to assist the System Agency in providing the following services:

  • Data Collection Some downloaded software included in the Materials may generate and collect information about the software and usage and transmit it to Intel to help improve Intel’s products and services. This collected information may include product name, product version, time of event collection, license type, support type, installation status, hardware and software performance, and use. 9.

  • Trunk Group Architecture and Traffic Routing The Parties shall jointly engineer and configure Local/IntraLATA Trunks over the physical Interconnection arrangements as follows:

  • Cost Responsibility for Interconnection Facilities and Distribution Upgrades 4.1 Interconnection Facilities 4.2 Distribution Upgrades