Site Assessment and Planning Sample Clauses

Site Assessment and Planning. During the Initial Period, Provider shall have the right, at its own expense, to assess the suitability of the Premises for the Project and shall act diligently in conducting such assessment. The assessment shall include the right to inspect the physical condition of the structures on which the Project will be located; to apply for any building permits or other governmental authorizations necessary for the construction of the Project; and to arrange interconnections with the Local Electric Utility; to make any applications to the appropriate Public Utilities Commission or other agencies for receipt of payments for the Project under the Applicable Solar Program; to apply to any other governmental agencies or other persons for grants or other determinations necessary for the construction of or receipt of revenues from the Project; or to make any other investigation or determination necessary for the financing, construction, operation or maintenance of the Project. The Provider, at its own cost shall perform and determine a structural analysis of the Host’s site to determine feasibility, safety, and to ensure the proper install, maintenance, and operation of the solar system. Provider shall provide a copy of the building permit, a stamped engineering drawing and related structural engineering analysis to the Director of Public Buildings prior to Commencement of Construction. Provider will do nothing that violates the roof warranty, and will hire a roofing contractor certified by the roofing material manufacturer to provide continuation of warranty documentation to Host.
AutoNDA by SimpleDocs
Site Assessment and Planning. During the Initial Period, Provider shall have the right, at its own expense, to assess the suitability of the Premises for the Project and shall act diligently in conducting such assessment. The assessment shall include the right to inspect the physical condition of the structures on which the Project will be located; to apply for any building permits or other governmental authorizations necessary for the construction of the Project; to arrange interconnections with the Local Electric Utility; to make any applications to the appropriate Public Utilities Commission or other agencies for receipt of payments for the Project under the Applicable Solar Program; to apply to any other governmental agencies or other persons for grants or other determinations necessary for the construction of or receipt of revenues from the Project; or to make any other investigation or determination necessary for the financing, construction, operation or maintenance of the Project. The Provider, at its own cost shall perform and determine a structural analysis of the Host’s site to determine feasibility, safety, and to ensure the proper install, maintenance, and operation of the solar system. Provider shall provide a copy of structural engineering analysis to Host at Host’s request.
Site Assessment and Planning. During the Initial Period, [PROVIDER COMPANY] shall have the right, at its own expense, to assess the suitability of the Premises for the Project and shall act diligently in conducting such assessment. The assessment shall include the right to inspect the physical condition of the structures on which the Project will be located; to apply for any building permits or other governmental authorizations necessary for the construction of the Project; to arrange interconnections with the Local Electric Utility; to make any applications to the appropriate Public Utilities Commission or other agencies for receipt of payments for the Project under the Applicable Solar Program; to apply to any other governmental agencies or other persons for grants or other determinations necessary for the construction of or receipt of revenues from the Project; or to make any other investigation or determination necessary for the financing, construction, operation or maintenance of the Project.
Site Assessment and Planning. Seller shall have the right, at its own expense, to assess the suitability of the Premises for the Project and shall act diligently in conducting such assessment. The assessment shall include the right to inspect the physical condition of the structures and/or land on which the Project will be located; to apply for any building permits or other governmental authorizations necessary for the construction of the Project; to arrange interconnections with the Local Electric Utility; to make any necessary applications to other agencies for the Project; to apply to any other governmental agencies or other persons for grants or other determinations necessary for the construction of or receipt of revenues from the Project; or to make any other investigation or determination necessary for the financing, construction, operation or maintenance of the Project.
Site Assessment and Planning. During the Initial Period , Provider shall have the right, at its own expense, to assess the suitability of the Premises for the Project and shall act diligently in conducting such assessment. The assessment shall include the right to inspect the physical condition of the structures on which the Project will be located; to apply for any building permits or other governmental authorizations necessary for the construction of the Project ; to arrange interconnections with the Local Electric Utility ; to make any applications to the appropriate Public Utilities Commission or other agencies for receipt of payments for the Project under the Applicable Solar Program ; to apply to any other governmental agencies or other persons for grants or other determinations necessary for the construction of or receipt of revenues from the Project ; or to make any other investigation or determination necessary for the financing, construction, operation or maintenance of the Project . [(4a) During the Initial Period Tioga will continue site assessment and planning activities begun during the negotiation of the PPA. These activities are intended to confirm that the project meets the minimum requirements for successful financing, construction and operation of the solar electric system. Tioga has the right to apply for the permits necessary to receive approval to build the solar electric system.]
Site Assessment and Planning. During the Initial Period of a Project, the Contractor shall provide all of the services described below at Contractor’s sole expense. All design and installation work shall be performed by qualified personnel that meet the license and experience requirements set forth in the RFP.
Site Assessment and Planning. For the purpose of this feasibility study, three (3) locations have been identified as potential sites for a future senior center, citywide recreation center and/or multi- generational recreation center. Based on the preferred program of requirements, develop a site plan with block floor plan concepts (as described by the Arlington PARD Staff) with the following considerations:
AutoNDA by SimpleDocs
Site Assessment and Planning. During the Initial Period, Seller shall have the right, at its own expense, to assess the suitability of the Site for the Project and shall act diligently in conducting such assessment. The assessment shall include the right to apply for any building permits or other governmental authorizations deemed by Seller to be necessary or desirable for the construction of the Project; to arrange interconnections with the Local Electric Utility; to apply to any other governmental agencies or other Persons for grants or other determinations deemed by Seller to be necessary or desirable for the construction of or receipt of revenues from the Project; or to make any other investigation or determination deemed by Seller to be necessary or desirable for the financing, construction, operation or maintenance of the Project. Seller shall make any current and available project construction budget available to Buyer at Buyer’s request. Buyer may terminate this Agreement, effective upon Thirty (30) days prior written notice to Buyer, on any date that is more than Twenty Four (24) months later than the Effective Date of this Agreement if Seller has not completed construction of the Project before the date of such notice. Upon such termination, Seller may require Buyer to pay to Seller the applicable Early Termination Amount. The Parties agree that during the Initial Period and the Operations Period, Seller shall have control of the Site, as the term “control” is contemplated by applicable law and by the requirements of the State of Rhode Island Distributed Generation Contracts Program (the “DG Program”). Seller and its employees, agents, advisors, lenders, and independent contractors may at all reasonable times during the Initial Period, and with reasonable prior notice, enter on and have access to the Site and the Property for the purpose of making inspections, performing tests, conducting surveys and investigations, performing due diligence, conducting reviews, and obtaining data. Buyer will make available to Seller and such representatives such information, documents, items, energy usage records, FAA filings, engineering reports, specifications of Buyer’s existing wind turbine located on the Property (the “Existing Turbine”), foundation designs, as-built’s and field job reports, lists of subcontractors and design professionals that provided services with respect to the Existing Turbine, wind studies, financial pro-forma’s created by Buyer or its consultants, books, records, ...

