Common use of Substantial Completion Clause in Contracts

Substantial Completion. 9.8.1 When the Contractor considers that the Work, or a designated portion thereof which has been accepted in writing to by the State, is substantially complete as defined in Subparagraph 8.1.3 of these General Conditions, the Contractor shall prepare for submission to the Architect a list of items to be completed or corrected. The failure to include any items on such list does not alter the responsibility of the Contractor to complete all Work in accordance with the Contract Documents. When the Architect on the basis of an inspection determines that the Work or designated portion thereof is substantially complete, he will then prepare a Certificate of Substantial Completion which shall establish the Date of Substantial Completion, shall state the responsibilities of the State and the Contractor for security, maintenance, heat, utilities, damage to the Work, and insurance, and shall fix the time, which shall not exceed thirty (30) days, within which the Contractor shall complete the items listed therein. Warranties required by the Contract Documents shall commence on the Date of Substantial Completion of the Work or designated portion thereof unless otherwise provided in the Certificate of Substantial Completion. The Certificate of Substantial Completion shall be submitted to the State and the Contractor for their written acceptance of the responsibilities assigned to them in such Certificate. The Work shall not be considered substantially complete prior to the receipt of approved O & M manuals and record drawings as required by paragraph 4.11 and as required elsewhere in the Contract Documents.

Appears in 152 contracts

Samples: Vermont Contract, Vermont Contract, Vermont Contract

AutoNDA by SimpleDocs

Substantial Completion. 9.8.1 10.6.1 When the Contractor considers that the Work, or a designated portion thereof which has been accepted in writing is acceptable to by the StateOwner, is substantially complete Substantially Complete as defined in Subparagraph 8.1.3 of these General Conditions, Article 9.1.3 the Contractor shall prepare for submission to the Architect Owner a list of items to be completed or corrected. The failure to include any items item on such list does not alter the responsibility of the Contractor to complete all Work in accordance with the Contract Documents. When the Architect Owner on the basis of an inspection determines that the Work or designated portion thereof is substantially completeSubstantially Complete, he the Owner will then prepare a Certificate of Substantial Completion which shall establish the Date of Substantial Completion, shall state the responsibilities of the State Owner and the Contractor for security, maintenance, heat, utilities, utilities and damage to the Work, and insurance, and shall fix the time, which shall not exceed thirty (30) days, time within which the Contractor shall complete the items listed therein. Warranties and Guarantees required by the Contract Documents shall commence on the Date of Substantial Completion of the Work or designated portion thereof unless otherwise provided in the Certificate of Substantial Completion. The Certificate of Substantial Completion shall be submitted to the State Owner and the Contractor for their written acceptance of the responsibilities assigned to them in such Certificate. The Work shall not be considered substantially complete prior to the receipt of approved O & M manuals and record drawings as required by paragraph 4.11 and as required elsewhere in the Contract Documents.

Appears in 1 contract

Samples: sanfordlab.org

AutoNDA by SimpleDocs

Substantial Completion. 9.8.1 When the Contractor considers that the Work, or a designated portion thereof which has been accepted in writing is acceptable to by the StateCity, is substantially complete as defined in Subparagraph 8.1.3 of these General Conditions8.1.3, the Contractor shall prepare for submission to the Architect Engineer a list of items to be completed or corrected. The failure to include any items on such list does not alter the responsibility of the Contractor to complete all Work in accordance with the Contract Documents. When the Architect Engineer on the basis of an inspection determines that the Work or designated portion thereof is substantially complete, he will then prepare a Certificate of Substantial Completion which shall establish the Date of Substantial Completion, shall state the responsibilities of the State City and the Contractor for security, maintenance, heat, utilities, damage to the Work, and insurance, and shall fix the time, which shall not exceed thirty (30) days, time within which the Contractor shall complete the items listed therein. Warranties required by the Contract Documents shall commence on the Date of Substantial Completion of the Work or designated portion thereof unless otherwise provided in the Certificate of Substantial Completion. The Certificate of Substantial Completion shall be submitted to the State City and the Contractor for their written acceptance of the responsibilities assigned to them in such Certificate. The Work shall not be considered substantially complete prior to the receipt of approved O & M manuals and record drawings as required by paragraph 4.11 and as required elsewhere in the Contract Documents.

Appears in 1 contract

Samples: Agreement