Summary of Requirements Sample Clauses

Summary of Requirements. Every Vendor (except GVR Approved Caterers):
AutoNDA by SimpleDocs
Summary of Requirements. The Contractor shall furnish all labor, materials, tools, and equipment necessary to complete the scope of work. All products used by the Contractor shall comply with all laws and regulations, codes and industry standards for the productsintended uses and shall be used in accordance with manufacturer recommendations. The Contractor will be responsible for the protection of all items and surfaces not scheduled to be worked on, and these area must be kept clean throughout the project. These areas include, but are not limited to window, walkways, doors, benches, vehicles, and plant, and tree material. The Contractor shall be responsible for repairing, at the Contractor’s expense, any damage that result from the work. All work performed, method and equipment used shall be in conformance with the prevailing State and Federal Occupational Safety and Health Act. Cost from delays and losses due to operations not in conformance to these acts, specifications, or stoppages by OSHA inspectors or the designated representative because of non-conformance shall be solely borne by the Contractor. The Contractor shall be solely responsible for the protection and safety of the public and use appropriate means to ensure that the District’s employees and the public are safe during the project. The Contractor shall fully guarantee all work, materials and parts furnished and installed for one full year after completion. Defects shall be replaced or repaired at the Contractor's expense. The fire station is open 24/7 and all work is to be performed in a way that emergency vehicle movement is not disturbed and impact to business traffic is minimized. Close coordination with the District’s project lead will be required to plan for alternative apparatus placement and/or traffic flow during the worked preformed. The Contractor shall be responsible for site clean-up daily after work has been performed and upon completion of the project. Removal of all debris associated with the project at the site shall be in accordance with any local, state, and federal regulations. All clean-up performed shall ensure the property is presentable and fully clean before the work is completed. All ladders and stacked tools and equipment stored properly each evening in an evening in and acceptable safe location determined by the on-duty Battalion Chief.
Summary of Requirements. APUC on behalf of City of Glasgow College and Xxxxxxx Xxxxxx College are seeking to appoint a supplier to provide Manned Security Services to the following locations: City of Glasgow College Hourly Requirements Riverside Student Accommodation, 00 Xxxxxxx Xxxxxx, Xxxxxxx, to commence on 1st August 2016 for a period of 3 years covering:  Monday – Friday 20:00 – 08:00  Saturday and Sunday 19:00 – 08:00 St Luke’s Accommodation, St Luke’s Terrace, Glasgow, to commence on 1st September 2016 for a period of 2 years and 11 months covering:  Monday – Friday 21:00 – 08:15  Saturday 15:00 – 08:15 on the Sunday morning (split over two shifts)  Sunday 08:00 – 15:00 and 21:45 – 08:15 Xxxxxxx Xxxxxx College Hourly Requirements Easterhouse Campus, 0000 Xxxxxxxxxxx Xxxx, Glasgow, to commence on 1st August 2016 for a period of 3 years covering:  Monday – Friday 16:00 – 09:30  Saturday and Sunday 07:00 – 07:00 (24 hours) Haghill Campus, 0 Xxxxxxx Xxxx, Xxxxxxx, to commence on 1st August 2016 for a period of 3 years covering:  Monday – Friday 16:00 – 09:30  Saturday and Sunday 07:00 – 07:00 (24 hours)
Summary of Requirements. By executing this Agreement, Subrecipient hereby agrees that it shall comply with all terms and conditions set forth in this Agreement, which includes all guidance, regulations and requirements (collectively, “Requirements”) of the Federal awarding agency and CalOES that are applicable to a recipient and/or subrecipient of a Federal award or grant. Such Requirements are set forth in the following documents and incorporated herein by this reference: (1) Department of Homeland Security FY 2019 Homeland Security Grant Program Notice of Funding Opportunity (“DHS NOFO”), (2) FY 2019 DHS Standard Terms and Conditions (“DHS Standard Conditions”) (Exhibit A), (3) FEMA Information Bulletins (“IB”), (4) CalOES 2019 Homeland Security Grant Program California Supplement to the Federal Notice of Funding Opportunity (“CalOES Supplement”), (5) CalOES 2019 Standard Assurances for All CalOES Federal Grant Programs (“CalOES Assurances”) (Exhibit B), (6) CalOES Grant Management Memos (“GMM”), and (7) the cost principles, uniform administrative requirements and audit requirements for federal grant programs as housed in Title 2, Part 200 of the CFR and in updates issued by the Office of Management and Budget (“OMB”) on http:///xxx.xxxxxxxxxx.xxx/xxx/. Subrecipient hereby certifies that it has the institutional, managerial and financial capability to ensure proper planning, management and completion of its projects being funded by the Subaward (Exhibit C).
