Selection Criteria for Awarding Task Order The Government will award to the offeror whose proposal is deemed most advantageous to the Government based upon an integrated assessment using the evaluation criteria. The Government will evaluate proposals against established selection criteria specified in the task order RFP. Generally, the Government's award decision will be based on selection criteria which addresses past performance, technical acceptability, proposal risk and cost. Among other sources, evaluation of past performance may be based on past performance assessments provided by TO Program Managers on individual task orders performed throughout the life of the contract. The order of importance for the factors will be identified in the RFP for the specified task order.
Enhanced Optional Daily Usage File (EODUF 13.1 The EODUF service Agreement with terms and conditions is included in this Attachment as Exhibit C. Rates for EODUF are as set forth in Exhibit D.
Access Options You may withdraw or transfer funds from your account(s) in any manner we permit (e.g., at an automated teller machine, in person, by mail, Internet access, automatic transfer, or telephone, as applicable). We may return as unpaid any check or draft drawn on a form we do not provide, and you are responsible for any loss we incur handling such a check or draft. We have the right to review and approve any form of power of attorney and may restrict account withdrawals or transfers. We may refuse to honor a power of attorney if our refusal is conducted in accordance with applicable state law.
Enhanced Optional Daily Usage File 1. Upon written request from <<customer_name>>, BellSouth will provide the Enhanced Optional Daily Usage File (EODUF) service to <<customer_name>> pursuant to the terms and conditions set forth in this section. EODUF will only be sent to existing ODUF subscribers who request the EODUF option.
STRIKE PRICE 8.1 The “Base Year” applicable to this Contract for Difference is 2012.
Power Factor Design Criteria (Reactive Power A wind generating plant shall maintain a power factor within the range of 0.95 leading to 0.95 lagging, measured at the Point of Interconnection as defined in this LGIA, if the ISO’s System Reliability Impact Study shows that such a requirement is necessary to ensure safety or reliability. The power factor range standards can be met using, for example without limitation, power electronics designed to supply this level of reactive capability (taking into account any limitations due to voltage level, real power output, etc.) or fixed and switched capacitors if agreed to by the Connecting Transmission Owner for the Transmission District to which the wind generating plant will be interconnected, or a combination of the two. The Developer shall not disable power factor equipment while the wind plant is in operation. Wind plants shall also be able to provide sufficient dynamic voltage support in lieu of the power system stabilizer and automatic voltage regulation at the generator excitation system if the System Reliability Impact Study shows this to be required for system safety or reliability.
Standard Option The Connecting Transmission Owner shall design, procure, and construct the Connecting Transmission Owner’s Attachment Facilities and System Upgrade Facilities and System Deliverability Upgrades, using Reasonable Efforts to complete the Connecting Transmission Owner’s Attachment Facilities and System Upgrade Facilities and System Deliverability Upgrades by the dates set forth in Appendix B hereto. The Connecting Transmission Owner shall not be required to undertake any action which is inconsistent with its standard safety practices, its material and equipment specifications, its design criteria and construction procedures, its labor agreements, and Applicable Laws and Regulations. In the event the Connecting Transmission Owner reasonably expects that it will not be able to complete the Connecting Transmission Owner’s Attachment Facilities and System Upgrade Facilities and System Deliverability Upgrades by the specified dates, the Connecting Transmission Owner shall promptly provide written notice to the Developer and NYISO, and shall undertake Reasonable Efforts to meet the earliest dates thereafter.
Interconnection Product Options Interconnection Customer has selected the following (checked) type of Interconnection Service:
Tandem Transit Traffic 12.1 As used in this Section, Tandem Transit Traffic is Telephone Exchange Service traffic that originates on CBB's network, and is transported through Verizon’s Tandem to the subtending End Office or its equivalent of another carrier (CLEC, ILEC other than Verizon, Commercial Mobile Radio Service (CMRS) carrier, or other LEC (“Other Carrier”). Neither the originating nor terminating customer is a Customer of Verizon. Subtending End Offices shall be determined in accordance with and as identified in the Local Exchange Routing Guide (LERG). Switched Exchange Access Service traffic is not Tandem Transit Traffic.
Particular Methods of Procurement of Consultants’ Services 1. Quality- and Cost-based Selection. Except as otherwise provided in paragraph 2 below, consultants’ services shall be procured under contracts awarded on the basis of Quality and Cost-based Selection.