Secondary Containment Systems Sample Clauses

Secondary Containment Systems. The Contractor shall provide for secondary containment equivalent to 110% of the tank capacity of chemical (retardant) and fuel tanks to ensure containment of all chemicals that escape from the mixing system and portable tanks, in order to prevent runoff into year-round or seasonal water sources.
AutoNDA by SimpleDocs

Related to Secondary Containment Systems

  • Secondary Systems The Developer and Connecting Transmission Owner shall each cooperate with the other in the inspection, maintenance, and testing of control or power circuits that operate below 600 volts, AC or DC, including, but not limited to, any hardware, control or protective devices, cables, conductors, electric raceways, secondary equipment panels, transducers, batteries, chargers, and voltage and current transformers that directly affect the operation of Developer or Connecting Transmission Owner’s facilities and equipment which may reasonably be expected to impact the other Party. The Developer and Connecting Transmission Owner shall each provide advance notice to the other Party, and to NYISO, before undertaking any work on such circuits, especially on electrical circuits involving circuit breaker trip and close contacts, current transformers, or potential transformers.

  • Verizon Operations Support Systems Verizon systems for pre- ordering, ordering, provisioning, maintenance and repair, and billing.

  • Account Management 15.1 The Contractor is required to provide a dedicated Strategic Account Manager who will be the main point of contact for the Authority. The Strategic Account Manager will:  Attend quarterly, or as otherwise agreed, review meetings with the Authority, in person at the Authority’s premises or other locations as determined by the Authority  Attend regular catch-up meetings with the Authority, in person or by telephone/videoconference  Resolve any on-going operational issues which have not been resolved by the Contractor or Account Manager(s) and therefore require escalation  Ensure that the costs involved in delivering the Framework are as low as possible, whilst always meeting the required standards of service and quality.

  • Configuration Management The Contractor shall maintain a configuration management program, which shall provide for the administrative and functional systems necessary for configuration identification, control, status accounting and reporting, to ensure configuration identity with the UCEU and associated cables produced by the Contractor. The Contractor shall maintain a Contractor approved Configuration Management Plan that complies with ANSI/EIA-649 2011. Notwithstanding ANSI/EIA-649 2011, the Contractor’s configuration management program shall comply with the VLS Configuration Management Plans, TL130-AD-PLN-010-VLS, and shall comply with the following:

  • Branding for Operator Call Processing and Directory Assistance 8.4.1 BellSouth's branding feature provides a definable announcement to Telepak Networks end users using Directory Assistance (DA)/ Operator Call Processing (OCP) prior to placing such end users in queue or connecting them to an available operator or automated operator system. This feature allows Telepak Networks’ name on whose behalf BellSouth is providing Directory Assistance and/or Operator Call Processing. Rates for the branding features are set forth in Exhibit D.

  • Supply Chain Monitoring A copy of the supply chain monitoring process, which should include details of the process for monitoring the financial viability of the supply chain (including timing), together with any known risks to supply chain stability and material changes to the supply chain. This should include extracts from Board level meetings, risk registers etc where any of the above items have been discussed. Annex 1 1 Information from Contractors who are not required to submit form AR01 to Companies House

  • Construction Administration Services The Engineer shall perform construction administration services during construction as necessary. Such services shall, as part of the services to be rendered for the Engineer's established fee, include as much of the Engineer's professional services and the services of the Engineer's consultants as the State deems necessary for the well-being of the project and efficient prosecution of the construction work, but shall not include the Engineer's undertaking continuous on-site observation of the work. If the Engineer fails to perform such duties in a conscientious and reasonable manner, the State may exercise its right to terminate this contract as hereinafter provided in Section T. Additionally, it is understood and agreed to by the Engineer and the State that the duties of the Engineer shall include, but not be limited to, the following services:

  • Monitoring Services IDT staff shall, using methods that include face-to-face and other contacts with the member, monitor the services a member receives. This monitoring shall ensure that:

  • Program Management 1.1.01 Implement and operate an Immunization Program as a Responsible Entity

Time is Money Join Law Insider Premium to draft better contracts faster.