Site Drainage Sample Clauses

Site Drainage. The site surface water, soil drainage systems, all access points, and their coverings must be maintained in good working order. Sewage treatment plant and installations must be maintained to ensure that they operate to their optimum performance.
AutoNDA by SimpleDocs
Site Drainage. A. Each Tenant shall be required to provide adequate stormwater drainage facilities, including on-site ponding areas (if needed) and metering of storm water runoff resulting from precipitation or storm sewers, or both, in accordance with the requirements of the City of Albuquerque and Bernalillo County and any other applicable governmental agency or authority and with the Park Development Standards and any master drainage plan for the Land as prepared by Landlord.
Site Drainage. All drainage ways shall be kept free of debris and other obstructions to the flow of water. Sediment ponds shall be excavated as the need arises with the trapped sediment being returned as cover material on the Landfill. No water contaminated with leachate shall be discharged from the site to the natural drainage outfalls.
Site Drainage. All water that may accumulate on the site during the progress of the work or in trenches and excavations shall be removed by the contractor to the entire satisfaction of the Engineer-in-Charge at his own expense.
Site Drainage. All water which may accumulate on the Switchyard during the progress of the works, or in trenches and excavations, from other than the Excepted Risks shall be removed from the Switchyard and other areas to the satisfaction of the Engineer-in-Charge and at the Contractor's expense.
Site Drainage. All water that may accumulate on the site during the progress of the work or in trenches and excavations shall be removed to the entire satisfaction of the Engineer-in-charge and at Contractor’s expense.
Site Drainage. Pumping by contractor to be included in unit rate of items. Drainage of existing storm sewers and ditches has to be maintained during the construction of the proposed project.
AutoNDA by SimpleDocs
Site Drainage. The Contractor shall provide for the drainage of the Facility at all times. Operations shall be conducted so that drainage of rain water off and away from diversion areas, product storage areas, dumping pad areas and any other operations areas is constantly maintained and erosion and nuisance is minimized. Contractor shall follow Best Management Practices and Facility permit requirements. The Contractor recognizes that it is required to provide positive drainage and manage storm water as required in this Agreement and Facility permits. Contractor’s payment shall be withheld in accordance Section 10.5 in the event that a deficiency in site drainage or storm water management is not corrected within the specified time frames.
Site Drainage. Any specified backfilling of basements, cellars or any other such excavation shall be performed in a manner that will prevent ponding of surface water and will not materially affect the natural drainage pattern of the surrounding premises. The CEC will notify Contractor of any required site drainage and will negotiate with Contractor on the number of labor hours required. Upon NTP being provided to Contractor to proceed with Work, Contractor may invoice the City for site drainage Work at Bidder's Extraordinary Labor Rate.
Site Drainage. The Contractor shall provide for the drainage of the fill area, whether completed by past or present Contractors, at all times and shall follow the Final Grading Plans and Operation Plans. Operations shall be conducted so that drainage of rain water off and away from buried refuse, diversion areas, dumping pad area and any other operations areas is constantly maintained and erosion and nuisance is minimized. The Contractor shall construct all fill areas whether temporary or permanent with a minimum slope of five (5) percent in at least one direction. The Contractor shall place and relocate drainage control devices (as shown on Final Grading Plans- Sheets 3 to 6) supplied by the Department as necessary to maintain positive drainage and minimize erosion. All other drainage and erosion control devices shall be provided by the Contractor. The Contractor shall immediately remove any ponding over any waste fill surface, or within 50 feet of fill. The Contractor shall provide pumps, pipes, hoses, or any other equipment necessary to remove such ponding to appropriate drainage locations. The Contractor shall provide, place and relocate drainage control devices, construct v-ditches and berms, and provide all personnel and equipment necessary to maintain positive drainage, minimize erosion around the working areas of the Site and around exposed liner areas, and minimize infiltration and leachate generation in all waste fill areas. The Contractor recognizes that he is required to provide positive drainage as required in this Agreement. In the event that deficiency in site drainage is not corrected within the time frames specified in Article 6.2.3 then Contractor’s payment shall be withheld in accordance with Article 6 of this Agreement.