SECTION 908 - TRAFFIC CONTROL Sample Clauses

SECTION 908 - TRAFFIC CONTROL. PLAN (Item 90802 - Traffic Control Plan) Work shall not proceed until all conditions of this section are met. Failure to meet these conditions shall result in a stop work order as per Section 106.07 Suspension of Work. SCHEDULE B IDENTIFICATION OF PRINCIPALS Name of Contractor: Mailing Address: Telephone: Fax: Principal's Name: Title: Mailing Address: If Contractor is a corporation in which province of Canada is the corporation registered: Item Description and Price Estimated Quantity Contractor Total Price EXCAVATION: PAVEMENT Section: 203 Item: 20303 EXCAVATION: EARTH WASTE Section: 203 Item: 20307 TOPSOIL:REMOVE & REINSTATE Section: 204 Item: 20401 BORROW: SELECT Section: 206 Item: 20604 GRANULAR BASE: A PER M3 $ PER M3 200.00 $ 100 PER M3 $ PER M3 200.00 $ 100 PER M3 $ PER M3 100.00 $ 100 PER M3 $ PER M3 100.00 $ 100 Section: 207 Item: 20701 Major Item PER Tonnes FINE GRADING Section: 208 Item: 20801 $ PER Tonnes 600.00 $ 100 PER Square Metr $ PER M2 40.00 $ 100 Total Carried Forward $ From Previous Page Total Carried Forward $ Item Description and Price Estimated Quantity Contractor Total Price SHOULDER MAT: RAP Section: 211 Item: 21112 TOPSOIL: LANDSCAPING Section: 212 Item: 21202 ASPHALT CEMENT PER M3 $ PER M3 60.00 $ 100 PER M3 $ PER M3 100.00 $ 100 Section: 501 Item: 50101 Major Item PER Tonnes TACK COAT Section: 601 Item: 60101 ASPHALT BASE: A $ PER Tonnes 35.00 $ 100 PER Square Metr $ PER M2 1,825.00 $ 100 Section: 603 Item: 60301 Major Item PER Tonnes ASPHALT SEAL: B $ PER Tonnes 300.00 $ 100 Section: 603 Item: 60350 Major Item PER Tonnes $ PER Tonnes 215.00 $ 100 Total Carried Forward $ From Previous Page Total Carried Forward $ Item Description and Price Estimated Quantity Contractor Total Price COLD PLANE CONST. JOINT Section: 705 Item: 70501 CUTTING PAVEMENT Section: 710 Item: 71001 WATER FOR DUST Section: 802 Item: 80201 HYDROSEEDING Section: 803 Item: 80302 MULCHING Section: 805 Item: 80501 SILT FENCE: TYPE 1 Section: 806 Item: 80602 PER Square Metr $ PER M2 125.00 $ 100 PER Metres $ PER M 15.00 $ 100 PER kl $ PER kl 50.00 $ 100 PER Square Metr $ PER M2 670.00 $ 100 PER Square Metr $ PER M2 670.00 $ 100 PER Metres $ PER M 20.00 $ 100 Total Carried Forward $ From Previous Page Total Carried Forward $ Item Description and Price Estimated Quantity Contractor Total Price SIGNALLERS Section: 901 Item: 90101 PER hrs Twenty Dollars and 78 Cents $ 20.78 PER hrs 480.00 $ 9,974.40 100 PAVEMENT EDGE DELINEATOR Section: 904 Item: 90401 TEMPORARY MARK...
AutoNDA by SimpleDocs
SECTION 908 - TRAFFIC CONTROL. PLAN (Item 90802 - Traffic Control Plan) Work shall not proceed until all conditions of this section are met. Failure to meet these conditions shall result in a stop work order as per Section 106.07 Suspension of Work.
SECTION 908 - TRAFFIC CONTROL. PLAN (Item 90802 - Traffic Control Plan) Work shall not proceed until all conditions of this section are met. Failure to meet these conditions shall result in a stop work order as per Section 106.07 Suspension of Work. SCHEDULE B IDENTIFICATION OF PRINCIPALS Name of Contractor: Mailing Address: Telephone: Fax:
SECTION 908 - TRAFFIC CONTROL. PLAN (Item 90802 - Traffic Control Plan) Work shall not proceed until all conditions of this section are met. Failure to meet these conditions shall result in a stop work order as per Section 106.07 Suspension of Work. SCHEDULE B IDENTIFICATION OF PRINCIPALS Name of Contractor: Mailing Address: Telephone: Fax: Principal's Name: Title: Mailing Address: If Contractor is a corporation in which province of Canada is the corporation registered: Project Number: 5196 Department of Transportation Infrastucture & Energy XXX 00 - XXXXXXXX XXXX 00000 Xxxxxxxx: 4229 Length: 1.050 k Province of Xxxxxx Xxxxxx Island schedule of item for tender 09 Apr 2019 Item Description and Price Estimated Quantity Contractor Total Price ASPHALT CEMENT Section: 501 Item: 50101 TACK COAT Section: 601 Item: 60101 ASPHALT SEAL: B Section: 603 Item: 00000 XXXX XXXXX CONST. JOINT Section: 705 Item: 70501 COLD PLANE AND STOCKPILE Section: 716 Item: 71601 SIGNALLERS Section: 901 Item: 90101 PER Tonnes $ PER Tonnes 81.00 $ 000 XXX Xxxxxx Metr $ PER M2 11,000.00 $ 100 PER Tonnes $ PER Tonnes 1,350.00 $ 000 XXX Xxxxxx Metr $ PER M2 100.00 $ 000 XXX Xxxxxx Metr $ PER M2 11,000.00 $ 100 PER hrs Seventeen Dollars and 19 Cents $ 17.19 PER hrs 100.00 $ 1,719.00 100 Total Carried Forward $ From Previous Page Total Carried Forward $ Project Number: 5196 Department of Transportation Infrastucture & Energy XXX 00 - XXXXXXXX XXXX 00000 Xxxxxxxx: 4229 Length: 1.050 k Province of Xxxxxx Xxxxxx Island schedule of item for tender 09 Apr 2019 Item Description and Price Estimated Quantity Contractor Total Price TEMPORARY OVERLAY MARKERS (TOMS) Section: 905 Item: 90506 TRAFFIC CONTROL PLAN Section: 908 Item: 90802 PER unit $ PER unit 40.00 $ 100 PER hrs Twenty-Five Dollars and 00 Cents $ 25.00 PER hrs 25.00 $ 625.00 100 Total Carried Forward $ From Previous Page Total Carried Forward $ HST $ Grand Total$ Route 17 – Montague Main Street 2019 Page 11 of 12 Rev. 0 SCHEDULE D SCHEDULE OF EQUIPMENT TO BE USED ON THE WORK Route 17 – Montague Main Street 2019 Page 12 of 12 Rev. 0

