Specific Work Requirements Sample Clauses

Specific Work Requirements. In addition, the Contractor shall provide the specific work requirements described below. Recreation and Parks Recreational Programming Park Development & Design Park Maintenance Areas in yellow will be provided by an independent contractor. These areas are not a part of this procurement. RECREATION AND PARKS (WBS 13.0 SOW – WBS 13.3 SOW)
AutoNDA by SimpleDocs
Specific Work Requirements. In addition, the Contractor shall provide the specific work requirements described below. Municipal Court Services Court Administration Solicitor Services Probation Services Areas in yellow will be provided by an independent contractor. These areas are not a part of this procurement. MUNICIPAL COURT SERVICES (WBS 7.0 SOW – WBS 7.1 SOW)
Specific Work Requirements. In addition, the Contractor shall provide the specific work requirements described below. Communications Community Relations Media & General Communications Marketing Special Events Emergency Operations Note: All areas of Communications are included in this procurement. COMMUNICATIONS (WBS 6.0 SOW – WBS 6.4 SOW)
Specific Work Requirements. In addition, the Contractor shall provide the specific work requirements described following. Information Services IT Infrastructure and Support GIS Services Note: All areas of Information Services are included in this procurement. INFORMATION SERVICES (WBS 4.1 SOW – WBS 4.2 SOW) In connection with all WBS elements within Information Services, the Contractor shall:
Specific Work Requirements. In addition, the Contractor shall provide the specific work requirements described below. Facilities Building Engineering Building Security Building Maintenance Security System Maintenance Fountain Maintenance Operational Planning Inventory Controls Lobby Reception Operations Event Support Loading Dock Operations Landscaping Coordination Mail Center Operations Physical Security Areas in gray represent subcontracts held by the City FACILITIES (WBS 17.0 SOW – WBS 18.4 SOW)
Specific Work Requirements. A sample of the types of functions and duties that the Probation Department may require are as follows:
Specific Work Requirements. 4.1 Contractor must provide the most qualified Contractor Staff for each job classification based on education, work experience, certification/license, background, interpersonal skills, and aptitude.
AutoNDA by SimpleDocs
Specific Work Requirements. In addition, the Contractor shall provide the specific work requirements described below. Public Works / TSPLOST Traffic Services Transportation Planning Stormwater Management Field Services Capital Improvement Program Traffic Engineering Strategic Planning Construction Project Management Pavement Management PM/CM Services Traffic Management Center Operational Planning Regulatory Compliance Utility Coordination & Permitting Contract Compliance Traffic Studies Right-Of-Way Infrastructure Maintenance ROW Maintenance Traffic Signal Maintenance Relationship Coordination Bridge Maintenance Striping Emergency Road Services Sign Maintenance Note: Areas in gray represent subcontracts held by the City PUBLIC WORKS / TSPLOST (WBS 8.0 SOW – WBS 12.4 SOW)
Specific Work Requirements. 3.1 ROOFTOP PACKAGED UNITS Preventative maintenance service to be performed quarterly per manufacturer’s recommendation. Some Examples: • Filters changed quarterly on a minimum basis or as required. • Lock out and tag out equipment as required. • Check all electrical wiring & connections; tighten as required. • Check all motor starter contactor surfaces for wear. • Clean electrical control enclosures. • Lubricate air handling unit motor bearings and fan bearings, if applicable. • Check air handling unit belts for wear. • Check belt tension and sheave alignment. • Change belt and change as required. • Check all mounting hardware, tighten as needed. • Check and calibrate controls. • Check condition of evaporator coils. Chemically clean as required. Preventative maintenance service to be performed annually: • Check and clean condensate drains, drain line and pan. • Inspect air handling unit fan assembly. • Lubricate condenser motors as required. • Chemically clean condenser coil and fan blades. • Check structural integrity of unit. • Check and calibrate controls.
Specific Work Requirements. The Contractor shall provide the specific work requirements described below.
Time is Money Join Law Insider Premium to draft better contracts faster.