Sealing of Metering System Sample Clauses

Sealing of Metering System. The Metering System and the Back-Up Metering System shall comply with the specifications in Schedule 4 and shall be jointly sealed. Such seals shall be broken only by BPDB personnel. The Company shall be given at least fourteen (14) Days advance notice of the breaking of seals on the Metering System or the Back-Up Metering System; provided, however, that no such notice will be necessary when the breaking of a seal is necessitated by the occurrence of an Emergency. Such notice will specify the time at which a meter seal will be broken by BPDB and the Company will be given the opportunity to be present when such seals are broken.
AutoNDA by SimpleDocs
Sealing of Metering System. The Metering System and the Back- Up Metering System shall comply with the specifications in Schedule 5 and shall be jointly sealed. During testing or any other reasons, the seal can be broken jointly (if required).
Sealing of Metering System. The Metering System and the Back- Up Metering System shall comply with the specifications in Schedule 5 and shall be jointly sealed. Such seals shall be broken only by BPDB personnel. The Company shall be given at least fourteen
Sealing of Metering System. (a) The Metering System and the Back-Up Metering System shall be jointly sealed by the Parties.
Sealing of Metering System. (a) The Metering System and any Backup Metering System shall be jointly and doubly sealed. Seals on the Metering System and any Backup Metering System shall be broken by Enercal personnel or Goro Nickel personnel, but only in the presence of one another, or if required by the ESA Coordinating Committee, only in the presence of an independent party, unrelated, directly or indirectly to either Party and mutually agreeable to the Parties (Independent Party) and only when the Metering System or any Backup Metering System is to be inspected, tested or adjusted in accordance with the terms of this Agreement.

Related to Sealing of Metering System

  • Metering The Interconnection Customer shall be responsible for the Connecting Transmission Owner’s reasonable and necessary cost for the purchase, installation, operation, maintenance, testing, repair, and replacement of metering and data acquisition equipment specified in Attachments 2 and 3 of this Agreement. The Interconnection Customer’s metering (and data acquisition, as required) equipment shall conform to applicable industry rules and Operating Requirements.

  • Monitoring System In each case in which the Custodian has exercised delegated authority to place Assets with a Foreign Custodian, the Custodian shall establish a system, to re-assess or re-evaluate selected Foreign Custodians, at least annually in accordance with Rule 17f-5(c)(3).

  • Cost of Metering The Issuer shall not be obligated to pay any costs associated with the routine metering duties set forth in this Section 2, including the costs of installing, replacing and maintaining meters, nor shall the Issuer be entitled to any credit against the Servicing Fee for any cost savings realized by the Servicer as a result of new metering and/or billing technologies.

  • Interconnection 2.1.10 Startup Testing and Commissioning

  • Installation Where installation is required, Contractor shall be responsible for placing and installing the product in the required locations at no additional charge, unless otherwise designated on the Contract or purchase order. Contractor’s authorized product and price list shall clearly and separately identify any additional installation charges. All materials used in the installation shall be of good quality and shall be free of defects that would diminish the appearance of the product or render it structurally or operationally unsound. Installation includes the furnishing of any equipment, rigging, and materials required to install or replace the product in the proper location. Contractor shall protect the site from damage and shall repair damages or injury caused during installation by Contractor or its employees or agents. If any alteration, dismantling, excavation, etc., is required to achieve installation, the Contractor shall promptly restore the structure or site to its original condition. Contractor shall perform installation work so as to cause the least inconvenience and interference with Customers and with proper consideration of others on site. Upon completion of the installation, the location and surrounding area of work shall be left clean and in a neat and unobstructed condition, with everything in satisfactory repair and order.

  • Installation and Maintenance of Meters The Servicer shall cause to be installed, replaced and maintained meters in accordance with the Servicer Policies and Practices.

  • Heating, Ventilation and Air Conditioning Landlord shall furnish to the Premises heating, ventilation and air-conditioning (“HVAC”) in accordance with the Design Standards set forth in Exhibit D during Ordinary Business Hours. Landlord shall have access to all air-cooling, fan, ventilating and machine rooms and electrical closets and all other mechanical installations of Landlord (collectively, “Mechanical Installations”), and Tenant shall not construct partitions or other obstructions which may interfere with Landlord’s access thereto or the moving of Landlord’s equipment to and from the Mechanical Installations. No Tenant Party shall at any time enter the Mechanical Installations or tamper with, adjust, or otherwise affect such Mechanical Installations. Landlord shall not be responsible if the HVAC System fails to provide cooled or heated air, as the case may be, to the Premises in accordance with the Design Standards by reason of (i) any equipment installed by, for or on behalf of Tenant, which has an electrical load in excess of the average electrical load and human occupancy factors for the HVAC System as designed, or (ii) any rearrangement of partitioning or other Alterations made or performed by, for or on behalf of Tenant. Tenant shall install, if missing, blinds or shades on all windows, which blinds and shades shall be subject to Landlord’s approval, and shall keep operable windows in the Premises closed, and lower the blinds when necessary because of the sun’s position, whenever the HVAC System is in operation or as and when required by any Requirement. Tenant shall cooperate with Landlord and shall abide by the rules and regulations which Landlord may reasonably prescribe for the proper functioning and protection of the HVAC System. Tenant acknowledges that the server room in the Premises currently has three heat pumps installed, being two 4-ton units, and one 2.5-ton unit (the “Existing Heat Pumps”). The 2.5-ton unit is currently connected and operational. Tenant shall determine whether it is satisfied with the condition of the Existing Heat Pumps and Landlord shall not have any responsibility or liability for the condition, operation, maintenance, repair or replacement of the Existing Heat Pumps. Tenant may operate the Existing Heat Pumps. Tenant shall be responsible for, and pay directly for, all necessary maintenance and repairs to the Existing Heat Pumps. Tenant shall reimburse Landlord monthly for the cost of all utility services used to operate the Existing Heat Pumps within 10 Business Days after receipt of Landlord’s invoice for such amount. Landlord may measure Tenant’s usage of such utility services by either a sub-meter or by other reasonable methods such as by temporary check meters or by survey. Tenant, at its cost, may replace the Existing Heat Pumps with one or more new heat pumps, provided, however, that the capacity of such replacement heat pump(s) shall not exceed the 10.5-ton capacity cooling capacity of the Existing Heat Pumps.

  • Delivery Point (a) All Energy shall be Delivered hereunder by Seller to Buyer at the Delivery Point. Seller shall be responsible for the costs of delivering its Energy to the Delivery Point consistent with all standards and requirements set forth by the FERC, ISO-NE, the Interconnecting Utility and any other applicable Governmental Entity and any applicable tariff.

  • Floor Loading Floor loading capacity shall be within building design capacity. Tenant may exceed floor loading capacity with Landlord’s consent, at Landlord’s sole discretion and must, at Tenant’s sole cost and expense, reinforce the floor as required for such excess loading.

Time is Money Join Law Insider Premium to draft better contracts faster.