SEISMIC BRACING Sample Clauses

SEISMIC BRACING. Provide splayed bracing wires as shown and required by the Uniform Building Code. Provide compression struts at 12'-0" o.c., both directions fastened to the main runner and a structural member above. Repair, Cleaning and Completion: Remove and replace all discolored, broken or damaged materials. Completed ceilings shall present a smooth level surface free of edge or corner offsets, cupping, scratches, gouges or other defects. Clean exposed surfaces and remove foreign matter.
SEISMIC BRACING. All fixtures, equipment, suspended ceiling systems, other equipment, and piping supported from the structure above shall be seismically braced in accordance with local codes and good engineering design.
SEISMIC BRACING. Where appropriate for the Work to be performed, Subcontractor shall provide all applicable seismic bracing for Subcontractor’s work in accordance with seismic zone requirements and any applicable building codes. If no seismic zone is indicted in the Contract Documents, Subcontractor shall utilize seismic Zone D.

Related to SEISMIC BRACING

  • Condominiums/Planned Unit Developments If the Mortgaged Property is a condominium unit or a planned unit development (other than a de minimis planned unit development) such condominium or planned unit development project such Mortgage Loan was originated in accordance with, and the Mortgaged Property meets the guidelines set forth in the Originator's Underwriting Guidelines;

  • Excavation If any excavation shall be made upon land adjacent to or under the Building, or shall be authorized to be made, Tenant shall afford to the person causing or authorized to cause such excavation, license to enter the Premises for the purpose of performing such work as said person shall deem necessary or desirable to preserve and protect the Building from injury or damage and to support the same by proper foundations, without any claim for damages or liability against Landlord and without reducing or otherwise affecting Tenant’s obligations under this Lease.

  • Partnership Property All property, real, personal, tangible, intangible, or mixed, acquired by or contributed to the Partnership shall be owned by the Partnership and titled in its name and such property shall not be owned individually by any Partner. Each Partner acknowledges and agrees that the System and all elements thereof, are the exclusive property of the Company and are not Partnership property. Each Partner acknowledges and agrees that the Proprietary Marks are the exclusive property of the Company and are not Partnership property. Each Partner acknowledges and agrees that the Partnership shall not acquire or own any land or buildings. Any land or buildings used in the Partnership business shall be acquired and owned by the Company or an Affiliate of the Company and leased to the Partnership at reasonable rates and terms, and such land and buildings shall not be Partnership property.

  • No Light, Air or View Easement Any diminution or shutting off of light, air or view by any structure which may be erected on lands adjacent to or in the vicinity of the Building shall in no way affect this Lease or impose any liability on Landlord.

  • Project 3.01. The Recipient declares its commitment to the objectives of the Project. To this end, the Recipient shall carry out the Project in accordance with the provisions of Article IV of the General Conditions.

  • ADJACENT EXCAVATION-SHORING 32. If an excavation shall be made upon land adjacent to the demised premises, or shall be authorized to be made, Tenant shall afford to the person causing or authorized to cause such excavation, license to enter upon the demised premises for the purpose of doing such work as said person shall deem necessary to preserve the wall or the building of which demised premises form a part from injury or damage and to support the same by proper foundations without any claim for damages or indemnity against Owner, or diminution or abatement of rent.

  • Infrastructure (a) The Borrower has and will maintain a sufficient infrastructure to conduct its business as presently conducted and as contemplated to be conducted following its execution of this Agreement.

  • Sub-Contracting 31.1. The Authority approves the appointment of the sub-contractors specified in Schedule 10 (Approved Sub-contractors) in respect of the obligations specified in that Schedule.

  • Plant The expression ‘Plant’ as used in the tender papers shall mean every temporary accessory necessary or considered necessary by the Engineer to execute, construct, complete and maintain the work and all altered, modified, substituted and additional works ordered in the time and the manner herein provided and all temporary materials and special and other articles and appliance of every sort kind and description whatsoever intended or used therefore.

Time is Money Join Law Insider Premium to draft better contracts faster.