Specification of Electrical Energy Delivery Sample Clauses

Specification of Electrical Energy Delivery a) The generation voltage from the Solar Photovoltaic Grid Interactive Power Project of M/s. is KV. It uses unit connection of generator, generator transformer and unit transformer.
AutoNDA by SimpleDocs
Specification of Electrical Energy Delivery a) The generation voltage from the MW Grid Interactive Wind Power Project of is KV. It uses unit connection of generator, generator transformer and unit transformer.
Specification of Electrical Energy Delivery. 1. The generation voltage from the Biomass Based Power Plant of M/s. ************* is ** KV. It uses unit connection of generator, generator transformer and unit transformer.
Specification of Electrical Energy Delivery. 1. The generation voltage from the wind energy based/Mini hydel Electric Power Plant/Solar plant/Cogeneration plant/WTE plant of M/s……………….. is at ….kV. It comprises generators, generator transformer and unit transformer.
Specification of Electrical Energy Delivery. 1. The generation voltage from the Bagasse Based Cogeneration Power Plant of M/s. ................... is ... KV. It uses unit connection of generator, generator transformer and unit transformer.

Related to Specification of Electrical Energy Delivery

  • Energy Resource Interconnection Service (ER Interconnection Service).

  • Interconnection Customer Provided Services The services provided by Interconnection Customer under this LGIA are set forth in Article 9.6 and Article 13.5.1. Interconnection Customer shall be paid for such services in accordance with Article 11.6.

  • Interconnection 2.1.10 Startup Testing and Commissioning

  • Network Interconnection Architecture Each Party will plan, design, construct and maintain the facilities within their respective systems as are necessary and proper for the provision of traffic covered by this Agreement. These facilities include but are not limited to, a sufficient number of trunks to the point of interconnection with the tandem company, and sufficient interoffice and interexchange facilities and trunks between its own central offices to adequately handle traffic between all central offices within the service areas at P.01 grade of service or better. The provisioning and engineering of such services and facilities will comply with generally accepted industry methods and practices, and will observe the rules and regulations of the lawfully established tariffs applicable to the services provided.

  • Interconnection Point The Service Provider is responsible for connecting to the LFC Network at the Interconnection Point. The LFC may only change an Interconnection Point if a change is necessary to protect the security or integrity of that Interconnection Point in order to maintain the continuity of supply of the Wholesale Services. In the event of any such change:

  • Interconnection Service Interconnection Service allows the Interconnection Customer to connect the Large Generating Facility to the Participating TO’s Transmission System and be eligible to deliver the Large Generating Facility’s output using the available capacity of the CAISO Controlled Grid. To the extent the Interconnection Customer wants to receive Interconnection Service, the Participating TO shall construct facilities identified in Appendices A and C that the Participating TO is responsible to construct. Interconnection Service does not necessarily provide the Interconnection Customer with the capability to physically deliver the output of its Large Generating Facility to any particular load on the CAISO Controlled Grid without incurring congestion costs. In the event of transmission constraints on the CAISO Controlled Grid, the Interconnection Customer's Large Generating Facility shall be subject to the applicable congestion management procedures in the CAISO Tariff in the same manner as all other resources.

  • Interconnection Request This Section 3 shall not apply to any proposed modifications by Interconnection Customer to its facilities for which Interconnection Customer must make an Interconnection Request under the Tariff. In such circumstances, the Interconnection Customer and Transmission Provider shall follow the requirements of Subpart A of Part IV of the Tariff.

  • Electrical Provide drawings for the following systems:

  • Interconnection Points 8.5.1 The IP of a Party (“Receiving Party”) for Measured Internet Traffic delivered to the Receiving Party by the other Party shall be the same as the IP of the Receiving Party for Reciprocal Compensation Traffic under Section 7.1 above.

  • Electrical Service Electrical service for new construction or a renovated existing building shall be 480/277-volt, 3-phase, 4-wire or approved equal. Service shall be sized for HVAC and other mechanical system(s) loads, lighting, general building services, and dedicated computer based office equipment loads. 5 xxxxx per square foot shall be provided for lighting and general service receptacles. Size of neutral conductor of 3- phase circuits shall be twice that of phase conductor to accommodate potential harmonic currents associated with computer system electronic power supplies and fluorescent lighting fixtures electronic ballasts. An adequately sized 3 phase “wye” wound step down transformer shall be provided to supply 208/120-volt, 3 phase power, for lighting, general service receptacles and dedicated computer based office equipment. Dedicated, isolated ground circuits shall be supplied from separate isolated ground power distribution panel(s). Lighting circuits shall be supplied from separate lighting panel(s). Panels shall have 20% spare capacity and be complete with 10% spare breakers of each size, but no less than 1 spare. No more than 4 duplex receptacles shall be connected to any single 20-amp dedicated isolated ground circuit or general service circuit.

Time is Money Join Law Insider Premium to draft better contracts faster.