Stormwater Control Sample Clauses

Stormwater Control. When the paved surface area exceeds 30 square metres, the stormwater (rainwater runoff) shall be collected by suitable surface shaping, channelling, kerbing and sumps. No water is to flow over a public footpath or flow on to neighbouring properties. Any proposal involving a sump requires a building consent for the drainage works. Any stormwater outlet leading to the street kerb is to be formed of 100mm diameter galvanised mild steel. Where soils, topography and slope permit run off shall be directed from the car park to soak pits or similar vegetated channels. These channels with provisions for infiltration or detention can either  Percolate to the ground where capability is available and is satisfactory to the Drainage Engineer.  Temporarily store run off and release at a slower rate to the public stormwater system However overflows from the channel must drain to an approved outfall
AutoNDA by SimpleDocs
Stormwater Control. Comply with authorities having jurisdiction. Provide barriers in and around excavations and subgrade construction to prevent flooding by runoff of stormwater from heavy rains.
Stormwater Control 

Related to Stormwater Control

  • Stormwater Notwithstanding any other provisions or terms of this Agreement, Company acknowledges that certain properties within the Premises or on Authority-owned land are subject to stormwater rules and regulations. Company agrees to observe and abide by such stormwater rules and regulations as may be applicable to the Premises, and, if applicable, Company hereby expressly covenants, warrants, and represents to Authority, in connection with Company’s operations on the Premises, the following:

  • Stormwater Management The Owner agrees that stormwater management measures shall be applicable to the development of the Lands, in a manner which is in accordance with the provisions of The Drainage Act, R.S.O. 1990, c.D.17 and amendments thereto, and to the satisfaction of the Municipality's Engineer.

  • Erosion and Sediment Control The Contractor shall install and maintain erosion and sediment control devices to prevent adjacent streets, storm drains and property from accumulations of soil, sediment, or dust which result from his work. Devices installed to control sediment and prevent erosion shall comply with the requirements of the Georgia Tech Project Superintendent. The Contractor is responsible for monitoring downstream conditions throughout the construction period and clearing any debris, sediment, and dust caused by the progress of the Work. The Contractor shall inspect, maintain, and clear erosion and sediment control devices at least weekly unless otherwise directed by the Georgia Institute of Technology Construction Manager. At the conclusion of the Work, the Contractor shall remove all installed devices and restoring the site to the satisfaction of the Georgia Tech Construction Manager.

  • Parking and Transportation ‌ The Union agrees that during the life of this Agreement, the University may apply changes in transportation policy, including adjusting parking and U-Pass fees and criteria for assigning parking spots, to the bargaining unit without the obligation to bargain with the Union. The Union may raise issues and concerns about the University’s parking program at Joint Labor/Management Committee meetings or at ad hoc Labor Management Committee meetings. The Union shall have a standing seat on the University’s committee(s) that work on transportation and parking issues.

  • Wastewater i.e. wastewater and storm water collection, treatment and management systems.

  • Dewatering 4.7.1 Where a part of a site is affected by surface water following a period of rain, thus rendering some areas unsafe for productive work, consistent with the Employer’s obligations under the OH&S Act, all non- trades employees shall assist in ‘dewatering’ their own work site or area if it is so affected. Such work to be paid at single time rates. Productive work will continue in areas not so affected.

  • Pest Control A. Whenever a department utilizes a pest control chemical in State owned or managed buildings/grounds, the department will provide at least forty-eight (48) hours notice prior to application of the chemical, unless an infestation occurs which requires immediate action. Notices will be posted in the lobby of the building and will be disseminated to building tenant contacts.

  • Air Transportation In accordance with the standard provision entitled International Air Transportation, any international travel requires prior written approval from the FHI360 contracts administrator.

  • Erosion Control a. The Purchaser shall construct slash and debris erosion barriers, dips, water bars or ditches in skid trails and landings as directed by the Forest Officer.

  • Quality Control A. Controlled Affiliate agrees to use the Licensed Marks and Name only in connection with the licensed services and further agrees to be bound by the conditions regarding quality control shown in attached Exhibit A as they may be amended by BCBSA from time-to-time.

Time is Money Join Law Insider Premium to draft better contracts faster.