Standard Installation - Unwired Dwelling Unit Sample Clauses

Standard Installation - Unwired Dwelling Unit. Standard installation of an unwired dwelling unit shall be installation of cable service to the Subscriber's dwelling unit located up to 125 feet from the existing distribution system, plus additional inside wire and at least one outlet sufficient to receive Cable Services.
AutoNDA by SimpleDocs

Related to Standard Installation - Unwired Dwelling Unit

  • Equipment Installation In order to meet its obligations under this Agreement, a Party that owns, rents, or leases equipment (the equipment owner) may require installation of such equipment on property owned by another Party (the property owner), provided that the property is being used for an electric utility purpose and that the property owner shall not be required to do so if it would thereby be prevented from performing its own obligations or exercising its rights under this Agreement.

  • Delivery & Installation a) Subject to the conditions of the contract, the delivery of the goods and completion of the related services shall be in accordance with the delivery and completion schedule specified in the bidding document. The details of supply/ shipping and other documents to be furnished by the successful/ selected bidder are specified in the bidding document and/ or contract.

  • Licenses for Permanent Installation The contractor must comply with all State mandatory licensing requirements prior to installation. Questions on licensing requirements should be directed to the State Licensing Board. Contractor must furnish and install all furniture and materials in compliance with all applicable codes, whether local, state, or federal; and that all permits or licenses required for installation will be obtained without cost to the State.

  • Delivery and Installation Delivery

  • Software Installation The AGENCY shall request approval in writing from the COUNTY prior to installation of any software on COUNTY computer equipment. All software installations must be supervised by COUNTY technical support staff and proof of licensing is required. Upon completion, the AGENCY is responsible for reconfiguring the computers back to the original state.

  • Delivered and Installed Off loaded, and installed. Installation shall include but not limited to; any and all labor, material, and tools necessary to install furniture in accordance with approved plans and specifications and/or the direction of authorized agency personnel. The installation company will be responsible for the removal of any trash, packing material, and cartons associated with their installation. The contractor/installation company will repair/replace (to the satisfaction of the ordering entity) any damage to the building or its’ contents that they (the contractor) caused in the course of their work. This includes but is not limited to: walls, floors, floor coverings, ceilings, elevators, doors, doorways, and any existing fixtures and furniture. The agency may withhold payment until repairs are satisfactorily completed.

  • Testing of Metering Equipment Connecting Transmission Owner shall inspect and test all of its Metering Equipment upon installation and at least once every two (2) years thereafter. If requested to do so by NYISO or Developer, Connecting Transmission Owner shall, at Developer’s expense, inspect or test Metering Equipment more frequently than every two (2) years. Connecting Transmission Owner shall give reasonable notice of the time when any inspection or test shall take place, and Developer and NYISO may have representatives present at the test or inspection. If at any time Metering Equipment is found to be inaccurate or defective, it shall be adjusted, repaired or replaced at Developer’s expense, in order to provide accurate metering, unless the inaccuracy or defect is due to Connecting Transmission Owner’s failure to maintain, then Connecting Transmission Owner shall pay. If Metering Equipment fails to register, or if the measurement made by Metering Equipment during a test varies by more than two percent from the measurement made by the standard meter used in the test, Connecting Transmission Owner shall adjust the measurements by correcting all measurements for the period during which Metering Equipment was in error by using Developer’s check meters, if installed. If no such check meters are installed or if the period cannot be reasonably ascertained, the adjustment shall be for the period immediately preceding the test of the Metering Equipment equal to one-half the time from the date of the last previous test of the Metering Equipment. The NYISO shall reserve the right to review all associated metering equipment installation on the Developer’s or Connecting Transmission Owner’s property at any time.

  • Installation Waiver Company will waive the one-time installation charges associated with the implementation of Services within the 48 contiguous States of the U.S. provided under this Agreement except for the following services: (i) eDSL, (ii) VPN, (iii) Internet Dedicated OC3, OC12, OC48, Gig-E, (iv) PTT / third party services (including International Access and Company International), (v) Data Center, (vi) Paging, (vii) Managed Services, (viii) CPE, (ix) Enhanced Call Routing, (x) Local Disaster Recovery, (xi) Audio, Video and Net Conferencing, (xii) Voice over IP Services, (xiii) Security Services, (xiv) Non-Listing/Non-Published Service, (xv) Telecommunications Service Priority, and (xvi) Services provided by Company incumbent local exchange carriers (“ILECs”) or by Cellco Partnership and its affiliates d/b/a Company Wireless. Usage charges, monthly recurring charges, expedite charges, change charges, surcharges, charges for an unlisted or non-published number, any charges imposed by third parties (including access, egress, jack, or wiring charges), taxes or tax-like surcharges, or other Governmental Charges will not be waived.

  • INSTALLATION AND REMOVAL Show Management reserves the right to fix the time for the installation of a booth prior to the Show opening and for its removal after the conclusion of the Show. Installation of all exhibits must be fully completed by the opening time of the exposition. Any space not claimed and occupied three hours prior to opening, may be resold or reassigned without refund. No exhibitor will be allowed to dismantle or repack any part of his exhibit until after the closing of the Show. 6.

  • Installation Services 3.1 The Bitstream 2a Service includes a Standard Install as set out below (in each case to the extent that the relevant provisioning works are not already complete for the relevant Service Order).1

Time is Money Join Law Insider Premium to draft better contracts faster.