Scope of Construction Work Sample Clauses

Scope of Construction Work. The Concessionaire shall construct the Regional MSW Facility in accordance with the Standards and Specifications as provided under this Agreement and the Project Plan which is approved by State Govt. which shall include:
AutoNDA by SimpleDocs
Scope of Construction Work. Public Agency hereby acknowledges and agrees that the scope of work shall be limited to, and Design/Builder shall only perform, the following: Lighting Fixture Upgrades – See Schedule 1 for lighting fixture/lamp Scope of Work. Fixture lenses – In coordination with the Public Agency, Design/Builder will document and replace damaged, missing, or discolored fixtures lenses. Replacement will be determined based upon matching lens availability and significance of the need with priority given to issues such as large cracks, missing pieces, missing lenses, or discoloration that reduces light output. Lens quantities will be limited based upon the total quantities found below. Ceiling tiles – In coordination with the Public Agency, Design/Builder will replace tiles that are either missing or those with greater than 1.5 square inches of damaged with a best possible match to original color and pattern at each site. Water‐stained ceiling tiles will be reported to the Public Agency and will not be replaced unless the Public Agency documents that specific leaks are corrected prior to the replacement work being executed on any site. Water‐stained ceiling tiles with greater than 50% damage will be replaced under this scope. Ceiling tile quantities will be limited based upon the total quantities found below. The combined allotment for ceiling tiles and light fixture lens quantity replacements per site: Site Qty Site Qty Xxxxx Elementary 43 Diablo View Middle School 79 Xxxxxxxx Elementary 63 Diablo Community Day 43 Bel Air Elementary 55 Silverwood Elementary 45 Hidden Valley Elementary 79 Foothill Middle 94 Meadow Homes Elementary 64 Xxxxxxx Gardens Elementary 67 Mountain View Elementary 46 Eagle Peak Montessori 14 Mt Diablo Elementary 60 Admin‐Dent Center 46 Olympic High School 50 Westwood elementary 41 Pine Hollow Middle School 101 El Dorado Middle School 85 Pleasant Hill Elementary 67 College Park High 166 Sequoia Elementary 54 Valley View Middle 76 Strandwood Elementary 45 Concord High School 197 Sun Terrace Elementary 54 El Monte Elementary 46 Valhalla Elementary 56 Glenbrook Middle School 89 Woodside Elementary 00 Xxxx Xxxxx Adult Center 87 Delta View Elementary 51 Monte Gardens Elementary 42 Fair Oaks Elementary 00 Xx. Diablo High 224 Highlands Elementary 00 Xxxxxxxxx Xxxx 000 Xxxxxxxx Elementary 00 Xxx Xxxxx Xxxxxx 00 Sequoia Middle 74 Transportation/M&O/Purchasing 98 Site Qty Site Qty Pleasant Hill Middle 146 Xxxxx Verde Elementary 61 Cambridge Elementary 85 Walnut...
Scope of Construction Work. Contractor agrees to furnish all labor, equipment and materials, including tools, implements, and appliances required, and to perform all the work in a good and workmanlike manner, free from any and all liens and claims from mechanics, material suppliers, subcontractors, artisans, machinists, teamsters, freight carriers, and laborers required for the Project, all in strict compliance with the Plans and Specifications therefor and other contract documents relating thereto. The Contractor and the District agree that all of the documents listed in Article 1.1.1 of the General Conditions (which General Conditions are attached hereto as Exhibit B) form the Contract Documents, which form the Contract (as defined therein). In accordance with Section 3300 of the Public Contract Code, Contractor has a Class B license that it shall maintain in good standing for the duration of Contractor’s work on the Project.

Related to Scope of Construction Work

  • DAF Construction The DAF shall be designed and constructed in accordance with Good Utility Practice. Within one hundred twenty (120) Calendar Days after the Commercial Operation Date, unless the Developer and Connecting Transmission Owner agree on another mutually acceptable deadline, the Developer shall deliver to the Connecting Transmission Owner and NYISO “as- built” drawings, information and documents for the DAF, such as: a one-line diagram, a site plan showing the Large Generating Facility and the DAF, plan and elevation drawings showing the layout of the DAF, a relay functional diagram, relaying AC and DC schematic wiring diagrams and relay settings for all facilities associated with the Developer’s step-up transformers, the facilities connecting the Large Generating Facility to the step-up transformers and the DAF, and the impedances (determined by factory tests) for the associated step-up transformers and the Large Generating Facility. The Developer shall provide to, and coordinate with, Connecting Transmission Owner and NYISO with respect to proposed specifications for the excitation system, automatic voltage regulator, Large Generating Facility control and protection settings, transformer tap settings, and communications, if applicable.

  • Completion of Construction Within 60 days of the completion of construction of the Project, Project Owner shall deliver to DoD copies of the FAA form 7460-2 for each ASN, including the final coordinates for each turbine erected.

  • ICIF Construction The ICIF shall be designed and constructed in accordance with Good Utility Practice. Within one hundred twenty (120) Calendar Days after the Commercial Operation Date, unless the Parties agree on another mutually acceptable deadline, Interconnection Customer shall deliver to Transmission Provider and Transmission Owner “as-built” drawings, information and documents for the ICIF, such as: a one-line diagram, a site plan showing the Generating Facility and the ICIF, plan and elevation drawings showing the layout of the ICIF, a relay functional diagram, relaying AC and DC schematic wiring diagrams and relay settings for all facilities associated with the Interconnection Customer’s step-up transformers, the facilities connecting the Generating Facility to the step-up transformers and the ICIF, and the impedances (determined by factory tests) for the associated step-up transformers and the Generating Facility. Interconnection Customer shall provide Transmission Provider and Transmission Owner with Interconnection Customer’s specifications for the excitation system, automatic voltage regulator, Generating Facility control and protection settings, transformer tap settings, and communications, if applicable.

  • ADDITIONAL CONSTRUCTIONS The Promoter undertakes that it has no right to make additions or to put up additional structure(s) anywhere in the Project after the building plan has been approved by the competent authority(ies) except for as provided in the Act.

  • Project Construction The Contractor agrees to provide continuous on-site supervision on each Job Order, while progress on the project is being accomplished. The Contractor’s Project Manager will ensure:

  • Contract Construction 6.27.1 The parties acknowledge that each party and its counsel have reviewed this CONTRACT and that the normal rule of construction to the effect that any ambiguities are to be resolved against the drafting party shall not be employed in the interpretation of this CONTRACT or any amendment or exhibits hereto.

Time is Money Join Law Insider Premium to draft better contracts faster.