Schematic Design Stage Sample Clauses

Schematic Design Stage. 5.9.2.1 Based on the approved Program of Requirements and the Amount Available for the Construction Contract authorized by the Owner, the Contractor shall develop sufficient alternative approaches to design and construction of the Project and review them with the Owner. The Contractor shall prepare Schematic Design documents and a preliminary Estimated Construction Costs and submit them to the Owner for approval. The Estimated Construction Costs shall affirm adherence to the Amount Available for the Construction Contract.
AutoNDA by SimpleDocs
Schematic Design Stage. 5.2.3.1 Based on the approved pre-design documents and any adjustments to the Facility Program or Construction Cost Limitation or the Project Schedule authorized by the Owner, the Design/Build Contractor shall develop sufficient alternative approaches to the design and construction of the Project and shall review them with the Owner. The Design/Build Contractor shall prepare Schematic Design documents and the Estimated Construction Cost and submit them to the Owner for approval. The Estimated Construction Cost shall affirm adherence to the Construction Cost Limitation. . The Design/Build Contractor shall advise the Owner of any adjustments to the project scope necessary to align the Estimated Construction Cost with the Construction Cost Limitation and shall revise the Schematic Design Documents, without charge to the Owner, as may be required to comply with the Construction Cost Limitation. The Owner may, solely at Owner’s discretion and in writing, increase or decrease the Construction Cost Limitation to align with the Design/Build Contractor’s Estimated Construction Cost.
Schematic Design Stage. 5.2.3.1 Based on the approved pre-design documents and any adjustments to the Facility Program or Construction Cost Limitation or the Project Schedule authorized by Owner, Design/Build Contractor shall develop sufficient alternative approaches to the design and construction of the Project and shall review them with Owner. Design/Build Contractor shall prepare Schematic Design documents and the Estimated Construction Cost and submit them to Owner for approval. The Estimated Construction Cost shall affirm adherence to the Construction Cost Limitation. . Design/Build Contractor shall advise Owner of any adjustments to the project scope necessary to align the Estimated Construction Cost with the Construction Cost Limitation and shall revise the Schematic Design Documents, without charge to Owner, as may be required to comply with the Construction Cost Limitation. Owner may, solely at Owner’s discretion and in writing, increase or decrease the Construction Cost Limitation to align with Design/Build Contractor’s Estimated Construction Cost.
Schematic Design Stage. 2.2.1 During the Schematic Design Stage, the AOR shall:
Schematic Design Stage. 3.1.1 Unless the Contracting Authority directs otherwise in writing, the Schematic Design Stage will begin upon completion of the activities described under Section 2.4.
Schematic Design Stage. 5.2.3.1 The Design/Build Contractor shall prepare the Schematic Design Documents and such construction cost estimates in accordance with Subparagraph 5.1.3 and in alignment with the procurement and bid/proposal package strategies required under Subparagraph 5.1.5 above and this Subparagraph 5.2.3 (collectively referred to as the “Preliminary Schematic Design Approval Package”) and submit them to the Owner for its initial review. Based on the pre-design documents reviewed by the Owner (and approved for proceeding to the next stage) and any adjustments to the Owner’s Design Requirements, the Project CPM Schedule, or CCL authorized by the Owner, the Design/Build Contractor shall develop sufficient alternative approaches to design and construction of the Project and review them with the Owner.
Schematic Design Stage. 5.9.2.1 Based on the approved Program of Requirements and the Amount Available for the Construction Contract authorized by the City, the Contractor shall develop sufficient alternative approaches to design and construction of the Project and review them with the City. The Contractor shall prepare Schematic Design documents and a preliminary Estimated Construction Costs and submit them to the City for approval. The Estimated Construction Costs shall affirm adherence to the Amount Available for the Construction Contract.
AutoNDA by SimpleDocs
Schematic Design Stage. 5.2.3.1 The Design/Build Contractor shall prepare the Schematic Design Documents and such construction cost estimates in accordance with Subparagraph 5.1.3 and in alignment with the procurement and bid/proposal package strategies required under Subparagraph 5.1.5 above and this Subparagraph 5.2.3 (collectively referred to as the “Preliminary Schematic Design Approval Package”) and submit them to the Owner for its initial review. Based on the pre-design documents reviewed by the Owner (and approved for proceeding to the next stage) and any adjustments to the Owner’s Design Requirements, the Project Schedule, or CCL authorized by the Owner, the Design/Build Contractor shall develop sufficient alternative approaches to design and construction of the Project and review them with the Owner.
Schematic Design Stage 

