Suitable Delivery Mechanisms for INNOQUA Training Modules Sample Clauses

Suitable Delivery Mechanisms for INNOQUA Training Modules. Table 5-1 below details suitable delivery mechanism for each of the five proposed INNOQUA Training Modules. ⮚ Module 1 - Wastewater Management Concepts and Systems Overview ⮚ Module 2 - The Necessity for Wastewater Treatment Systems ⮚ Module 3 - The Fundamentals of Water, Sanitation and Hygiene ⮚ Module 4 - Overview of the INNOQUA Solution ⮚ Module 5 - The INNOQUA Solution Technical Instruction Table 5-1 Suitable Delivery Mechanisms for INNOQUA Training Modules Module 1 Module 2 Module 3 Module 4 Module 5 Webinars ✓ ✓ ✓ ✓ ✓ Self-Administered Digital Instruction – E-Learning ✓ ✓ ✓ Instructor-led Classroom or Group Learning (Medium-Size <35) ✓ ✓ ✓ ✓ Instructor-led Classroom or Group Learning (Small-Size <15) ✓ ✓ ✓ ✓ ✓ Showcases and Demonstrations ✓ ✓ Self-Administered Structured Training ✓ ✓ ✓ Trainer Supported, Self-Administered Training ✓ ✓ ✓ Post-training Support ✓ ✓ ✓ ✓ ✓ 6 Training and Education Programme Delivery and Evaluation Schedule The full course content is currently (i.e. M24) under production and it is anticipated that the initial modules i.e. modules 1, 2, 3 will be available in M34. With draft Modules 4, 5 available after this time. The delivery of the INNOQUA Training and Education Programme will coincide principally with the installation and operation commencement of the demonstration and showcase sites which is likely to be in M34.
AutoNDA by SimpleDocs

Related to Suitable Delivery Mechanisms for INNOQUA Training Modules

  • Training Delivery Type Code -- Code Short Description Long Description (If Applicable) 01 Traditional Classroom (no technology)

  • DELIVERY: FOB DESTINATION, INSIDE DELIVERY, FREIGHT PAID Whenever possible, contractors should give the ordering entities 3 working days prior notice of any deliveries and/or installations. Furniture contractors will not be responsible for the removal/moving of existing furnishings unless requested by the ordering entity. Contractors should verify site readiness prior to delivery. All deliveries will be made during normal working hours unless otherwise arranged with the ordering entity. Contractor will communicate any scheduling delays and/or changes immediately. Agencies will not be responsible for any freight damage, concealed or otherwise.

  • Shipping must be Freight On Board Destination to the delivery location designated on the Customer purchase order The Contractor will retain title and control of all goods until delivery is completed and the Customer has accepted the delivery. All risk of transportation and all related charges are the responsibility of the Contractor. The Customer will notify the Contractor and H-GAC promptly of any damaged goods and will assist the Contractor in arranging for inspection. The Contractor must file all claims for visible or concealed damage. Unless otherwise stated in the Agreement, deliveries must consist only of new and unused merchandise.

  • Technical Standards Applicable to a Wind Generating Plant i. Low Voltage Ride-Through (LVRT) Capability A wind generating plant shall be able to remain online during voltage disturbances up to the time periods and associated voltage levels set forth in the standard below. The LVRT standard provides for a transition period standard and a post-transition period standard.

  • Quality- and Cost-Based Selection Except as ADB may otherwise agree, the Borrower shall apply quality- and cost-based selection for selecting and engaging consulting services.

  • Selection of Subcontractors, Procurement of Materials and Leasing of Equipment The contractor shall not discriminate on the grounds of race, color, religion, sex, national origin, age or disability in the selection and retention of subcontractors, including procurement of materials and leases of equipment. The contractor shall take all necessary and reasonable steps to ensure nondiscrimination in the administration of this contract.

  • Billing and Payment Procedure for Forest Products Delivered The State will compute and forward to Purchaser a billing statement of charges for forest products delivered during the billing period at the delivered rate shown in P- 028.2 clause. After receipt of the billing statement, Purchaser’s payment must be received by the Department of Natural Resources on or before the due date shown on the billing statement. Purchaser agrees to make payment, payable to the Department of Natural Resources. Failure to pay on time for forest products delivered is considered a breach of contract. Included with the billing statement will be a summary report for the billing period compiled by the State or their log and load reporting service. The State will adjust final xxxxxxxx to account for any State approved payment reductions. P-080 Payment Account Refund Advance payments made under P-045 or P-045.2 remaining on account above the value for the charges shall be returned to Purchaser within 30 days following the final report of charges. Refunds not made within the 30 day period will accrue interest at the interest rate, as established by WAC 000-000-000, computed on a daily basis until paid.

  • Required Procurement Procedures for Obtaining Goods and Services The Grantee shall provide maximum open competition when procuring goods and services related to the grant-assisted project in accordance with Section 287.057, Florida Statutes.

  • Updated Information Submission by Interconnection Customer The updated information submission by the Interconnection Customer, including manufacturer information, shall occur no later than one hundred eighty (180) Calendar Days prior to the Trial Operation. The Interconnection Customer shall submit a completed copy of the Electric Generating Unit data requirements contained in Appendix 1 to the LGIP. It shall also include any additional information provided to the Participating TO and the CAISO for the Interconnection Studies. Information in this submission shall be the most current Electric Generating Unit design or expected performance data. Information submitted for stability models shall be compatible with the Participating TO and CAISO standard models. If there is no compatible model, the Interconnection Customer will work with a consultant mutually agreed to by the Parties to develop and supply a standard model and associated information. If the Interconnection Customer's data is materially different from what was originally provided to the Participating TO and the CAISO for the Interconnection Studies, then the Participating TO and the CAISO will conduct appropriate studies pursuant to the LGIP to determine the impact on the Participating TO’s Transmission System and affected portions of the CAISO Controlled Grid based on the actual data submitted pursuant to this Article 24.3. The Interconnection Customer shall not begin Trial Operation until such studies are completed and all other requirements of this LGIA are satisfied.

  • Accessories, Spare Parts and Tools 1. In determining whether all the non-originating materials used in the production of a good undergo the applicable change in tariff classification or a specific manufacturing or processing operation set out in Annex 2, accessories, spare parts or tools delivered with the good that form part of the good's standard accessories, spare parts or tools, shall be disregarded, provided that:

Time is Money Join Law Insider Premium to draft better contracts faster.