Related to SECTION 908 - TRAFFIC CONTROL

  • Traffic Control The Surveyor shall control traffic in and near surveying operations adequately to comply with provisions of the latest edition of the Texas Manual on Uniform Traffic Control Devices – Part VI which can be found on the State’s internet site. In the event field crew personnel must divert traffic or close traveled lanes, a Traffic Control Plan based upon principles outlined in the latest edition of the Texas Manual on Uniform Traffic Control Devices – Part VI shall be prepared by the Surveyor and approved by the State prior to commencement of field work. A copy of the approved plan shall be in the possession of field crew personnel on the job site at all times and shall be made available to the State’s personnel for inspection upon request.

  • Supervisory Control and Data Acquisition (SCADA) Capability The wind plant shall provide SCADA capability to transmit data and receive instructions from the ISO and/or the Connecting Transmission Owner for the Transmission District to which the wind generating plant will be interconnected, as applicable, to protect system reliability. The Connecting Transmission Owner for the Transmission District to which the wind generating plant will be interconnected and the wind plant Developer shall determine what SCADA information is essential for the proposed wind plant, taking into account the size of the plant and its characteristics, location, and importance in maintaining generation resource adequacy and transmission system reliability in its area.

  • EVENTS OUTSIDE OUR CONTROL 7.1 We will not be liable or responsible for any failure to perform, or delay in performance of, any of Our obligations under these Terms that is caused by an Event Outside Our Control.

  • CHILD AND DEPENDENT ADULT/ELDER ABUSE REPORTING CONTRACTOR shall establish a procedure acceptable to ADMINISTRATOR to ensure that all employees, agents, subcontractors, and all other individuals performing services under this Agreement report child abuse or neglect to one of the agencies specified in Penal Code Section 11165.9 and dependent adult or elder abuse as defined in Section 15610.07 of the WIC to one of the agencies specified in WIC Section 15630. CONTRACTOR shall require such employees, agents, subcontractors, and all other individuals performing services under this Agreement to sign a statement acknowledging the child abuse reporting requirements set forth in Sections 11166 and 11166.05 of the Penal Code and the dependent adult and elder abuse reporting requirements, as set forth in Section 15630 of the WIC, and shall comply with the provisions of these code sections, as they now exist or as they may hereafter be amended.

Time is Money Join Law Insider Premium to draft better contracts faster.