Study Scope Sample Clauses

Study Scope. The scope of the SRIS, which is included in Appendix A, was approved by the NYISO Operating Committee on October 12, 2006.
AutoNDA by SimpleDocs
Study Scope. The scope of this study is limited to evaluating the project’s impact on the following four items as listed in Section 6.0 of Appendix 6 of Attachment Z: 6.1-Initial identification of circuit breaker short circuit capability limits; 6.2-Initial identification of thermal overload or voltage limit violations; 6.3- Initial review of grounding requirements and system protection; and, 6.4-Description and non-binding estimated cost of facilities required to interconnect the proposed Small Generator Facility and to address the identified short circuit and power flow issues. The scope of this study provides the results of: • Initial identification of thermal overload or voltage limit violations (steady state) for summer and winter peak loading conditions • Sensitivity study (steady state only) to assess the impact of the project during light load conditions • Analysis on models with and without the project, in order to evaluate the impact of the project on the bulk and local power network • Available 13.2kV system characteristics on a 100MVA base at each 13.2kV delivery point to each of the 3 customer service locations • Recommended interconnection configuration with a list of system upgrades required • Initial identification of circuit breaker short circuit capability limits • Initial review of system protection requirements to be included for the Company’s system and those at the generation facility/customer service points • List of system protection upgrades required Madison County LFGTE Interconnection Study rev11 21 2008.doc rev. Nov. 21, 2008 Service Agreement No. 1988 Interconnection Study: Madison County Landfill Gas to Energy 2 MVA Small Generating Facility
Study Scope. ☐Fill in as applicable to your study. LOCAL RESEARCH LOCATIONS (the sites where the MetroHealth PI will oversee the research): ☐Fill in as applicable to your study. This answer will typically be “The MetroHealth System”.
Study Scope. The objective of the Initial Study, 1st Year Look Back Study, and 5th Year Look Back Study (the “Studies”) shall be to assess the dollar value of any significant and adverse impact of the Project on the Community on the basis of traffic/transportation infrastructure. In determining such assessment the Studies shall consider the following: Potential Areas of Study
Study Scope. Each of the Initial Study, 1st Year Look Back Study, and 5th Year Look Back Study (the “Studies”) shall assess the dollar value of any significant and adverse impact of the Project on a Surrounding Community, after offsetting for the dollar value of any positive impacts of the Project on such community. In determining such assessment the Studies shall consider the following:
Study Scope. 3.2.1 The MAI covers the dredging area in Lung Kwu Xxxxxx Xxx. The location of the study area and adjacent shoreline are marked in Figures 1 and 2. The dredging area is approximately 6,600m2 (i.e. 60m x 110m) as shown on Figure 2. Baseline review, marine geophysical survey and dive survey was conducted at this dredging area.
Study Scope. The purpose of this study is to investigate (at least 3) options for the passenger connection between Vanasadam and Rail Baltica Railway Station Tallinn Ülemiste from a technical and economic standpoint, implement CBA analysis and propose the optimal solution as a sketch route layout to be provided as an input data for the design preparation5. The main objective is to ensure an efficient link between both TEN-T nodes, by providing a sustainable, high quality, high capacity and fast connection, in order to integrate urban, suburban and international passenger flows.
AutoNDA by SimpleDocs
Study Scope. The aim of the study is to provide an inventory of current reserves of activities linked to professional qualifications across 13 EU Member States and in three sectors: business services, construction and tourism. The tender specifications provided an indicative breakdown of the professions within the three sectors and sub-sectors to be covered through the study, including the relevant XXXX industrial code classifications (see Appendix D). A number of wider professions were defined as being within scope under the ‘other sectors’ heading, such as biotechnologist, economist, geologist, vehicle hire and mass media and communications specialist. An overview of the sectors and main XXXX classifications is provided below:
Study Scope. The Study will consider route alignments that originate from Campinorte (connecting to the North South Railway – “Ferrovia Norte-Sul”), in the State of Goias, Brazil, and end at a port along the Pacific Coast in Peru, connecting Brazil and Peru.

