Standard Design Basis Sample Clauses

Standard Design Basis. Operation-350 days per year, 24 hours per day Feedstock Supply-Number 2 Dent Corn Critical process equipment backup emergency generator on 600 volt 3 phase essential services xxxx Cooling tower pump in-line spare Hammer mill system sized for 120% of design basis requirement DDGS dryer sized for 120% of design basis requirement VOC thermal oxidation destruction efficiency of 95% minimum or permit limits, whichever is higher Ethanol water scrubber absorption efficiency of 98.5% minimum Ethanol product moisture content of 2000 ppm maximum Ability to feed wet distillers grains from wet pad to dryer Grain Storage-10 days to accommodate unit train unloading Ethanol Main Product Tankage – 10 days Ethanol Day Tankage - 24 hours Denaturant Storage Tank – 14 days DDGS Storage – 7 days Wet Cake Pad –(Sized for upset conditions only) Condensed soluble Tankage – 1 day Provide cleared, leveled, ready to build site by Northern Ethanol Provide all temporary power and other services necessary for construction Site grading and earthworks Soil improvements to reach required bearing capacity and eliminate soil expansion/contraction, settlement and moisture complications Tie-in to municipal system Backup fuel supply storage for the emergency generator Permanent fencing and security, including guard shack Electrical Interface from the utility, including metering, voltage step down 4160 and 600 volt, switching and protection, the Battery limits will be defined during the proposal stage. Natural gas within Battery limits including metering, pressure reduction and control Temporary utility connection and consumption Temporary construction facilities such as offices, utilities, security, and parking, including facilities for the owner First fills of lubricants Startup and operational spare parts, tools and consumables Operation and permanent spare parts allowance to be provided to Owner with EPC Price Site surfacing Noise abatement Unit train (25 cars) grain unloading system (owner will shuttle) Lab equipment including case work, countertops, shelves and sinks (Northern?) Technical data for non-air environmental permits (water) Detailed engineering for Site-specific issues Equipment/operations redundancy Raw water system suitable for fire protection needs Raw water system of adequate quality to meet ethanol process requirements All equipment shall be new and clean The Plant DCS control system shall monitor and control the majority of all Plant processes and provide adequate process...
AutoNDA by SimpleDocs

Related to Standard Design Basis

  • Selection of Architect/Construction Drawings Tenant shall retain an architect/space planner reasonably and mutually agreed upon by Landlord and Tenant (the “Architect”) to prepare the “Construction Drawings,” as that term is defined in this Section 3.1. The Contractor (as that term is defined in Section 4.1 of this Work Letter) shall provide design-build services from qualified, Landlord-approved mechanical, electrical and plumbing contractors for the preparation of plans and engineering working drawings related to the Improvements. Landlord hereby approves Gensler as the Architect if Tenant decides to select them. Tenant shall retain the engineering consultants designated by Landlord (the “Engineers”) to prepare all plans and engineering working drawings relating to the structural, HVAC, lifesafety, and sprinkler work in the Premises, which work is not part of the Base Building, provided that Tenant shall retain the subcontractors designated in Schedule 2 attached hereto for the fire alarm design and programming work (the “Fire Alarm Subcontractor”) and for building management systems (the “BMS Subcontractor”). Landlord hereby approves Gensler as the Engineer if Tenant decides to select them. Should Tenant choose to prepare fully engineered drawings in lieu of the design-build approach described above, then Tenant shall retain the Engineers to prepare all plans and engineering working drawings relating to the mechanical, electrical and plumbing work of the Improvements. The plans and drawings to be prepared by Architect, the design-build contractors (unless Tenant selects the fully engineered drawings approach described above), the Fire Alarm Subcontractor, the BMS Subcontractor and the Engineers hereunder shall be known collectively as the “Construction Drawings.” Landlord hereby approves Gensler and Revel to be the Architect if Tenant selects them. All Construction Drawings shall comply with the drawing format and specifications reasonably determined by Landlord, and shall be subject to Landlord’s reasonable approval. Tenant and Architect shall verify, in the field, the dimensions and conditions as shown on the relevant portions of the Base Building plans, and Tenant and Architect shall be solely responsible for the same, and Landlord shall have no responsibility in connection therewith. Landlord’s review of the Construction Drawings as set forth in this Section 3, shall be for its sole purpose and shall not imply Landlord’s review of the same, or obligate Landlord to review the same, for quality, design, Code compliance or other like matters. Accordingly, notwithstanding that any Construction Drawings are reviewed by Landlord or its space planner, architect, engineers and consultants, and notwithstanding any advice or assistance which may be rendered to Tenant by Landlord or Landlord’s space planner, architect, engineers, and consultants, Landlord shall have no liability whatsoever in connection therewith and shall not be responsible for any omissions or errors contained in the Construction Drawings, and Tenant’s waiver and indemnity set forth in the Lease, as amended, shall specifically apply to the Construction Drawings.