Related to Site Assessment and Planning

  • Environmental Assessment and Mitigation Development of a transportation project must comply with applicable environmental laws. The party named in article 1, Responsible Parties, under AGREEMENT is responsible for the following:

  • Conformity Assessment 1. The Parties recognize that a broad range of mechanisms exists to facilitate the acceptance of conformity assessment procedures and results thereby, including:

  • Environmental Assessment Buyer shall have the right for a period commencing upon execution of this Agreement by both parties and ending on November 28, 2012, to conduct an environmental assessment of the Assets, at Buyer’s sole risk, liability and expense. Seller shall make available to Buyer, during the environmental assessment period described above, Seller’s historical files regarding prior operations on the Assets, and provide Buyer and its representatives with reasonable access to the Assets to conduct the environmental assessment. Buyer shall provide Seller three (3) days prior written notice of a desired date(s) for such assessment and Seller shall have the right to be present during any assessment and, if any testing is conducted pursuant to Seller’s express prior written consent, Seller may require splitting of all samples. Notwithstanding any other provision of this Agreement to the contrary, Buyer shall not have the right to drill any test, monitor or other xxxxx or to extract samples of any air, soil, water or other substance from the Assets without Seller’s express prior written consent. If Buyer proposes a reasonable request to drill a test well or extract a sample pursuant to a systematic and customary procedure for the assessment of the environmental condition of the Assets and Seller refuses to grant its consent to such a well or sampling, then Buyer shall have the right, for a period of seventy-two (72) hours following notification of Seller’s refusal to consent, to deliver written notice to Seller of Buyer’s election to exclude from this transaction the portion of the Assets affected by such proposed test well or sample, and the Purchase Price shall be adjusted accordingly by the Allocated Value of such portion of the Assets so excluded. Under no circumstances whatsoever shall Seller ever be obligated to grant its consent to any such test xxxxx or sampling proposed by Buyer, and Buyer’s sole and exclusive remedy for any refusal by Seller to grant its consent shall be the limited right contained in the preceding sentence to exclude the affected Assets from the transactions contemplated by this Agreement. If Buyer fails to exercise the right to exclude such Assets by written notice to Seller delivered prior to the expiration of the seventy-two hour period described above, then Buyer shall be conclusively deemed to have waived such right and shall be obligated to purchase the affected Assets without conducting such testing or sampling or any adjustment of the Purchase Price unless otherwise provided in this Agreement.

