Site cleaning Sample Clauses

Site cleaning. All the rates quoted are inclusive of removal of rubbish / debris collected during the progress of work, rejected material and clearance of site before and after the work is completed. The contractor shall arrange to remove the same immediately. If the contractor fails to do so, Employer shall remove the same and the expenses thus incurred shall be recovered from the contractor and no claim of any sort will be entertained.
AutoNDA by SimpleDocs
Site cleaning. عقوملا ةفاظن ٧
Site cleaning. 6.1. Except where special permission is obtained, maintain clear access on public sidewalks and roads.
Site cleaning. (i) The Supplier must at its own cost and to the satisfaction of SCE:
Site cleaning. Each Contractor is responsible for maintaining the Contractor’s worksite clean of debris, trash, and consumables at all times. If after one notice from the LHA to the Contractor, the LHA may charge $300 to the Contractor for each instance that site or a housing unit is cleaned by others. More than one notice of non-compliance may lead to termination of this Contract.
Site cleaning. At the conclusion of production, streets in The Summit must cleaned of all debris. The production company may elect to clean streets itself or retain the services of the LF-SOA’s street cleaning service.

Related to Site cleaning

  • Carpet Cleaning Shampooing carpets with the deep dirt extraction (steam cleaning) method per manufactures recommendations.

  • Dry Cleaning Timpson have over 520 dry cleaning stores and are now the UK’s biggest family-run dry cleaner. We process and clean up to 40,000 garments per week and have 32 Dry Cleaning production sites located around the UK. 19 of these sites are Timpson Super Hubs and act as satellite production centres. We offer customers a next day service on everyday items and quality check each garment before it leaves production. Dry Cleaning by Timpson See prices, opening times and more about dry cleaning and laundry services in , . From £2 per item. : Dry cleaning & laundry services DLS have the expertise to advise, design, supply, install & maintain your professional laundry equipment

  • Cleaning 8.1 CONTRACTOR shall, at his own expenses, at all times keep the premises free from accumulation of debris, waste materials, and rubbish, and at the completion of the work, he shall remove his tools and equipment and all surplus materials, debris, waste material, and rubbish and shall leave the premises in a neat and clean condition. If CONTRACTOR does not attend to such cleaning immediately upon request, OWNER shall have the right to have this work done by others and deduct the cost therefore from the payment due CONTRACTOR hereunder.

  • Equipment Cleaning (a) Areas, known by Forest Service prior to timber sale advertisement, that are infested with invasive species of concern are shown on Sale Area Map. A current list of invasive species of concern and a map showing the extent of known infestations is available at the Forest Supervisor’s Office. For purposes of this provision, “Off-Road Equipment” includes all logging and construction machinery, except for log trucks, chip vans, service vehicles, water trucks, pickup trucks, cars, and similar vehicles.

  • Drainage Systems (1) Clear culvert inlets, outlets, and sediment catching basins.

  • Wastewater i.e. wastewater and storm water collection, treatment and management systems.

  • SITE CLEARANCE ETC Allow for clearing the area of the site to be built upon of all grass, weeds, shrubs, trees with trunks not exceeding 200mm girth, debris, etc., including grubbing up all roots, scoffling up as required and cart away all vegetation and debris. Quantity m2 200 Rate 2 Stripping average 300mm thick layer of topsoil and stockpiling on site. m2 200

  • Potable Water Contractor shall provide potable water and ice for the Stage 2 Site use, and ensure that a safe and plentiful supply of potable water and ice is available for all activities on the Stage 2 Site until Substantial Completion of Subproject 3. The water and ice for human consumption shall be of suitable quality.

  • Final Cleaning Before final inspection of the work, the Contractor shall clean all ground occupied by the Contractor in connection with the work of all rubbish, excess materials, temporary structures and equipment, and all parts of the work must be left in a neat and presentable condition to the satisfaction of the Project Manager. However, the Contractor shall not remove any warning and directional signs prior to the formal acceptance by the Project Manager. Full compensation for final cleaning will be included in the prices paid for the various items of work or lump sum bid, as the case may be, and no separate payment will be made therefor.

  • Excavation If any excavation shall be made upon land adjacent to or under the Building, or shall be authorized to be made, Tenant shall afford to the person causing or authorized to cause such excavation, license to enter the Premises for the purpose of performing such work as said person shall deem necessary or desirable to preserve and protect the Building from injury or damage and to support the same by proper foundations, without any claim for damages or liability against Landlord and without reducing or otherwise affecting Tenant’s obligations under this Lease.