Summary of Requirements. 8 Employees who attain the required level of achievement under this plan 9 will receive the corresponding level of additional compensation as indicated in this 10 section. Incentive pay is for the specified level only; levels do not compound An 11 employee must qualify under the “Requirement Summary” to qualify for additional 12 “Bachelor’s Degree” pay. LEVEL DPSST % ABOVE BASE HOURLY WAGE REQUIREMENT SUMMARY* Bachelor’s Degree % Above Base Hourly Wage** I Total of 2.5% DPPST Pay  Completion of 12 to 18 months initial probation as applicable  Basic DPSST certification Total of 1% Bachelor’s Degree Pay II Total of 5% DPSST Pay  12 months service as an MCSO Deputy Sheriff following completion of initial probation of 12 to 18 months as applicable  Intermediate DPSST certification Total of 2% Bachelor’s Degree Pay III Total of 10% DPSST Pay Same as Level II plus:  Advanced DPSST certification Total of 3% Bachelor’s Degree Pay 14 *The above requirements for DPSST and Bachelor’s Degree Incentive pay may be 15 waived or reduced at the Sheriff’s discretion for lateral hires from other law 16 enforcement agencies. 1 **A Bachelor’s degree must be from an accredited college or university. Bachelor’s
Summary of Requirements. Employees who attain the required level of 7 achievement under this plan will receive the corresponding level of additional 8 compensation as indicated in this section. Incentive pay is for the specified level 9 only; levels do not compound. Specific provisions later in this article supersede any 10 conflicting or inconsistent provisions of the following summary: 11 12 LEVEL % ABOVE BASE REQUIREMENT SUMMARY 13 HOURLY WAGE 15 I 2.5% • 18 months service as an MCSO 16 Deputy Sheriff 17 • Basic DPSST Certificate to 30 18 months. 20 II 5% Same as Level I plus: 21 • Intermediate Certificate 23 III 10% Same as Level II plus: 24 • Advanced DPSST certificate. 1 ARTICLE 18 2 PROBATION AND TRIAL SERVICE PERIOD
Summary of Requirements. Unless otherwise instructed in this Contract, the Contractor is solely responsible for all requirements stated herein.
AutoNDA by SimpleDocs
Summary of Requirements. Employees who attain the required level of 7 achievement under this plan will receive the corresponding level of additional 8 compensation as indicated in this section. Incentive pay is for the specified level 9 only; levels do not compound. Specific provisions later in this article supersede any 10 conflicting or inconsistent provisions of the following summary: 11 12 Level % Above Base Requirement Summary 13 Hourly Wage
Summary of Requirements. The Contractor will collect information from Local Authorities (district, borough and Unitary Authorities, and Port Health Authorities in England and Wales), via a web-based collection tool, into a single database. The Contractor will clean the data to remove errors and undertake a detailed analysis of the data and produce an annual report for publication. This report will employ the same structure as that created for the survey providing data on the year 2008/2009, viewable at the web address above. Any improvements recommended by the Contractor shall be submitted for acceptance to the Authority prior to any changes being made. The Contractor will advise the Authority on any amendments to the web-based form, which will collect information for the survey for the subsequent financial year including the collection of data for LAPPC and LA-IPPC installations. An annual meeting will be held at the Authority’s London offices in September or October to discuss progress of the survey, report and the content of the survey. The Contractor is expected to send no more than two representatives to the meeting. Should this Contract be extended, this annual meeting shall be at the same time in subsequent years. A summary of all deliverables required from the Contractor is shown in Tables 1a and 1b. Table 1a: Deliverables required from the Contractor from 1st April 2011 to 29th February 2012
Summary of Requirements. Purpose This document is to notify suppliers on the CSSF 2018 Framework of upcoming potential requirements and to establish levels of competence and interest among suppliers. Project Title : CSSF Lebanon: Lebanese Armed Forces – National Security Assistance Programme Objectives of Project The potential forthcoming Tender under consideration includes the provision of ‘Train & Mentor’ type interventions in support of Border Security and Internal Security, delivered at a significant scale, in Lebanon.
Time is Money Join Law Insider Premium to draft better contracts faster.