  • Data Protection Impact Assessment and Prior Consultation Processor shall provide reasonable assistance to the Company with any data protection impact assessments, and prior consultations with Supervising Authorities or other competent data privacy authorities, which Company reasonably considers to be required by article 35 or 36 of the GDPR or equivalent provisions of any other Data Protection Law, in each case solely in relation to Processing of Company Personal Data by, and taking into account the nature of the Processing and information available to, the Contracted Processors.

  • Phase II A small portion of the work for the Phase II modifications to the Plattsburgh Substation will be performed by Transmission Owner, and the remainder will be performed by Clinton and Xxxxxxxxx. A detailed definition of the specific scope for Transmission Owner and Clinton and Xxxxxxxxx including interface points shall be defined during the design phase and, as such documents become available, copies will be delivered to the NYISO, Transmission Owner, Noble Altona Windpark, LLC and Marble River, LLC. The full scope includes the installation of wave traps, CCVT’s and modifications and/or additions to relaying on the MWP-1 and MWP- 2 lines. These lines will be reconfigured at the completion of Phase II to connect to Xxxxx and Xxxxxxx Substations on MWP-1 and the Xxxx Substation on MWP-2. Clinton and Xxxxxxxxx will design the upgrades and purchase the materials based on the outline specification that was prepared and issued by Transmission Owner. The work to be performed by Clinton and Xxxxxxxxx will include both the materials for the exterior and interior installations and items for Transmission Owner installation inside the control building in existing relay panels and communication racks. In addition, Clinton and Xxxxxxxxx will be responsible for the exterior and interior construction work and will provide construction management services in coordination with Transmission Owner. The civil design for the foundations and the electrical design for the cable runs to the control room will be designed by, as approved by Transmission Owner, and installed under the supervision and control of Clinton and Xxxxxxxxx. The equipment will be selected and procured in accordance with the specifications developed during the detailed engineering phase, copies of which shall be furnished to the NYISO, Transmission Owner, Noble Altona Windpark, LLC and Marble River, LLC. The construction of the foundations, structures, wave traps, CCTV and cable runs into the control building to the termination cabinets will be completed by Clinton and Xxxxxxxxx. The work at the Plattsburgh Substation will be installed under Transmission Owner’s CPP-1. Transmission Owner will provide Protection and Controls Engineering, install and terminate wiring from the termination cabinets to the control panels and relays, install relays and equipment in the existing panels, and will commission such work inside the 230kV control building. Transmission Owner will develop the communications protocols and data flow over the circuits.

  • Geotechnical Engineer « »« » « » « » « » « »

  • Phase I a. In Phase I, the project will be connected as a tap to the Transmission Owner’s 230kV transmission line MWP-2 via one 230kV circuit breaker in series with one of two ring bus breakers for stuck breaker protection (one in each direction) and a tie-line breaker, as shown on the one-line diagram labeled CL-E-IA-01 attached to this Appendix A as Figure 1. The changes to the existing MWP-2 line protection for this arrangement are described in Phase I System Upgrades in Section II of this Appendix A.

  • Lodgement of SWS wage assessment agreement C.6.1 All SWS wage assessment agreements under the conditions of this schedule, including the appropriate percentage of the relevant minimum wage to be paid to the employee, must be lodged by the employer with Fair Work Australia.

  • Comprehensive Assessment an initial and ongoing part of the member-centered planning process employed by the interdisciplinary team (IDT) to identify the member’s outcomes and the services and supports needed to help support those outcomes. It includes an ongoing process of using the knowledge and expertise of the member and caregivers to collect information about:

  • Diagnostic Assessment 6.3.1 Boards shall provide a list of pre-approved assessment tools consistent with their Board improvement plan for student achievement and which is compliant with Ministry of Education PPM (PPM 155: Diagnostic Assessment in Support of Student Learning, date of issue January 7, 2013).

Time is Money Join Law Insider Premium to draft better contracts faster.