SEQUENCING AND SCHEDULING Sample Clauses

SEQUENCING AND SCHEDULING a. The Design-Builder must perform all required connections to the existing utility systems without disruption to existing services. If disruption of the existing services is required, do not proceed without the approval of the Architect and Commission Representative, requested not less than seven (7) days, in advance.
AutoNDA by SimpleDocs
SEQUENCING AND SCHEDULING. A. Owner will occupy portions of building immediately adjacent to work area. Conduct activities so Owner's operations will not be disrupted. Provide not less than 48 hours' notice to Owner of activities that will affect Owner's operations. – PRODUCTS
SEQUENCING AND SCHEDULING. A All Door Hardware shall be warranted by the local supplier and made good for a period of one year after the date of substantial completion. Improper installation, abuse, and lack of normal maintenance are not covered by this warranty. The Local Supplier’s warranty is not part of the Manufacturer’s warranty.
SEQUENCING AND SCHEDULING. A. Test, adjust, and balance the air systems before hydronic, steam, and refrigerant systems.
SEQUENCING AND SCHEDULING. A. Preparation work shall be limited to those areas that can be covered completely with the new shingle roof system on the same day or before the arrival of inclement weather.
SEQUENCING AND SCHEDULING. A. Construct erosion and sediment control system prior to commencing any work.
SEQUENCING AND SCHEDULING. A. Application of surface hardener shall take place at least 10 days prior to any floor mounted furniture or equipment installation within the space.
AutoNDA by SimpleDocs
SEQUENCING AND SCHEDULING. A. Unless otherwise specified, all Submittals required in this Section shall be submitted and approved prior to commencement of welding operations.
SEQUENCING AND SCHEDULING. 1.10.1. Contractor to prepare a sequence and schedule for performance of the work suitable to the Owner and the operations of the facility.
SEQUENCING AND SCHEDULING. A. Sequence installation of modified bituminous sheet roofing with related units of work specified in other sections to ensure that roof assemblies, including roof accessories, flashing, trim, and joint sealers, are protected against damage from effects of weather, corrosion, and adjacent construction activity.