Related to Study Scope

  • Study An application for leave of absence for professional study must be supported by a written statement indicating what study or research is to be undertaken, or, if applicable, what subjects are to be studied and at what institutions.

  • Project Scope The physical scope of the Project shall be limited to only those capital improvements as described in Appendix A of this Agreement. In the event that circumstances require a change in such physical scope, the change must be approved by the District Committee, recorded in the District Committee's official meeting minutes, and provided to the OPWC Director for the execution of an amendment to this Agreement.

  • CONTRACT SCOPE Pursuant to this Master Contract, Contractor is authorized to sell and provide only those Goods and/or Services set forth in Exhibit A – Included Goods/Services for the prices set forth in Exhibit B – Prices. Contractor shall not represent to any Purchaser under this Master Contract that Contractor has contractual authority to sell or provide any Goods and/or Services beyond those set forth in Exhibit A – Included Goods/Services.

  • Study Population ‌ Infants who underwent creation of an enterostomy receiving postoperative care and awaiting enterostomy closure: to be assessed for eligibility: n = 201 to be assigned to the study: n = 106 to be analysed: n = 106 Duration of intervention per patient of the intervention group: 6 weeks between enterostomy creation and enterostomy closure Follow-up per patient: 3 months, 6 months and 12 months post enterostomy closure, following enterostomy closure (12-month follow-up only applicable for patients that are recruited early enough to complete this follow-up within the 48 month of overall study duration).

  • Background Screening VENDOR shall comply with all requirements of Sections 1012.32 and 1012.465, Florida Statutes, and all of its personnel who (1) are to be permitted access to school grounds when students are present, (2) will have direct contact with students, or (3) have access or control of school funds, will successfully complete the background screening required by the referenced statutes and meet the standards established by the statutes. This background screening will be conducted by SBBC in advance of VENDOR or its personnel providing any services under the conditions described in the previous sentence. VENDOR shall bear the cost of acquiring the background screening required by Section 1012.32, Florida Statutes, and any fee imposed by the Florida Department of Law Enforcement to maintain the fingerprints provided with respect to VENDOR and its personnel. The parties agree that the failure of VENDOR to perform any of the duties described in this section shall constitute a material breach of this Agreement entitling SBBC to terminate immediately with no further responsibilities or duties to perform under this Agreement. VENDOR agrees to indemnify and hold harmless SBBC, its officers and employees from any liability in the form of physical or mental injury, death or property damage resulting from VENDOR’s failure to comply with the requirements of this section or with Sections 1012.32 and 1012.465, Florida Statutes.

  • Screening 3.13.1 Refuse containers located outside the building shall be fully screened from adjacent properties and from streets by means of opaque fencing or masonry walls with suitable landscaping.

  • Study Area The study area focused on the Bulk Power System in South-Eastern New York between Albany and New York City, and voltages underlying systems at 115 kV and above in the lower Xxxxxx Valley (Zones G, H & I). In the PSS™E power flow base case provided by NYISO, facilities rated at 115 kV and above in PSS™E designated areas 6 through 11 are monitored in the study. These areas are: • Capital District • Xxxxxx • Millwood • Xxxxxxxxx • Con Ed • Long Island

  • Geotechnical Investigation Perform in accordance with the City Design Manual and other City requirements as designated in writing by the Director.

  • Curriculum Work Service on a District curriculum committee shall be required for grade level or department chairpersons. All other teachers working on such committee(s) shall be designated (in writing) by the Curriculum Director and shall be paid, at the hourly rate contained in Schedule B, for all documented hours of committee service (up to such limits as may be imposed by the District) occurring when school is not in session (e.g. during the summer), during duty-free lunch periods or preparation periods, and before/after the teacher’s regularly scheduled work day. Curriculum committee work shall occur at such times as are determined or approved by the Curriculum Director.

  • Protocol No action to coerce or censor or penalize any negotiation participant shall be made or implied by any other member as a result of participation in the negotiation process.

Time is Money Join Law Insider Premium to draft better contracts faster.