  • Auction Schedule; Method of Submission of Orders (a) The Fund and the Auction Agent shall conduct Auctions for Preferred Shares in accordance with the schedule set forth below. Such schedule may be changed at any time by the Auction Agent with the consent of the Fund, which consent shall not be withheld unreasonably. The Auction Agent shall give notice of any such change to BD. Such notice shall be received prior to the first Auction Date on which any such change shall be effective. Time Event ---- -----

  • Building Services To install, use and maintain through the Premises, pipes, conduits, wires and ducts serving the Building, provided that such installation, use and maintenance does not unreasonably interfere with Tenant's use of the Premises.

  • Acceptance Testing The MCP must have the capability to report all elements in the Minimum Data Set as set forth in the ODJFS Encounter Data Specifications and must submit a test file in the ODJFS-specified medium in the required formats prior to contracting or prior to an information systems replacement or update. Acceptance testing of encounter data is required as specified in Section 29(a)(v) of this Appendix.

  • Base Building “Base Building” means the Building Structure and Mechanical Systems, collectively, defined as follows:

  • Additional Work Upon Tenant's request and submission by Tenant (at Tenant's sole cost and expense) of the necessary information and/or plans and specifications for work other than the Work described in the Working Drawings ("Additional Work") and the approval by Landlord of such Additional Work, which approval Landlord agrees shall not be unreasonably withheld, Landlord shall perform such Additional Work, at Tenant's sole cost and expense, subject, however, to the following provisions of this Paragraph 7. Prior to commencing any Additional Work requested by Tenant, Landlord shall submit to Tenant a written statement of the cost of such Additional Work, which cost shall include a fee payable to Landlord in the amount of 15% of the total cost of such Additional Work as compensation to Landlord for monitoring the Additional Work and for administration, overhead and field supervision associated with the Additional Work and an additional charge payable to Landlord in the amount of 5% of the total Cost of the Additional Work as compensation for Landlord's general conditions (such fee and additional charge being hereinafter referred to collectively as "Landlord's Additional Compensation"), and, concurrently with such statement of cost, Landlord shall also submit to Tenant a proposed tenant extra order (the "TEO") for the Additional Work in the standard form then in use by Landlord. Tenant shall execute and deliver to Landlord such TEO and shall pay to Landlord the entire cost of the Additional Work, including Landlord's Additional Compensation (as reflected in Landlord's statement of such cost), within five (5) days after Landlord's submission of such statement and TEO to Tenant. If Tenant fails to execute or deliver such TEO or pay the entire cost of such Additional Work within such 5-day period, then Landlord shall not be obligated to do any of the Additional Work and may proceed to do only the Work, as specified in the Working Drawings.

  • Standard Operating Procedures Over approximately the past eight years, the Parties have been supplying select Products to one another for use in the operation of their respective businesses within the United States of America, Canada and Mexico. The Parties developed and been following certain standard operating procedures in connecting with, among other topics, forecasting, production planning, ordering, delivering and resolving claims on the Products supplied to one another (the “Current SOPs”). The Parties will be updating their respective business systems over the next six months, and the updates to these business systems will require the Parties to modify the Current SOPs. Once the Parties have completed the updates to the business systems and agreed on the necessary modifications to the Current SOPs, the Parties will sign a written amendment to this Agreement appending the updated standard operating procedures (the “Updated SOPs”). Until the Parties have signed a written amendment appending the Updated SOPs, the parties will continue to follow the Current SOPs. The Parties will comply with the applicable SOPs in connection with the purchase and sale of products identified in a Purchase Schedule. The Parties may add terms and conditions to, and amend the terms and conditions of, the SOP in a Purchase Schedule, but any additional and amended terms and conditions in a Purchase Schedule supplementing and modifying the SOP will only apply the specific products identified in that Purchase Schedule for its duration.

  • Technical Specifications Each Bloom System is an integrated system comprised of a fuel cell stack assembly and associated balance of plant components that converts a fuel into electricity using electrochemical means that (i) has a Nameplate Capacity of at least 0.5 kilowatts of electricity using an electrochemical process and (ii) has an electricity-only generation efficiency greater than thirty percent (30%).

  • Base Building Work Landlord shall construct the Base Building Work as further set forth on Exhibit 10.03, attached.

  • Project Schedule Contractor shall perform the Work in accordance with the Project Schedule.

Time is Money Join Law Insider Premium to draft better contracts faster.