Source Quality Control. 1. Testing laboratory shall provide continuous inspection at concrete batch plant for all structural concrete, defined as follows:
AutoNDA by SimpleDocs
Source Quality Control. A. Inspection and testing will be performed under provisions of Section 014000.
Source Quality Control. 1 Provide the Engineer prior to fabrication, with two (2) copies of steel producer certificates, in accordance with CSA G40.20/G40.21. .2 Base the acceptance criteria for all welding inspections on CSA W59, Section 12, Dynamic Steel Structures. .1 Have all welds visually inspected. Have all full penetration welds, except those specified in webs, 100% inspected by Radiographic or Ultrasonic methods. When welds are tested by the Ultrasonic method, perform spot Radiography on 10% of those welds tested. .2 Fillet welds to have 100 percent of the total weld length tested by magnetic particle inspection. .3 Repair any welds that do not meet the acceptance standards herein. Re-test welds at no additional cost to the Contract.
Source Quality Control. 1. Testing and inspection:
Source Quality Control. (a) Arrange for a plant inspection by Contract Administrator where specified.
Source Quality Control. 5.2.1. Ensure that Work meets specified requirements
Source Quality Control. A. Cement: Test for total chloride content.
AutoNDA by SimpleDocs
Source Quality Control. A. The CWI shall be present whenever shop welding is performed. The CWI shall perform inspection at suitable intervals prior to assembly, during assembly, during welding, and after welding. CWI duties include: 1. Verifying conformance of specified job material and proper storage. 2. Monitoring conformance with approved WPS. 3. Monitoring conformance of WPQ. 4. Inspecting weld joint fit-up and in-process inspection. 5. Providing 100 percent visual inspection of welds. 6. Supervising nondestructive testing personnel and evaluating test results. 7. Maintaining records and preparing report confirming results of inspection and testing comply with
Source Quality Control. A. Factory testing: 1. Notify the Project Representative a minimum of 14 days prior to the testing so the Project
Source Quality Control. 1 Provide Departmental Representative with certified copy of mill test report of reinforcing steel, showing physical and chemical analysis, minimum 4 weeks prior to commencing reinforcing work. .2 Inform the Departmental Representative of proposed source of material to be supplied. Part 3 Execution