Related to Schematic Design Stage

  • Schematic Design See Section 2, Part 1, Article 2.1.4, Paragraph 2.1.4.2.

  • Schematic Design Phase INDICATE IN STATEMENT OF WORK “NOT APPLICABLE” IF SECTION IS NOT APPLICABLE

  • Schematic Design Documents In accordance with the approved Preliminary Design and Construction Schedule and based upon approval of and comments made by the Owner regarding the Concept Design Studies, the Design Professional shall prepare and submit to the Owner Schematic Design Documents, including drawings and outline specifications. These documents shall represent a further development of the approved design concept, providing additional detail and specificity regarding the intended design solution. Typically, all such documents shall be drawn to scale, indicating materials and assemblies, as appropriate, to convey the design intent and to illustrate the Project’s basic elements, scale and relationship to the Site. All major pieces of furniture and equipment to be fixed or supplied by the CM/GC shall be illustrated to scale. (See ASTM Standard Practice E 1804-02, August 2007, Sections 6.3, 8.2 and 8.3 for guidance on information which is generally developed in Schematic Design.)

  • Schematic Design Phase Services § 3.2.1 The Architect shall review the program and other information furnished by the Owner, and shall review laws, codes, and regulations applicable to the Architect’s services.

  • Design Professional to Design Work The Design Professional Contract requires the Design Professional to design and to prepare the Contract Documents, a copy of which shall be furnished to the Contractor upon request. The Design Professional Contract requires the Design Professional to designate a readily accessible representative (either on Site or by computer, phone or fax or otherwise) who shall have authority promptly to render decisions and to furnish information required of the Design Professional.

  • 253 Design Change (a) “Design Change” is a change in work and/or materials shown in the Schedule of Items and described in Plans or specifications that has been mutually agreed to in writing or ordered by Contracting Officer. Changes of a minor nature (such as adjustment in horizontal and vertical alignment, that do not exceed specified tolerance, necessary to maintain or balance earthwork quantities substantially as designed) and variation in quantities, as described in B5.251, shall not be considered Design Changes.

  • Preliminary Design Phase During the Preliminary Design Phase, the CONSULTANT shall, if requested by the CITY and accepted by the CONSULTANT as part of a Services Authorization:

  • Final Design Phase A. After acceptance by Owner of the Preliminary Design Phase documents, revised opinion of probable Construction Cost as determined in the Preliminary Design Phase, and/or any other Right of Way plan documents, subject to any Owner-directed modifications or changes in the scope, extent, character, or design requirements of or for the Project, and upon written authorization from Owner, Engineer shall:

  • Project Design Applicants must design a project that provides access to health services to enable eligible women and men experiencing health needs to secure and maintain safe and accessible quality screening and diagnostic services, comprehensive family planning, and/ or other women’s health services.

  • Design Criteria The Engineer shall develop the roadway design criteria based on the controlling factors specified by the State (i.e. 4R, 3R, 2R, or special facilities), by use of the funding categories, design speed, functional classification, roadway class and any other set criteria as set forth in PS&E Preparation Manual, Roadway Design Manual, Bridge Design Manual, Hydraulic Design Manual, and other deemed necessary State approved manuals. In addition, the Engineer shall prepare the Design Summary Report (DSR) and submit it electronically. The Engineer shall obtain written concurrence from the State prior to proceeding with a design if any questions arise during the design process regarding the applicability of State’s design criteria.