SEQUENCE OF CONSTRUCTION Sample Clauses

SEQUENCE OF CONSTRUCTION. It is essential that the construction proceed with no interference to Railroad operations. Continuity of safe rail operation will be required for the duration of the project. The Applicant should contact the Railroad Local Representative in the preliminary design stages to determine the Railroad operation requirements. The most effective method for maintaining traffic is to temporarily reroute Railroad traffic around the construction site using detour tracks (shooflys). Shooflys shall be designed per Section 4.1.1. The use of shooflys for the construction of the permanent structures will minimize traffic interference with railroad operations. However, if construction requires interruption of rail traffic or track and time windows, approval from the Local Service Unit Superintendent of the area is required. No design shall advance without written approval. Prior to the start of any construction on Railroad right-of-way, a Railroad Right-of-Entry Agreement (if applicable) is required per Section 2.3.
AutoNDA by SimpleDocs
SEQUENCE OF CONSTRUCTION. Sequence of construction. Due to the utility relocation work described in the utility duct bank construction note, the City has developed a suggested sequence of construction to allow for efficient execution of the Work. The Contractor shall be responsible for maintaining a safe and stable site during all phases of the Work. The following general sequence is suggested for the Contractor’s use:
SEQUENCE OF CONSTRUCTION. A. Procedures for the installation of the low pressure sewage pump station and are as follows: 1. Install the low pressure sewage pump station at the location designated in the Drawings. 2. Connect the discharge line from the effluent pump to the force main. 3. Install a conduit from the 120V Power Supply plug-in to the low pressure sewage grinder pump
SEQUENCE OF CONSTRUCTION. All work shall be completed in accordance with the Traffic-Related Work Restrictions indicated in the Transportation Management Plan.
SEQUENCE OF CONSTRUCTION. A. Constructing the proposed improvements while maintaining existing operations will require a specific sequence of constructing portions of this project. The Contractor will be allowed as much flexibility as possible in scheduling the details of the project. The Contractor shall provide a detailed schedule as required in Section 01325.
SEQUENCE OF CONSTRUCTION. The scheduling of construction work is dependent on providing an uninterrupted water service to the residents in the Anahola Farm Lots Subdivision. The source of potable water will change throughout the construction of the Phase II improvements as certain elements of the existing water system are taken offline. In order to maintain uninterrupted water service, the water source phases and associated work tasks shall follow the suggested order below:
SEQUENCE OF CONSTRUCTION. A. For the protection of life and property, all backfill operations shall follow closely behind excavations when possible. The Contractor shall insure that no excavation be left open, unguarded, or water filled during any period of time when work is not actually in progress. It is the purpose and intent that all excavations and backfill, including consolidation operations, the installation of service connections and temporary surfacing within an area be accomplished expeditiously before proceeding to other work areas.
AutoNDA by SimpleDocs
SEQUENCE OF CONSTRUCTION. The Design-Build Firm shall construct the work in a logical manner and with the following objectives as guides:

Related to SEQUENCE OF CONSTRUCTION

  • DAF Construction The DAF shall be designed and constructed in accordance with Good Utility Practice. Within one hundred twenty (120) Calendar Days after the Commercial Operation Date, unless the Developer and Connecting Transmission Owner agree on another mutually acceptable deadline, the Developer shall deliver to the Connecting Transmission Owner and NYISO “as- built” drawings, information and documents for the DAF, such as: a one-line diagram, a site plan showing the Large Generating Facility and the DAF, plan and elevation drawings showing the layout of the DAF, a relay functional diagram, relaying AC and DC schematic wiring diagrams and relay settings for all facilities associated with the Developer’s step-up transformers, the facilities connecting the Large Generating Facility to the step-up transformers and the DAF, and the impedances (determined by factory tests) for the associated step-up transformers and the Large Generating Facility. The Developer shall provide to, and coordinate with, Connecting Transmission Owner and NYISO with respect to proposed specifications for the excitation system, automatic voltage regulator, Large Generating Facility control and protection settings, transformer tap settings, and communications, if applicable.

  • ICIF Construction The ICIF shall be designed and constructed in accordance with Good Utility Practice. Within one hundred twenty (120) Calendar Days after the Commercial Operation Date, unless the Parties agree on another mutually acceptable deadline, Interconnection Customer shall deliver to Transmission Provider and Transmission Owner “as-built” drawings, information and documents for the ICIF, such as: a one-line diagram, a site plan showing the Generating Facility and the ICIF, plan and elevation drawings showing the layout of the ICIF, a relay functional diagram, relaying AC and DC schematic wiring diagrams and relay settings for all facilities associated with the Interconnection Customer’s step-up transformers, the facilities connecting the Generating Facility to the step-up transformers and the ICIF, and the impedances (determined by factory tests) for the associated step-up transformers and the Generating Facility. Interconnection Customer shall provide Transmission Provider and Transmission Owner with Interconnection Customer’s specifications for the excitation system, automatic voltage regulator, Generating Facility control and protection settings, transformer tap settings, and communications, if applicable.

  • Completion of Construction (a) For the purposes of this Agreement, the terms "

  • Cost of Construction 1. During the Schematic Design, Design Development, and Construction Document Phases, the ARCHITECT’s estimates of Construction Cost shall be reconciled against the Budget approved by the DISTRICT pursuant to Article IV, Section 2.

  • MONITORING OF CONSTRUCTION 13.1 Monthly progress reports During the Construction Period, the Concessionaire shall, no later than 7 (seven) days after the close of each month, furnish to the Authority and the Independent Engineer a monthly report on progress of the Construction Works and shall promptly give such other relevant information as may be required by the Independent Engineer.

  • Special Construction If, after an order is placed, Xxxxxxx finds that third-party special construction services are needed to build, configure or install any additional facilities and/or equipment necessary for Verizon to provide Access service, Verizon will notify the Customer of any such special construction charges. If Customer does not accept the special construction charges, Customer may terminate the order(s) affected by the special construction charges, with no cancellation fee(s).

  • ADDITIONAL CONSTRUCTION The Promoter undertakes that it has no right to make additions or to put up additional structure(s) anywhere in the Project after the building plan has been approved by the competent authority (ies) except for as provided in the Act.

  • Governing Law; Construction This Agreement and any claim, counterclaim or dispute of any kind or nature whatsoever arising out of or in any way relating to this Agreement (“Claim”), directly or indirectly, shall be governed by, and construed in accordance with, the laws of the State of New York. The section headings in this Agreement have been inserted as a matter of convenience of reference and are not a part of this Agreement.

  • ADDITIONAL CONSTRUCTIONS The Promoter undertakes that it has no right to make additions or to put up additional structure(s) anywhere in the Project after the building plan has been approved by the competent authority(ies) except for as provided in the Act.

  • Commencement of Construction Construction of the Project will start within thirty (30) days after notification to the Developer by the Owner, or as soon thereafter as weather and ground conditions permit.