Subgrade Preparation. Prepare subgrade to receive surface course Material at locations as designated on-the-ground by the Forest Service on roads listed below. Prepare the subgrade by shaping the Roadbed to approximately the original cross-section and consistent with adjacent sections.
AutoNDA by SimpleDocs
Subgrade Preparation. Prepare subgrade to receive surface course Material at locations as designated on-the-ground by the Forest Service on roads listed below. Prepare the subgrade by ROAD MAINTENANCE REQUIREMENTS FS-2400-6T Contracts (6/06) FANNY BAY TIMBER SALE shaping the Roadbed to approximately the original cross-section and consistent with adjacent sections.
Subgrade Preparation. The contractor shall excavate the road widening to subgrade depth which is to be bladed true to line and grade and compacted to 95% SPD prior to the application of any granular base material. The unit price for subgrade preparation shall also include filling where required to bring subgrade to proper depth with dry compacted soil. Any deleterious or unsuitable material, including the asphalt, shall be disposed off- site. Any excess materials shall be disposed off-site at the contractor’s expense.
Subgrade Preparation a. Subgrade preparation shall be in accordance with plans and geotechnical report.
Subgrade Preparation. Prepare Subgrade to receive Surface Course Material at locations as designated on-the-ground by the Forest Service on roads listed below. Prepare the Subgrade by shaping the Roadbed to approximately the original cross-section and consistent with adjacent sections. 3.2 Furnish, haul and spread Material at locations designated on the ground by the Forest Service (FS). Compact the aggregate by operating spreading and hauling equipment over the full width of each layer of the aggregate, or by other methods as specified below. Road Number Type Material Finished Compacted Thickness Specified Total Quantity (Tons or cu.yds.) Compaction Method 1006 2” Base Crushed Aggregate 2” 15 tons N/A 3.3 Variations. The Purchaser will be required to furnish weight tickets to the FS for each load of commercially obtained crushed aggregate prior to the final inspection. For aggregate purchased from the government, a count of truck loads will be required in addition to finished depth checks for the placed and compacted aggregate. Widths and lengths will be as staked or from schedule. When it is mutually agreed that all or part of the Surface Course Material is not needed, the estimated cost of surfacing not placed shall be charged to the Timber Sale Account in accordance with BT8.31. Sale Name: Xxxxxx Hollow Page:147 F ROAD MAINTENANCE REQUIREMENTS FS-2400-6T Contracts (06/06) CT5.31# Special Provisions T-8310 Ditch Cleaning
Subgrade Preparation. Not Applicable
Subgrade Preparation. Prepare subgrade to receive surface course Material at locations as designated on-the-ground by the Forest Service on roads listed below. Prepare the subgrade by shaping the Roadbed to approximately the original cross-section and consistent with adjacent sections. Sale Name: Devon Creek Page 156b 3.2 Furnish and spread Material at spot locations designated on the ground by the Forest Service as follows. Road Number Road Name During Haul Type Material Quantity (C.Y./Tons) TEMP RD #1 TEMP RD #1 FDOT#4 Limerock 240 TONS TEMP RD #2 TEMP RD #2 FDOT#4 Limerock 240 TONS TEMP RD #3 TEMP RD #3 FDOT#4 Limerock 240 TONS
AutoNDA by SimpleDocs
Subgrade Preparation. Remove vegetation and other deletarious materials from the existing road surface. Shape the existing road surface to a smooth surface, with a 2% crown at the road centerline, conforming with Figure 1. Construct drain dips as shown in Figure 2 where directed by the Contracting Officer. Adjust depth of drain dips as necessary to avoid ponding of water on or adjacent to the road. Where joining to existing gravel-surfaced road segments, adjust slopes to gradually blend into adjacent road segments. Remove all surface rocks over 3” in diameter. Compact subgrade using roller compaction as specified below. Roller Compaction. Adjust the moisture content to a level suitable for compaction. Operate Rollers over the full width of the subgrade layer until visual displacement ceases, but not fewer than three complete passes. Fill depressions as necessary to provide a smooth and uniformly compacted subgrade surface. Use vibratory steel wheeled rollers equipped with amplitude and frequency controls with a minimum weight of 6 tons, specifically designed to compact the material on which it is used.
Subgrade Preparation. The subgrade area of the street right-of-way shall be cleared of brush, weeds, vegetation, grass and debris. All cleared and grubbed materials shall be satisfactorily disposed of. The existing grade shall be excavated to bearing soil as approved by the design engineer and approved by the City Engineer. The subgrade shall be compacted to a minimum density and be witnessed by the City inspector. Compaction tests may be required to be conducted at the discretion of the City to verify same. All subgrade preparation shall be completed in conformance with the Washington State Department of Transportation Standard Specifications.
Subgrade Preparation. The subgrade material exposed after excavation (or filling) to the design subgrade level shall be scarified to a depth of approximately 150mm and moisture conditioned to within ±2% of Standard Optimum Moisture Content, and then re-compacted to a minimum dry density of 98% Standard in accordance with AS1289 5.1.1, 5.4.1 or 5.7.1. Compaction testing of the subgrade is not required unless requested by the Superintendent. Following compaction of the subgrade and prior to the placement of the clay liner, the Contractor shall prepare the subgrade surface such that it is smooth and hard in preparation for proof rolling. The proof roll shall be conducted in the presence of the Superintendent with a 10 tonne equivalent smooth wheeled roller or loaded truck with an intensity of contact pressure on the rear wheels of not less than 6 tonne per metre, without visible deformation. Any soft or weak areas encountered during proof rolling that do not respond to further compaction shall be removed and replaced with suitable site material in layers not exceeding 250mm thickness (loose), and compacted and re-tested to the above criteria. Following rolling, the Superintendent shall inspect and approve the prepared surface prior to the clay liner being placed. The Superintendent shall satisfy himself that no deflection of the subgrade is visible during proof rolling, and may direct further rolling of the formation surface to be undertaken at the expense of the Contractor. The Contractor shall arrange for a detailed feature survey of the prepared surface to be undertaken by an independent licensed surveyor following the completion of proof rolling and prior to the placement of the clay liner.