SAFETY CONDITIONS 1.0 The responsibility for providing for safe working conditions that are in conformance with applicable law and which are within fiscal constraints shall be the District’s. Employees shall be responsible for complying with safety procedures and practices and for reporting any unsafe condition, facility, or equipment of which he/she is aware. The District shall be responsible for informing employees of necessary safety procedures and practices. There shall be no reprisal against an employee for reporting any real or potentially unsafe condition, facility, or equipment.
SANITARY CONDITIONS The Employer agrees to maintain a clean, sanitary washroom hav- ing hot and cold running water with toilet facilities in all present and
Subsurface Conditions Unless the Contract Documents stipulate specific quantities and units of rock or unsuitable soils, the Contractor shall assume material below the surface of the Earth to be earth and other material that can be removed by power shovel or similar equipment. Should conditions encountered below the surface of the ground be at variance to the number of unit requirements as indicated by drawings or specifications, and absent an agreed-upon unit price established prior to the bid by Addendum, or after contract execution by Change Order, the Contract Sum and/or time shall be adjusted as provided in the Contract Documents for changes in the work.
Adverse Weather Conditions Except in emergency situations, the Employer shall not require an employee:
Sanitary and Phytosanitary Measures 1. The rights and obligations of the Parties in respect of sanitary and phytosanitary measures shall be governed by the WTO Agreement on the Application of Sanitary and Phytosanitary Measures.
Contract Conditions This section contains conditions which shall be complied with during the performance of this contract. The conditions come in two parts, general conditions and special contract requirements.
INCLEMENT CONDITIONS Section 1.
Committee on Sanitary and Phytosanitary Measures 1. The Parties hereby establish a Committee on Sanitary and Phytosanitary Measures (“Committee”), comprising representatives of each Party, who are responsible for sanitary and phytosanitary issues in the fields of animal and plant health, food safety and trade.
Hazardous Conditions The Contractor and Owner acknowledge that previously unknown hazardous conditions may be uncovered at any job site, and in particular where existing structures are being demolished and/or remodeled to accommodate new construction or to reutilize existing facilities. Should a hazardous condition not involving Hazardous Materials as set forth above be encountered on the Site, and should reasonable safety precautions be deemed by the Contractor in good faith to be inadequate to prevent foreseeable personal injury to persons encountering the hazardous condition, the Contractor shall, upon recognizing the hazardous condition, stop work in the affected area and immediately report the hazardous condition to the Design Professional and Owner in writing. The Owner shall undertake, or shall contract (by Change Order) with the Contractor or contract with a Separate Contractor, to resolve the condition. So long as the hazardous condition did not result from activities or substances brought on the Site by the Contractor, the Contractor is entitled to adjustments in the Contract Time and the Contract Sum as set forth in Paragraph 1.6.1.2 above.
Weather Conditions In the event of temporary suspension of work or during inclement weather or whenever the OWNER shall direct, the CONSTRUCTION MANAGER will, and will cause its Subcontractors to protect carefully its and their work and material against damage or injury from the weather. If, in the opinion of the OWNER, any Work or material shall have been damaged or injured by reason of failure on the part of the CONSTRUCTION MANAGER or any of its Subcontractors so to protect his work, said materials shall be removed and replaced at the expense of the CONSTRUCTION MANAGER.