Submission of Shop Drawings Sample Clauses

Submission of Shop Drawings. Contractor shall submit Shop Drawings to Architect for review and approval in accordance with the acceptable schedule of Shop Drawings and Sample submittals. All submittals will be identified as Architect may require and in the number of copies specified in the Contract Documents. The data shown on the Shop Drawings will be complete with respect to quantities, dimensions, specified performance and design criteria, materials, and similar data to show Architect the services, materials, and equipment Contractor proposes to provide and to enable Architect to review and approve the information for the limited purposes required by subparagraph 10.19.5
AutoNDA by SimpleDocs
Submission of Shop Drawings. Contractor shall submit Shop Drawings to Architect for review and approval in accordance with the acceptable schedule of Shop Drawings and Sample submittals. All submittals will be identified as Architect may require and in the number of copies specified in the Contract Documents. The data shown on the Shop Drawings will be complete with respect to quantities, dimensions, specified performance and design criteria, materials, and similar data to show Architect the services, materials, and equipment Contractor proposes to provide and to enable Architect to review and approve the information for the limited purposes required by subparagraph 10.19.5 below. All shop drawings shall be submitted, transmitted, and collectively stored in an Electronic Format that is accessible to the manufacturer, vendor, supplier, subcontractor, General Contractor, Architect, Consultants, and the Owner.
Submission of Shop Drawings. The applicable Developer Party shall cause the applicable General Contractor to establish procedures for expediting the processing and approval of Shop Drawings for the applicable AF Unit. Such Developer Party shall cause the General Contractor to obtain and review all Shop Drawings in accordance with the schedule referred to in Section 8.3.7(b), and shall transmit to Authority for its information copies of those Shop Drawings that Authority shall request.

Related to Submission of Shop Drawings

  • Shop Drawings All drawings, prints, diagrams, illustrations, brochures, schedules, and other data that are prepared by Developer, a subcontractor, manufacturer, supplier, or distributor, that illustrate how specific portions of the Work shall be fabricated or installed.

  • Shop Drawings and Samples a. Record date of receipt of Samples and approved Shop Drawings.

  • The Drawings The Drawings are the graphic and pictorial portions of the Contract Documents showing the design, location and dimensions of the Work, generally including plans, elevations, sections, details, schedules and diagrams.

  • System Upgrade Facilities and System Deliverability Upgrades Connecting Transmission Owner shall design, procure, construct, install, and own the System Upgrade Facilities and System Deliverability Upgrades described in Appendix A hereto. The responsibility of the Developer for costs related to System Upgrade Facilities and System Deliverability Upgrades shall be determined in accordance with the provisions of Attachment S to the NYISO OATT.

  • Construction Drawings After approving the Additional Programming Information, Landlord shall cause the Architect and the Engineers to prepare and deliver to Tenant Construction Drawings that conform to the approved Space Plan and the approved Additional Programming Information. Such preparation and delivery shall occur within 15 business days after the later of Landlord’s approval of the Additional Programming Information or the mutual execution and delivery of this Agreement. Tenant shall approve or disapprove the Construction Drawings by notice to Landlord. If Tenant disapproves the Construction Drawings, Tenant’s notice of disapproval shall specify any revisions Tenant desires in the Construction Drawings. After receiving such notice of disapproval, Landlord shall cause the Architect and/or the Engineers to revise the Construction Drawings, taking into account the reasons for Tenant’s disapproval (provided, however, that Landlord shall not be required to cause the Architect or the Engineers to make any revision to the Construction Drawings that is inconsistent with the Landlord Requirements or that Landlord otherwise reasonably disapproves), and resubmit the Construction Drawings to Tenant for its approval. Such revision and resubmission shall occur within five (5) business days after the later of Landlord’s receipt of Tenant’s notice of disapproval or the mutual execution and delivery of this Agreement if such revision is not material, and within such longer period of time as may be reasonably necessary (but not more than 15 business days after the later of such receipt or such mutual execution and delivery) if such revision is material. Such procedure shall be repeated as necessary until Tenant has approved the Construction Drawings. The Construction Drawings approved by Landlord and Tenant are referred to in this Work Letter as the “Approved Construction Drawings”.

  • As-Built Drawings Within thirty (30) Days of the successful completion of the Acceptance Test, Seller shall provide for Company review a set of the proposed as‑built drawings for the Company-Owned Interconnection Facilities constructed by Seller (and/or its Contractors). Within thirty (30) Days of Company's receipt of the proposed as‑built drawings, Company shall provide Seller with either (i) its comments on the proposed as‑built drawings or (ii) notice of acceptance of the proposed as‑built drawings as final as‑built drawings. If Company provides comments on the proposed as‑built drawings, Seller shall incorporate such comments into a final set of as‑built drawings and provide such final as‑built drawings to Company within twenty (20) Days of Seller's receipt of Company's comments.