Common use of SEQUENCE OF WORK Clause in Contracts

SEQUENCE OF WORK. Excavation, cleaning, laying, jointing and backfilling shall be kept up as closely as is possible so as to progress in a uniform, workmanlike manner. In no case shall pipe be left in the trench overnight, without completing jointing. The completed pipe line shall not be left exposed in the trench unnecessarily and the Contractor will be required to backfill and compact the trench as soon as possible after jointing and laying is completed. The Contractor shall keep exposed ends of pipe properly plugged during laying to prevent dirt and other materials entering the line. Each day at the close of work, and at all times when laying is not in progress the exposed end of the pipe line in the trench shall be closed by the use of an approved header or barrier of wood or metals. If at any time it becomes necessary to cover the ends of an uncompleted pipe line with backfill, the end of such pipe line shall be closed, using a header with mechanical joint plug.

Appears in 2 contracts

Samples: Advertised Contract, Advertised Contract

AutoNDA by SimpleDocs

SEQUENCE OF WORK. Excavation, cleaning, laying, jointing and backfilling shall be kept up as closely as is possible so as to progress in a uniform, workmanlike manner. In no case shall pipe be left in the trench overnight, without completing jointing. The completed pipe line shall not be left exposed in the trench unnecessarily and the Contractor will be required to backfill and compact the trench as soon as possible after laying and jointing and laying is completed. The Contractor shall keep exposed ends of pipe properly plugged during laying to prevent dirt and other materials entering the line. Each day at the close of work, and at all times when laying is not in progress the exposed end of the pipe line in the trench shall be closed by the use of an approved header or barrier of wood or metals. If at any time it becomes necessary to cover the ends of an uncompleted pipe line with backfill, the end of such pipe line shall be closed, using a header with mechanical joint plug.

Appears in 2 contracts

Samples: Advertised Contract, Advertised Contract

AutoNDA by SimpleDocs
Time is Money Join Law Insider Premium to draft better contracts faster.